I noticed the McGillivray Interchange project section was updated on the MTI website. Timelines align with what's been discussed here. Construction start in 2026.

https://www.gov.mb.ca/mti/hpd/pth100/index.html
Timeline
June 2021 McGillivray Boulevard Interchange Project Announced
May 2023 Contract awarded to WSP Canada Inc. for Owner's Engineer Work
December 2023 Complete Interim Phase – Phase 1 – Project Preparation/Confirmation of Project Plan
February 2024 Stage 2 Engagement: Refined roadway and structure design presented and collect feedback collected
2024-2025 Procurement of Design Build Contract, from Request for Proposal Qualification (RFPQ) stage to Request for Proposal (RFP) stage
Late 2025 Award of the Design Build Contract
2026-2029 Detailed Design and Construction
Fall 2029 Traffic Availability Target Date
Summer 2030 Construction Completion

There's also a set of drawing which I'm not sure I've seen. They're from summer 2024. Nothing new really. But shows the project layout.

https://www.gov.mb.ca/mti/hpd/pth100/pdf...ned_functional_design_roadworks_plan.pdf
Should be awarded any time now.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4522  
Old Posted Nov 28, 2025, 7:13 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
Quote:
Originally Posted by Biff View Post
PCL won the bid on this project...strange though only on "Part 1" - $18,267,178.71

I am not exactly sure how they are awarding the "Part 2" or when. Strange award process on this one.
Interesting. So they'll do the southbound bridge only. For $18 simolions. Maybe the overall cost was much higher than expected. If it's $18 mil for one bridge. times 2 for both bridges. Let me check what the budget was.

D3.3 Part 1 – 2026 City Funded Works will consist of:
(a) Southbound bridge structure rehabilitation
(b) Mobilization/Demobilization (Part 1)

D3.4 Part 2 – 2027 City Funded Works will consist of:
(a) Northbound Bridge Structure Rehabilitation works
(b) Overhead Sign Structure
(c) Southbound Lagimodiere Rehabilitation and Widening (Grassie to southerly construction limit)
(d) Southbound Exit and Entrance Ramps Rehabilitation
(e) Northbound Lagimodiere Rehabilitation (southerly construction limit to approximately 20+800 and from approximately station 22+000 to northerly construction limit)
(f) Northbound Lagimodiere Rehabilitation and Widening (from approximately station 20+800 to approximately station 22+000)
(g) Northbound Exit and Entrance Ramps
(h) Lagimodiere Active Transportation Path Construction (Reenders to Ravelston West)
(i) Concordia Active Transportation Path Construction (Molson to Peguis)
(j) Concordia Rehabilitation and Urbanization (various sections)
(k) Mobilization/Demobilization (Part 2)
Reply With Quote
     
     
  #4523  
Old Posted Nov 28, 2025, 7:17 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,934
It was always going to be a two year project split by N and S lanes.

If I remember the budget was between $40 and $50m so it seems to fall within those parameters.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4524  
Old Posted Nov 28, 2025, 7:18 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
The pricing. I thought budget was around $40 million. PCL bid was $40.5 million. I wonder what the hold up is. Maybe they'll award it when the City budget is approved.

Quote:
Originally Posted by Biff View Post
It was always going to be a two year project split by N and S lanes.

If I remember the budget was between $40 and $50m so it seems to fall within those parameters.
Ya its' weird because all the roadwork is 2027 works. So they'll rehab the bridge and not the roads or anything. Also the cost just seems off. Maybe the southbound bridge needs more work than the northbound.
Reply With Quote
     
     
  #4525  
Old Posted Nov 30, 2025, 10:57 AM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 445
Quote:
Originally Posted by Biff View Post
Should be awarded any time now.

4 years for a simple diamond in a farmers field with “no” rail over pass seems a bit excessive? The st Mary’s overpass took half that time maybe 2 years with a lot more expropriation and clearing.


The st Anne’s interchange better get rolling soon I can’t imagine waiting 5 plus years for that to be constructed. It’s a nightmare from pembina to st Anne’s currently with all the clueless left lane hogs that refuse to move over in peak rush hour. when you glad your brights or honk they think you are doing something wrong! As there are 20 plus cars behind just as p***d off.

The province needs to put those slower traffic keep right signs in many locations that should have them, but don’t.
Reply With Quote
     
     
  #4526  
Old Posted Nov 30, 2025, 4:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
Mcgillivray definelty has a lot of property acquisition. They're working through that now from what I hear in the news. But ya the 4+ years timeline does seem a bit long I'd agree.

I'd bet St Anne's will take a bit to get rolling based on the Mcgillivray sched. One after the other is my expectation there. Like ive said before, really hoping now that Mcgillivray is moving the north perimeter program will get going on an offset schedule. Ie interchnage construction start at say pipeline in 2028.dare to dream.
Reply With Quote
     
     
  #4527  
Old Posted Dec 1, 2025, 5:00 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 610
https://imgur.com/a/uicxAVx

It would be great if the province could build a SE Rail Bypass for CP and CN/CEMR to avoid having to build a rail overpass North of McGillvary. Also too, it would link to the CP Glenboro Sub which already has a bridge over the Assiniboine, which makes kinda saves the cost already.
Reply With Quote
     
     
  #4528  
Old Posted Dec 1, 2025, 8:29 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,071
Quote:
Originally Posted by Carboy15 View Post
https://imgur.com/a/uicxAVx

It would be great if the province could build a SE Rail Bypass for CP and CN/CEMR to avoid having to build a rail overpass North of McGillvary. Also too, it would link to the CP Glenboro Sub which already has a bridge over the Assiniboine, which makes kinda saves the cost already.
WSP said they explored that option when designing the South Perimeter and it wasn't financially worthwhile.

