  #301  
Old Posted Feb 8, 2026, 3:41 AM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
Video Link


watching the video it looks like they have already installed 50+ guideway spans ... I believe the total is around 500 for the project so roughly 10 percent done.
does anyone have an update on the gantry that was out of service last month? is it still not working?

Last edited by surrey; Feb 8, 2026 at 5:32 AM.
Reply With Quote
     
     
  #302  
Old Posted Feb 9, 2026, 7:52 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 515
On their Facebook page someone asked and they replied saying that thy are still waiting on a part. That was on Friday when I read that.
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #303  
Old Posted Feb 11, 2026, 2:06 AM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
the clayton clipper is still down....this will certainly delay the project...

"our contractor is currently sourcing and manufacturing some necessary replacement parts for the Clayton Clipper. They're working to get it back up and running. In the meantime, the other three gantries are operating as normal."
Reply With Quote
     
     
  #304  
Old Posted Feb 12, 2026, 6:31 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,235
Quote:
Originally Posted by twoNeurons View Post
Yes! Someone speakin' my language!
For comparison,
  • Seattle's "1 Line" LRT also is a bit faster than SkyTrain (Expo or Mill) [b]@45.5km/h), but has station spacing on average of 2.75km.
  • REM (by my calculation) is 48.6km/h with 2.3km spacing
  • EXPO is 43.5km/h (by my calculation) as it's 29km of track in 40 minutes.

According to the Surrey Extension site, Surrey to Langley will add 22 minutes over 16km of track... which won't change that average speed.

I honestly think they're being conservative with the Surrey Skytrain line, probably a case of underpromise, overdeliver. It would be amazing if they could advertise Langley to Waterfront in 59 minutes but that would need an average speed of 50km/h from Surrey to Langley which I think is pushing it.

Speaking of speed, I distinctly remember the Expo line being under 40 minutes. I seem to recall schedules saying it was 39 or 38 minutes. Am I imagining things? Or perhaps this is to account for increased capacity (doors opening longer) or building slack into the schedule?
I echo your hope that this project will under-promise and over-deliver, that would be a nice change of pace for Canadian transit projects. Although, I think we've seen Vancouver do that before with the Canada Line (in terms of ridership and usefulness of the line, however with some critiques), and quite frankly the legacy Expo Line still seeing expansions and improvements shows that it also "over-delivered" in time.

In terms of Expo line speed, there were sections near Science World and through New West where the trains have been slowed down due to noise concerns. That's probably those extra couple minutes you're thinking of.
Reply With Quote
     
     
  #305  
Old Posted Feb 15, 2026, 11:15 PM
mike_ mike_ is offline
Registered User
 
Join Date: Aug 2025
Location: Surrey/Hillcrest
Posts: 14
Quote:
Originally Posted by surrey View Post
the clayton clipper is still down....this will certainly delay the project...
It looks like the Clayton Clipper may be back in operation next week. I drove by a couple of hours ago and saw that the two failed lifting jacks have been replaced. The third cross-support is back up on the guideway, but it’s currently sitting parallel to the alignment rather than installed perpendicular.

EDIT: it has also lifted the first segment of its 3rd span!

Last edited by mike_; Feb 16, 2026 at 5:36 AM.
Reply With Quote
     
     
  #306  
Old Posted Feb 15, 2026, 11:25 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Feb 4 drive

Video Link


December drone footage

Video Link


Timelapse of a guideway section being installed (152nd?)

Video Link
Reply With Quote
     
     
  #307  
Old Posted Feb 17, 2026, 1:43 AM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
Reply With Quote
     
     
  #308  
Old Posted Feb 19, 2026, 2:45 AM
adrianroam95 adrianroam95 is offline
Registered User
 
Join Date: Aug 2010
Location: Coquitlam, BC
Posts: 214
Clayton Clipper

Clayton Clipper is back in action , it has lifted all segments of its third span (the first two were completed before the collapse in Dec 2025)
Reply With Quote
     
     
  #309  
Old Posted Feb 19, 2026, 3:38 AM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
Video Link

yes the clayton clipper is back in action. the guideways are starting to go up fast....especially the langley launcher section.
Reply With Quote
     
     
  #310  
Old Posted Feb 20, 2026, 3:06 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Feb 15

Video Link
Reply With Quote
     
     
  #311  
Old Posted Feb 20, 2026, 3:47 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Quote:
Originally Posted by jollyburger View Post
Feb 15
Those strange cross heads for the siding in Green Timbers Park are at the 20:10 mark:


https://youtu.be/L3XB0iSYMG4?si=OnmhLmonHle9IjrR&t=1210
Reply With Quote
     
     
  #313  
Old Posted Feb 26, 2026, 2:22 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
.. and pics from twitter:


Here’s the Fleetwood Flyer launching gantry building the elevated guideway west of 164 St.
https://x.com/SLSkyTrain/status/2026400544915329084


Check out this view from on top of the #SurreyLangleySkyTrain elevated guideway near 152 St Station!
https://x.com/SLSkyTrain/status/2026703940549562730
Reply With Quote
     
     
  #314  
Old Posted Feb 26, 2026, 8:15 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 515
Nice view of those funky supports where the siding will be.
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #315  
Old Posted Feb 26, 2026, 9:16 PM
kikin kikin is offline
Registered User
 
Join Date: May 2025
Posts: 416
at the risk of asking a question that has already been answered in this long thread, when is the realistic first train expected to start running?

I wouldn't mind taking a trip from downtown Vancouver to Willowbrook mall for some suburban shopping experience.
Reply With Quote
     
     
  #316  
Old Posted Feb 26, 2026, 9:55 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
Quote:
Originally Posted by kikin View Post
at the risk of asking a question that has already been answered in this long thread, when is the realistic first train expected to start running?

I wouldn't mind taking a trip from downtown Vancouver to Willowbrook mall for some suburban shopping experience.
The current anticipated in-service date is late 2029.
Reply With Quote
     
     
  #317  
Old Posted Feb 27, 2026, 12:19 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by kikin View Post
at the risk of asking a question that has already been answered in this long thread, when is the realistic first train expected to start running?

I wouldn't mind taking a trip from downtown Vancouver to Willowbrook mall for some suburban shopping experience.
Literally the same stores as pacific centre
Reply With Quote
     
     
  #318  
Old Posted Feb 27, 2026, 4:08 AM
JYVR JYVR is offline
Registered User
 
Join Date: May 2024
Posts: 5
Quote:
Originally Posted by officedweller View Post
Those strange cross heads for the siding in Green Timbers Park are at the 20:10 mark:


https://youtu.be/L3XB0iSYMG4?si=OnmhLmonHle9IjrR&t=1210
There is a siding on the south side of the ML going in to help facilitate turn backs for WF-GT service (no more WF-KG service after SLS) and to make up a storage space for off peak that is lost when the KG tail tracks no longer exist once connecting to the new track is made.
Reply With Quote
     
     
  #319  
Old Posted Feb 27, 2026, 9:50 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
We know why its there, it's just a very strange lopsided design.
Elsewhere for sidings they're used bents.

We're also wondering if there will be two side by side precast guideways
(One regular height segments and the siding more squat segments or I-beams)
or oddly shaped segments carrying both tracks.
ie what shaped guideway will sit on top of them?
Reply With Quote
     
     
  #320  
Old Posted Feb 27, 2026, 10:31 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 515
Maybe they wanted to reduce interfering with Green Timbers Park, which would be required for second columns if they used bents. And maybe this is just cheaper.
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.