HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #4881  
Old Posted Nov 19, 2025, 1:00 AM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,843
Quote:
Originally Posted by bomberjet View Post
Lumber pile. Key info for fire insurance map! Those old maps are awesome.
When you look at these maps, its interesting to see what businesses were in the city that are no longer in existence.

A lot of the environmental assessment reports refer to these maps to try and determine what previous land uses were in the area to see if any potential land contamination may be from somebody else in the past.
Reply With Quote
     
     
  #4882  
Old Posted Nov 19, 2025, 1:38 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,450
36 Roslyn Road

36 Roslyn Road
Location: 36 Roslyn Road
Developer: 6571574 MANITOBA LTD.
Architect: Verne Reimer Architecture
Status: In development
Documents: Rezoning & Variance – November 24, 2025
Media:
Description: A new eight-storey apartment building with 72 units is proposed for the vacant lot at the southwest corner of Roslyn Road and Bryce Street in Winnipeg’s Osborne Village. The modern building will feature Tyndall stone and brick on the outside, a rooftop patio, and a welcoming main entrance at the corner with big floor-to-ceiling windows facing both streets. It will sit right at the sidewalk with no front or corner setbacks (except a small 2-foot step-back on part of Bryce Street), 5 feet from the neighbouring property on the west side, and tight to the back lane.The project includes 21 vehicle parking spaces (six of them accessible) in covered parking on the ground floor, plus a generous 52 secure indoor bike parking spots and a garbage enclosure at the rear southwest corner. While no trees are planned, the landscaping will include 44 shrubs. The development is designed to fit the high-density residential vision for Osborne Village and the city’s “Complete Communities” guidelines for mature neighbourhoods.






__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #4883  
Old Posted Nov 20, 2025, 4:03 PM
reallycoolguy reallycoolguy is offline
Registered User
 
Join Date: May 2024
Posts: 54
I think that'll add some great density to that corner. Would have loved to see a little CRU for a bodega-style shop or something but circle K and safeway are close enough I guess. My condo board is pushing us to oppose this building because the lack of front yard and parking spaces lol.
Reply With Quote
     
     
  #4884  
Old Posted Nov 20, 2025, 4:53 PM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,579
Quote:
Originally Posted by reallycoolguy View Post
I think that'll add some great density to that corner. Would have loved to see a little CRU for a bodega-style shop or something but circle K and safeway are close enough I guess. My condo board is pushing us to oppose this building because the lack of front yard and parking spaces lol.
Complaints about parking are expected, but a lack of a front yard? Like how does that even matter in a dense urban neighbourhood. The Rossmore is only a few buildings over that it hasn't had a front yard for the past 100 years.
__________________
"Build baby build."
Reply With Quote
     
     
  #4885  
Old Posted Nov 20, 2025, 5:08 PM
peg's Avatar
peg peg is offline
keep the good times going
 
Join Date: Jun 2017
Location: Downtown Winnipeg
Posts: 622
Is it pulse? I remember hearing that the condo board there did not want to see 350 River proceed.
Reply With Quote
     
     
  #4886  
Old Posted Nov 20, 2025, 5:52 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,933
If it was Pulse that would seem ironic in that Verne Reimer is the architect behind the proposed building and also designed Pulse as well as have their offices on the main floor of the Pulse.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4887  
Old Posted Nov 21, 2025, 1:26 AM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,579
Quote:
Originally Posted by peg View Post
Is it pulse? I remember hearing that the condo board there did not want to see 350 River proceed.
I would imagine it's 71 Roslyn Rd across the street.
__________________
"Build baby build."
Reply With Quote
     
     
  #4888  
Old Posted Nov 21, 2025, 5:35 AM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,076
Pulse was designed by Prairie.
Reply With Quote
     
     
  #4889  
Old Posted Nov 21, 2025, 1:59 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,933
...Ah, yes, right you are. Memory gets foggy as I age.


I broke my own rule that I try to verify something I post online before I post it.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4890  
Old Posted Nov 21, 2025, 10:21 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,076
^ its a fun fact that it was actually designed by Peter Sampson now of Public City fame....in his brief stint at Prairie.

