Sent around the office.
Aritzia escalators arrive next Monday and Tuesday.

Quote:
ATTENTION: All Office Tenants – Pacific Centre

WHAT: Escalator Delivery and Traffic Disruptions

WHEN: From 8:00 p.m. to 5:00 a.m. daily on the dates listed below:
Monday, March 2, 2026
Tuesday, March 3, 2026
IMPACT: A large shipment of new escalator equipment will be delivered by PCL Constructors Westcoast to the southwest corner of Robson and Howe Streets, requiring a two-lane closure of westbound lanes on Robson Street and the Easy Park parkade ramp.

Additionally, the north sidewalk on Robson Street and the east sidewalk on Howe Street will be closed. On-site flaggers will be present to manage the traffic and safely 🞵🞵🞵🞵🞵🞵 individuals exiting the building across the road.
Reply With Quote
     
     
  #4482  
Old Posted Feb 27, 2026, 6:27 PM
domusile domusile is offline
Registered User
 
Join Date: Nov 2014
Location: Vancouver
Posts: 369
Quote:
Originally Posted by officedweller View Post
Yeah, some sort of a meeting room (but how do you access it (other than the loading dock hall)?)
I'm surprised there is no stair next to that escalator (as shown in the plan below).
Could be to prevent shoplifters escaping downstairs or just to prevent shortcutters to the mall.

The ground floor plan also tells us where the Tenant 1 demising walls will be,
inserted in blue. Bigger ground floor than Aritzia!
Tenant 1 has an elevator at the back corner (shown on Aritizia plans)
but needs escalators.
I still think that Tenant 3 (Simons?) should have an entrance from Howe St.

PS - there's active construction building the Tenant 3 No. 731 entrance corridor.

I wonder which unit would Uniqlo take
Reply With Quote
     
     
  #4483  
Old Posted Feb 27, 2026, 11:00 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
Quote:
Originally Posted by officedweller View Post
Sent around the office.
Aritzia escalators arrive next Monday and Tuesday.
I think they're installing escalators for all the units.

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=263403515
Reply With Quote
     
     
  #4484  
Old Posted Feb 28, 2026, 12:19 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
That would explain why they need 2 days.
Reply With Quote
     
     
  #4485  
Old Posted Mar 1, 2026, 1:09 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Pics by me today:



Reply With Quote
     
     
  #4486  
Old Posted Mar 12, 2026, 1:18 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
By me today:





Quote:
Originally Posted by officedweller View Post
December 30th:
Reply With Quote
     
     
  #4487  
Old Posted Mar 12, 2026, 1:28 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
Seems like it'll be another six months at this rate. Maybe early/mid September
Reply With Quote
     
     
  #4488  
Old Posted Mar 12, 2026, 2:44 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
That's my guess too.
Reply With Quote
     
     
  #4489  
Old Posted Mar 22, 2026, 3:07 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
By me March 21st:



Reply With Quote
     
     
  #4490  
Old Posted Mar 22, 2026, 4:13 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
I wonder when they plan on starting the rezoning/development permit process.
Reply With Quote
     
     
  #4491  
Old Posted Mar 22, 2026, 6:15 PM
Glow Fun City's Avatar
Glow Fun City Glow Fun City is offline
deadhead raver Jew
 
Join Date: Jul 2025
Location: Vancouver
Posts: 361
Quote:
Originally Posted by jollyburger View Post
I wonder when they plan on starting the rezoning/development permit process.

You'd think they'd try to get something in before the election like everyone else is doing…
__________________
Nothin' shakin' on Shakedown Street
Used to be the heart of town
Don’t tell me this town ain’t got no heart
You just gotta poke around…
Reply With Quote
     
     
  #4492  
Old Posted Mar 22, 2026, 7:28 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
Quote:
Originally Posted by Glow Fun City View Post
You'd think they'd try to get something in before the election like everyone else is doing…
I doubt they can push anything through this year and it's either a hotel or hotel/residential right in the middle of downtown so I doubt there's going to be much pushback on this even from the biggest NIMBY in the city.
Reply With Quote
     
     
  #4493  
Old Posted Mar 27, 2026, 9:58 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Renovated mall ceiling.
Pics by me today.
I guess there are slats to come and the wavey chandeliers seem to have been kept.





