Steel guideway spans across Highway 15 on Fraser Highway and over the Pacific Highway PPS are expected to be installed in spring 2026
Quote:
Track installation near 68 Avenue will start in spring 2026. This will include deliveries of rail, lifting rail
onto the elevated guideway, rail installation, welding, grinding, and concrete pouring activities. Expect
increased worker activity and equipment use on the elevated guideway, and intermittent, temporary lane
closures in the area during rail delivery and concrete pours.
Quote:
More than 1,500 of 4,400 concrete segments have
been produced.
https://surreylangleyskytrain.gov.bc...ter-2026-1.pdf
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:29 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.