Lightbulb Lucid Stews April report

https://youtu.be/btVyY0__elk?si=auBqrDSHFVLk3HL0

Worse yet, the newly released CHSR report states all new tunnels will initially be built as single track tunnels because the initial operating segment will operate as a single track line with passing sidings. They are single tracking the line to save enough cash to get something built sooner.

The double tracking and second tunnel will be built much, much later.

At the rate they are building CHSR, by the time they get to double tracking the line,, they will have to replace the original tracks.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:38 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.