Quote:
Originally Posted by officedweller View Post
Sent around the office today:



Current pics from Google search.
Looks like they are getting rid of the wood - making it more sterile.


https://lh3.googleusercontent.com/gps-cs...QP2fzvDpgCtILexu2lHm1O=s680-w680-h510-rw


https://lh3.googleusercontent.com/gps-cs...VERORLNgxeuAmTXr5QvGGQ=s680-w680-h510-rw
Reply With Quote
     
     
  #4494  
Old Posted Apr 2, 2026, 4:41 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
Scaffolding going up next to the 725 Granville main (?) entrance next to the Canada Line station exit. I assume they are opening it up for the new CRU entrance.
Reply With Quote
     
     
  #4495  
Old Posted Apr 2, 2026, 4:48 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
Quote:
Originally Posted by officedweller View Post
Yeah, some sort of a meeting room (but how do you access it (other than the loading dock hall)?)
I'm surprised there is no stair next to that escalator (as shown in the plan below).
Could be to prevent shoplifters escaping downstairs or just to prevent shortcutters to the mall.

The ground floor plan also tells us where the Tenant 1 demising walls will be,
inserted in blue. Bigger ground floor than Aritzia!
Tenant 1 has an elevator at the back corner (shown on Aritizia plans)
but needs escalators.
I still think that Tenant 3 (Simons?) should have an entrance from Howe St.

PS - there's active construction building the Tenant 3 No. 731 entrance corridor.

735 Granville CRU got its permit Contractor seems to be connected to Axxys Construction

Same numbered company (3469051 Canada) shows up on the new Arc'teryx Robson store. In the past they did Mackage in the mall and COS on Robson.

They've done Abercrombie & Fitch, alo, Arc'Teryx, Aritzia, Armani Exchange, Athelta, Banana Republic, Best Buy, Browns, Canada Goose etc.. so it could be any big retail player. They did a bunch of Uniqlo locations.

https://www.axxysconstruction.com/en/uniqlo

Quote:
Details



Primary Location: 735 GRANVILLE STREET, Vancouver, BC


Specific Location: Floor Level 1-2, CRU Y009


Work Description: Interior tenant improvement for the fit out of two-storey retail (mercantile) store.


Type of Work: Addition / Alteration
https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=291102431
Reply With Quote
     
     
  #4496  
Old Posted Apr 3, 2026, 1:30 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
That would be cool if it were Uniqlo.

BTW - Based on signage on the door, I think that Aritizia will consolidate its various brand stores at Pacific Centre into the new store.

Pics by me today:




Last edited by officedweller; Apr 3, 2026 at 3:03 AM.
Reply With Quote
     
     
  #4497  
Old Posted Apr 3, 2026, 3:49 PM
Capitol Hill Capitol Hill is offline
Registered User
 
Join Date: Jul 2005
Location: Capitol Hill, Seattle
Posts: 362
Has CF even applied for anything to replace the hotel, or is it just demolition and revisit in a decade operation?
__________________
Proud member of the American Association of Attention Deficit Diso...hey look, Crayons!
Reply With Quote
     
     
  #4498  
Old Posted Apr 3, 2026, 3:59 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,319
Quote:
Originally Posted by Capitol Hill View Post
Has CF even applied for anything to replace the hotel, or is it just demolition and revisit in a decade operation?
No development application has been published yet. That doesn't necessarily mean CF haven't been talking to the City about what could replace the hotel tower with. They haven't chosen to share anything yet, but they generally prefer to operate that way. We still only have Aritzia as the confirmed tenant of the former Nordstrom space, but three other future tenants have apparently been lined up, and designs submitted for at least one of their stores, without those tenants being identified.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #4499  
Old Posted Apr 3, 2026, 5:17 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,792
^^ I assume they'll need a rezoning if it's mixed use?

Some footage of the demolition work.

https://www.instagram.com/p/DVO7gt8DS_m/

https://www.instagram.com/p/DSVfiLNAjLR/

https://www.instagram.com/p/DUjuWQCkm2v/
Reply With Quote
     
     
  #4500  
Old Posted Apr 8, 2026, 3:21 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
By me today:



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 9:38 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.