Quote:
Originally Posted by Williamoforange
Wouldn't really need to per se, alot of double tracking work can be completed without ever touching the rail or is operation, that work being road bridge work. Complete that and then it's just laying track which the ground work can be done overnight.
Also, it should be noted that the city could reduce intervals & increase capacity by simply double tracking at Walkley and that location is going to need work for HSR to be built.
|
The hardest part would be the tunnel under dows lake I think