Should be in that square plot north of Arens. They'd been dumping clay there to raise the ground. The field is a bit lower than the land south of it. The road on this side of the plot is Green Stone and the next is Welby Gate, with Kaufman being just after the Woodland Grove intersection. In the second picture Welby Gate is shown and Greenstone is just off screen to the left.
I forgot to mention the last time I was out there a few weeks ago work was being built in the SE corner of Arens / Woodland Grove intersection. Address of the parcel is 2910 Kaufman Way but I couldn't find a permit associated with it. Plot size suggests it should be a multi-unit project.
This is what I was wanting thank you for your response
The tender for the 3rd phase of the South Sewage Trunk project is out. I had to laugh at the type of pipe they are running through the RCMP grounds, "The trunk consists of watertight reinforced concrete microtunneling pipes (RCMPs)". Nearly the entirety of this years work from McCarthy to 13th Ave will be done using a small tunnel boring machine to install 78" pipe.
Work starts on the second north Albert Ring Road bridge March 23.
Long term care site from yesterday and some other photos from today. Assembling form work for the first part of second floor at the LTC, only one corner piece appears installed. Poured the second ground floor slab this week. A 3rd section of ground floor where the wings meet looks to be ready to be poured next week.
Moving fast on the Ronald McDonald house exterior. Starting 3rd floor walls at Toronto & 15th project. Took another picture of the aquatic center site.
I went to overlay a drawing of the aquatic centre on a map to see what part they are working on and it ended up being parking lot which didn't seem right. There was a site plan with the discretionary use permit application that shows a playground / spray pad in that area but further north, so maybe that layout isn't right either.
Long term care site from yesterday and some other photos from today. Assembling form work for the first part of second floor at the LTC, only one corner piece appears installed. Poured the second ground floor slab this week. A 3rd section of ground floor where the wings meet looks to be ready to be poured next week.
Moving fast on the Ronald McDonald house exterior. Starting 3rd floor walls at Toronto & 15th project. Took another picture of the aquatic center site.