Quote:
Originally Posted by lrt's friend
I don't believe you! Large sections have to be blasted.
Just move all the downtown bound passengers to the Transit way Who cares if the students have to take a bus again. This has always been the attitude since 2001.
I may be cynical but more often than not, I have been correct in my assessments over several years.
|
It's no longer just students who are using the line, especially as the hospital comes together and new developments are completed along the entire line.
Blasting is the simplest way to cut through bedrock, but it is not the only way. There is also a lot of work that can be done to expand capacity without needing to blast anything at all. Even in the worst case, the trench covers a very small portion of the line and would not necessitate a multi-year shutdown of the entire line.
Quote:
|
This is a good way of shutting down discussion.
|
I'm not an admin. I can't stop you from posting. But if it's this easy to shut down your discussion then I'm not sure you really have much to discuss.
Repeating the same thing over and over and over again doesn't add anything, especially if it's only based on your own "assessment".
I'm only pointing out how defeatist and unfounded the idea that a shutdown is inevitable is. By 2046 (or sooner) this line will have a critical mass of ridership that can't easily be bustituted. Extended shutdowns will be less and less politically viable. It is possible to do a lot of this work soon without extended shutdowns. We should discuss that instead of circling the drain with the same boring takes.