It's still one of my favourite multi-family building in the city.
Reply With Quote
     
     
  #4891  
Old Posted Nov 26, 2025, 5:19 PM
bussche bussche is offline
Registered User
 
Join Date: May 2019
Posts: 160
Quote:
Originally Posted by Wpg_Guy View Post
269 River Ave.
Location: 269 River Ave.
Developers: Brokenhead Ojibway Nation Development Corp. | Freedhome Developments Ltd.
Architect: Cibinel Architecture Ltd
Status: In Development
Documents: Variance:25-151482/C-May 5, 2025 | Zoning Agreement Amendment–June 24, 2025
Media: Brokenhead to build apartment block in Osborne area-Winnipeg Sun
Description: The subject property is located on the north side of River Avenue, in the River-Osborne neighbourhood of the Fort Rouge - East Fort Garry ward. The proponent is building a 147-unit apartment with 60 units rented at affordable rates, with priority given to members of Brokenhead Ojibway First Nation and other First Nations community members. The new building will be seven (7) storeys in height and have an L-shaped building configuration, This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits:
Piling has begun.

Reply With Quote
     
     
  #4892  
Old Posted Nov 26, 2025, 5:41 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,357
🞵🞵🞵 is that?! ice??!!
Reply With Quote
     
     
  #4893  
Old Posted Nov 26, 2025, 6:45 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,933
It is winter time.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4894  
Old Posted Nov 26, 2025, 6:53 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,378
Quote:
Originally Posted by Biff View Post
It is winter time.
Big if true
Reply With Quote
     
     
  #4895  
Old Posted Nov 26, 2025, 11:43 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,357
Reply With Quote
     
     
  #4896  
Old Posted Nov 27, 2025, 6:37 PM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,579
Quote:
Originally Posted by Wpg_Guy View Post
Upcoming variances at City Centre on November 24 for 36 Roslyn Road.

For variances to allow for the establishment of a "RMF-L" zoning lot, the construction of a multi-family building, and the establishment of an accessory parking area.
It looks like this project was approved but with a couple major conditions. First, the required Lot Area Per Dwelling was increased from 125 sq ft to 200 sq ft (which I believe will mean fewer residential units) as well as increasing the number of required parking stalls from 21 to 43. Not sure how this will effect the project going forward.

https://clkapps.winnipeg.ca/DMIS/ViewDoc.asp?DocId=27310&SectionId=&InitUrl=
__________________
"Build baby build."
Reply With Quote
     
     
  #4897  
Old Posted Nov 27, 2025, 6:51 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,754
Quote:
Originally Posted by ColdRain&Snow View Post
It looks like this project was approved but with a couple major conditions. First, the required Lot Area Per Dwelling was increased from 125 sq ft to 200 sq ft (which I believe will mean fewer residential units) as well as increasing the number of required parking stalls from 21 to 43. Not sure how this will effect the project going forward.

https://clkapps.winnipeg.ca/DMIS/ViewDoc.asp?DocId=27310&SectionId=&InitUrl=

Wait it's 25 units and they're requiring FORTY THREE 🞵🞵🞵🞵🞵🞵🞵 parking stalls? 1.72/unit?!

Look forward to the project being value engineered to replace the Tyndall with Hardie board so they can afford to focus on the priority of ensuring as much space as possible is taken up by parking

Last edited by borkborkbork; Nov 27, 2025 at 7:14 PM. Reason: i'm an idiot and can't read
Reply With Quote
     
     
  #4898  
Old Posted Nov 27, 2025, 7:08 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,933
The project is 72 units
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #4899  
Old Posted Nov 27, 2025, 7:38 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,076
how in the hell are they supposed to add 23 more parking stalls?!

I will never understand why we care about density calculations. If it fits within the box, why does it matter how many homes there are?
Reply With Quote
     
     
  #4900  
Old Posted Nov 27, 2025, 9:11 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,754
Quote:
Originally Posted by trueviking View Post
how in the hell are they supposed to add 23 more parking stalls?!

I will never understand why we care about density calculations. If it fits within the box, why does it matter how many homes there are?
Like at the end of the day, if they can rent these units out without parking spaces, who gives a 🞵🞵🞵🞵

If every building "needs" a certain amount of parking in order to rent units, developers will build parking.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 8:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.