Quote:
Originally Posted by officedweller
Yeah, some sort of a meeting room (but how do you access it (other than the loading dock hall)?)
I'm surprised there is no stair next to that escalator (as shown in the plan below).
Could be to prevent shoplifters escaping downstairs or just to prevent shortcutters to the mall.
The ground floor plan also tells us where the Tenant 1 demising walls will be,
inserted in blue. Bigger ground floor than Aritzia!
Tenant 1 has an elevator at the back corner (shown on Aritizia plans)
but needs escalators.
I still think that Tenant 3 (Simons?) should have an entrance from Howe St.
PS - there's active construction building the Tenant 3 No. 731 entrance corridor.

|
735 Granville CRU got its permit Contractor seems to be connected to Axxys Construction
Same numbered company (3469051 Canada) shows up on the new Arc'teryx Robson store. In the past they did Mackage in the mall and COS on Robson.
They've done Abercrombie & Fitch, alo, Arc'Teryx, Aritzia, Armani Exchange, Athelta, Banana Republic, Best Buy, Browns, Canada Goose etc.. so it could be any big retail player. They did a bunch of Uniqlo locations.
https://www.axxysconstruction.com/en/uniqlo
Quote:
Details
Primary Location: 735 GRANVILLE STREET, Vancouver, BC
Specific Location: Floor Level 1-2, CRU Y009
Work Description: Interior tenant improvement for the fit out of two-storey retail (mercantile) store.
Type of Work: Addition / Alteration
|
https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=291102431