Originally Posted by Steely Dan
^ Wait, they're starting already?????
But that only took 13 years.
Don't they know that grand old movie palace rehabs are supposed to be dragged out over 4 or 5 decades, like the Uptown Theater.
|
Speaking of theaters, any thoughts about the Avalon Regal?
One of my relatives noticed a recent update to their website.
Quote:
Renovation of the historic Avalon Regal Theater on Chicago’s South Side is underway with a planned reopening by 2026 in time for the 100th year anniversary of the building.
All donor and investor names will appear directly in front of the theater's main entrance visible from 79th Street beginning 2026.
Be part of bringing back this historic venue for current and future generations to enjoy by supporting our campaigns below!
The ART Foundation is a 501(c)(3) tax exempt organization. Please click here to view our determination letter. For larger donations, please e-mail [email protected].
Upcoming Launch
Click here to purchase tickets on Eventbrite to our 2026 March 12th Launch at Pressure Point Studios, Chicago
|
Quote:
Restoration Plan
In December 2024, the City of Chicago agreed to a phased re-opening of the Avalon Regal Theater, starting with restoration of the grand Banquet Hall. By raising investment capital from community members, we were able to stabilize the building. As a result, in 2025 the Department of Buildings agreed to dismiss the longstanding 2008 building court case that existed before the current owner.
Phase 1 of our construction is reopening the grand Banquet Hall for events and it is expected to take approximately one year. Construction during this phase includes exterior envelope repairs and plaster restoration in the Banquet Hall, as well as repairs to public toilets, building-wide mechanical, engineering, plumbing, and fire protection systems.
Phase 2 of the development includes full restoration of the remaining interior, including the auditorium, terra cotta facade/masonry, and remainder of the building. This phase is devoted primarily to facade restoration and roof replacement work and it will not affect operation of the Banquet Hall during construction.
Presently, total occupancy development costs for Phases 1 and 2 are estimated at $25 million over the next 2-3 years.
|
Quote:
Project Team
Architect of Record - O’Riley Office
Architect: Dan O'Riley, AIA, LEED AP, NCARB
oriley-office.com/#/ramova-theatre
Structural Engineering / Exterior Enclosure Consultant - Wiss, Janney, Elstner Associates, Inc.
Project Manager: Rachel Will, PE
Project Engineers: Sarah Van Domelen, PE
Project Architects: Edward Gerns, RA, Matthew Novesky, RA, Jason Aspin, RA, Nicole Declet, Amanda Marshall, and Gloria Moy, RA
wje.com
Masonry / Historic / Facade - Central Building & Preservation L.P.
Vice President and Principal: Mark Kuberski
centralbldg.com
Mechanical Engineering / Architecture - MEPIS Inc.
CEO: Santos A. Torres
mepisinc.com
Tax Credit / Energy Credit Advisory - Ryan, LLC
Director: Historic Tax Credits: Andrew Elders
Director: Government Income Tax Consulting and Green Energy Incentives: Scott Stogsdill
ryan.com/practice-areas/credits--incentives/historic-tax-credits
Property / Tax Credit Insurance - National Trust Insurance Services, LLC
Client Executive: Brendan Moag
mdpins.com/historic-properties
Transactional Modeling / Structural Advising - Baker Tilly US, LLP
Principal: Garrick Gibson
bakertilly.com
Non-Profit Counsel - Handler Law, LLP
Attorney: Andrew D. Morton
handler.law
Event Management / Business Development - Fruition Consulting
Diana McCaskill, Partner
Richard McCaskill, Partner
fruitionconsulting.com
Head of Talent
John Monopoly
https://youtu.be/Zm3GQ7hL-aA?t=2047
https://www.billboard.com/music/rb-hip-h...oly-world-tour-ye-live-dates-1235629717/
Current Projects
Exterior Envelope
Repair (masonry/roofing) associated with reopening the Banquet Hall
Temporary stabilization at other portions of the theater building
Architectural design, mechanical, electrical, and plumbing
Construction planning
Consulting
Building management
Timeline
Campaign Launch: February 2025
Construction Begins: 2026
Reopening: 2027
Funding
Project funding is being sourced through historic restoration grants, private foundations, private equity, and government historic tax credits and grants.
Avalon Regal Theater is now accepting Rental Requests for late 2026.
Complete the form for more information
|
|
|
|