I think they even looked at rerouting the rail line to the future Wyper Road interchange that'll be needed once that quadrant of the city starts filling in more.

Maybe the cost/benefit will tilt in favour of rerouting the rail line in the future. I'm not upset the rail line isn't getting addressed with the McGillivray interchange, it's so infrequently used and when there are trains there, they're typically short.
Reply With Quote
     
     
  #4529  
Old Posted Dec 1, 2025, 9:15 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
If the rail relocation study ever gains momentum, they'll look at something like that as a bypass right from east to west.
Reply With Quote
     
     
  #4530  
Old Posted Dec 1, 2025, 10:33 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,755
Quote:
Originally Posted by bomberjet View Post
If the rail relocation study ever gains momentum, they'll look at something like that as a bypass right from east to west.
that's a very optimistic 'if' lol
Reply With Quote
     
     
  #4531  
Old Posted Dec 2, 2025, 10:43 PM
Flatland Metropolis's Avatar
Flatland Metropolis Flatland Metropolis is offline
Registered User
 
Join Date: Oct 2013
Location: East Kildonan, Winnipeg
Posts: 308
Quote:
Originally Posted by bomberjet View Post
Mcgillivray definelty has a lot of property acquisition. They're working through that now from what I hear in the news. But ya the 4+ years timeline does seem a bit long I'd agree.

I'd bet St Anne's will take a bit to get rolling based on the Mcgillivray sched. One after the other is my expectation there. Like ive said before, really hoping now that Mcgillivray is moving the north perimeter program will get going on an offset schedule. Ie interchnage construction start at say pipeline in 2028.dare to dream.
Currently 19 properties in the expropriation phase for PTH 3 and PTH 100, offers have begun to made to these property owners until all property is acquired. Once that is completed they can move forward with construction phases.

Last edited by Flatland Metropolis; Dec 2, 2025 at 10:43 PM. Reason: Noted that the 19 properties relate to the PTH 3 interchange.
Reply With Quote
     
     
  #4532  
Old Posted Dec 3, 2025, 2:33 AM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 946
Quote:
Originally Posted by Flatland Metropolis View Post
Currently 19 properties in the expropriation phase for PTH 3 and PTH 100, offers have begun to made to these property owners until all property is acquired. Once that is completed they can move forward with construction phases.
Project is starting in March regardless, but probably not on unacquired properties, lol. Preferred Proponent was officially notified on the 21st. The numbers were crazy on this job. Crazier than on the St. Mary's overpass. But I heard that the low bidder was on budget. I wonder if the expropriations could slow the schedule down. I hope not.
Reply With Quote
     
     
  #4533  
Old Posted Dec 3, 2025, 3:19 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
Graham Construction was awarded the project.
Reply With Quote
     
     
  #4534  
Old Posted Dec 3, 2025, 3:49 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,934
RFP for Detailed Design on the twinning of McGillivray inside the Perimeter to essentially Costco is currently out.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4535  
Old Posted Dec 3, 2025, 7:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
On Merx? Cant find it.

I was thinking about this in relation to the interchange. Will they build the second bridge structure for the twinning? The drawings below show the all the twinning as future. But now it's all coming together at a similar timeframe.

https://www.gov.mb.ca/mti/hpd/pth100/pdf...ned_functional_design_roadworks_plan.pdf

Or they just tie the twinning into the lanes at the proposed bridge and call it a day.
Reply With Quote
     
     
  #4536  
Old Posted Dec 3, 2025, 8:26 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,934
It is in the Private section of Merx. Because it is to Pre-Qualified Consultants MTI does not consider it an open project.

Either way it closes Jan 9, 2026.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4537  
Old Posted Dec 3, 2025, 8:45 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 907
Hopefully the city shells out to twin the remaining 500 metre stretch inside city limits by Fort Whyte and the church at the same time so we don't end up with a weird orphaned two lane piece.
Reply With Quote
     
     
  #4538  
Old Posted Dec 3, 2025, 8:54 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
Forgot about that part. The MTI plans just tapers back to 2 lanes prior to city limits. One could assume the City would pony a few million up to do that.
Reply With Quote
     
     
  #4539  
Old Posted Dec 3, 2025, 9:03 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 907
Here's hoping. Though I recall there being similar two lane stretches for a while on McPhillips and south Lag for years after the province twinned outside city limits.
Reply With Quote
     
     
  #4540  
Old Posted Dec 3, 2025, 9:21 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
The new Buffalo Crossing vehicle loop is directly in the path of where the new lanes would go. They could probably squeeze the lanes through with a narrow median. Not so good on the planning front here. There's also zero room for service roads through this zone.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.