Posted Feb 27, 2026, 4:07 PM
|
|
Registered User
|
|
Join Date: May 2017
Posts: 29,056
|
|
At these costs, it's time to look at how integration can save. I am guessing taking Line 2 across the river to connect to Gatineau buses and trams is probably cheaper. This way the entire tramway can be kept at grade in Gatineau. And they can build something similar to what KWC built with ION.
|