HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 14, 2026, 11:40 PM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,282
Is the speed limit for the new bridge going to be the same as the old one or is it just because it's still a construction zone?

Also, there's still the same chokepoints on the bridge approaches. McBride is still only one lane to the bridge, 2 lanes merging down to 1.King George and Scott Road both lose one lane. Essentially 4 lanes merging down to 2.

At least the trucks won't take up both lanes as before. The bridge should flow fine but I still see there being the usual traffic back ups on the bridge approaches in the morning and afternoon commutes.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:22 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.