Already posted this on Skyrise, but here it is again:
ATIP info posted on RFC Community Discord reveals some new information about LeBreton.
I'll start with some renderings. Now these seem to match the 2022 winning bid, so I doubt any of it will end up looking like this:
And now the new information:
1. International Marine Signal Company/Beer Tunnel and train mentioned. Archeological monitoring could take place. If the tunnel and train are found, measures for the protection could be put in place.
2. A commitment to build a weather protected pedestrian connection between the arena and Pimisi Station has been made, so non-Sens developers to the east will need to build a continuation of whatever the NCC and Sens come up with. (my take is that they can start with the Pimisi lower level entrance, which could connect to a future building's basement, and from there build the corridor along the O-Train Line, through the concourse and to Bayview, with doors to access every building in between.)
3. If the NCC and Sens don't agree on Arena design, an independent architect could step to determine solutions.
I'm a bit worried the beer tunnel, if it's still there, will cause delays.