Long term care site from yesterday and some other photos from today. Assembling form work for the first part of second floor at the LTC, only one corner piece appears installed. Poured the second ground floor slab this week. A 3rd section of ground floor where the wings meet looks to be ready to be poured next week.
Moving fast on the Ronald McDonald house exterior. Starting 3rd floor walls at Toronto & 15th project. Took another picture of the aquatic center site.
I went to overlay a drawing of the aquatic centre on a map to see what part they are working on and it ended up being parking lot which didn't seem right. There was a site plan with the discretionary use permit application that shows a playground / spray pad in that area but further north, so maybe that layout isn't right either.