  #2781  
Old Posted Aug 27, 2025, 7:17 PM
KnickKnack KnickKnack is offline
Registered User
 
Join Date: Apr 2024
Posts: 108
Quote:
Originally Posted by Biff View Post
Why isn't that good?

5 of the ten buildings will be under construction before the snow melts. The smaller ones are the ones that are having issues making the numbers work. Lots of details have changed since Railside was announced in 2018. Covid, supply chain issues, interest rates and now tariffs, not to mention the most recent change earlier this year when The Forks notified the developers that they will no longer pursuing Geothermal for heating and cooling causing further delays.

I think it is great news that building permits are being applied for.
Well, railside was first announced in 2015. Entire high rises have been designed and built in that time. Nothing you’re saying here is wrong but at this point any further delay is just frustrating.
Reply With Quote
     
     
  #2782  
Old Posted Aug 27, 2025, 7:58 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 1,020
In true Winnipeg fashion, like when they first pondered opening Portage & Main, or a BRT line, or any project for that matter, they need to do a study, then they'll do a study on the study, and then they'll do another study on THAT study for feasibility and change in market interest. Then they'll do a study on THAT, just to double check the study prior.
Reply With Quote
     
     
  #2783  
Old Posted Aug 27, 2025, 9:00 PM
Winnipegger Winnipegger is offline
Registered User
 
Join Date: May 2007
Location: Winnipeg
Posts: 835
Honestly I think everything is just slowing down in general due to economic uncertainty, so I wouldn't expect previously announced projects to move at previously announced speeds, and I wouldn't expect much in the way of major investments over the next 2 to 3 years. Two reasons:

1. While the trade dispute with the US isn't as terrible as originally anticipated (effective tariff rate is like 5% or 6% on Canadian goods being imported into the US), it has put a chill on a lot of business investment not necessarily because the economy is tanking, but because things are so uncertain and constantly changing. For construction, this means costs are uncertain in the future, and many businesses may wish to wait for things to stabilize before moving forward.

2. Population growth in Canada will slow and maybe stop in the coming quarters, including Winnipeg. Most builders want to enjoy a high-rent, low vacancy rate environment but NPRs leaving the country and lull in permanent migration will work against those two factors.

These two things will make large investments in building construction more difficult to justify, and things will likely improve if/when Trump exits office and Canadians no longer feel immigration is an issue and normal levels of population growth can resume.

Just my $0.02.
Reply With Quote
     
     
  #2784  
Old Posted Aug 27, 2025, 9:37 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,010
CMHC is in a bit of a holding pattern as well....I expect that in the fall budget it will kickstart again.

Its a tough environment right now....after covid, both rents and construction costs went up and now rents are going back down but construction costs aren't. Interest rates are still higher than they were a few years ago....CMHC is being more cautious...its a bit of a perfect storm right now...

as said above, population growth will slow and there is a ton of rental supply coming to market in the next year or two....its a challenging moment for market developers...hopefully new or renewed programs with CMHC help kick start affordable housing.
Reply With Quote
     
     
  #2785  
Old Posted Sep 19, 2025, 6:15 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is online now
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 856
I noticed that some serious fence posts have been installed around most of the Railside parking lots. Could this mean that construction is finally happening soon?
Reply With Quote
     
     
  #2786  
Old Posted Nov 8, 2025, 6:37 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,765
Station X

Railside | Station X | Site 07
Location: Israel Asper Way
Developer: UWCRC 2.0
Architect: LM-ESP
Status: Proposed
Documents:
Description: Station X is a 7-storey, 67,275-square-foot mixed-use, mixed-income residential project at Railside spearheaded by the University of Winnipeg Community Renewal Corporation. The building delivers 73 studio to three-bedroom units blending affordable and market-rate housing, while its ground floor hosts a 56-space YMCA-YWCA child care centre—Winnipeg’s largest operator—and flexible live/work studios for small retailers and makers. Designed within a compact urban block to buffer nearby rail noise, the structure opens onto three landscaped front courtyards and crowns with a partial seventh-floor amenity level featuring a fitness room, multi-purpose lounge, and expansive terrace overlooking the Canadian Museum for Human Rights, the historic Forks site. Emphasising sustainability, community integration, and urban vitality, Station X is slated for completion in 2027.
Permits:








__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Last edited by Wpg_Guy; Jan 18, 2026 at 6:43 AM.
Reply With Quote
     
     
  #2787  
Old Posted Nov 8, 2025, 6:42 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Nice.
Reply With Quote
     
     
  #2788  
Old Posted Nov 8, 2025, 6:54 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,765
Recap of Railside as of today:
  1. Alston Properties with 1X1 Architecture
    64 Israel Asper Way, 23 Units, 2 CRU, 6L
    44 Israel Asper Way, 35 Units, 1 CRU, 6L

  2. 2 Architecture
    50 Israel Asper Way, 40 Units, 7 CRU, 6L
    68 Israel Asper Way, 06 Units, 1 CRU, 4L
    80 Israel Asper Way, 16 Units, 0 CRU, 4L

  3. GSD with ATLRG Architecture
    00 Israel Asper Way, 29 Units, 1 CRU, 6L

  4. StreetSide Developments with Prairie Architects
    32 Israel Asper Way, 45 Units, 2 CRU, 6L

  5. Vishin Developments and TradeMark Homes with ATLRG Architecture
    00 Israel Asper Way, 00 Units, 0 CRU, 4L

  6. University of Winnipeg Community Renewal Corporation 2.0 with LM Architectural Group
    00 Israel Asper Way, 73 Units, 1 CRU, 7L

  7. FNP with Number Ten
    72 Israel Asper Way, 91 Units, 4 CRU, 6L

    Total: 358 Units, 19 CRU, 55L
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #2789  
Old Posted Nov 8, 2025, 7:49 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is online now
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 856
Thanks for the summary! Which one (or ones?) are in for permit review?
Reply With Quote
     
     
  #2790  
Old Posted Nov 8, 2025, 9:58 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,765
Quote:
Originally Posted by Mr Tall Forehead View Post
Thanks for the summary! Which one (or ones?) are in for permit review?
Only two have had development permits issued to date.
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #2791  
Old Posted Nov 8, 2025, 10:40 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is online now
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 856
I guess what I’m curious about is which will be the first to go to construction and where is it located on the footprint?
Reply With Quote
     
     
  #2792  
Old Posted Nov 8, 2025, 10:54 PM
pegcity's Avatar
pegcity pegcity is offline
Registered User
 
Join Date: Oct 2003
Location: Winnipeg.
Posts: 460
It would be nice if The Forks North Portage Partnership would make a quick update of what is currently is happening, what the next steps are, if there’s issues, what to expect. But what do I know, barely anything.
__________________
bright.future.
Reply With Quote
     
     
  #2793  
Old Posted Nov 11, 2025, 5:27 AM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,544
Quote:
Originally Posted by Wpg_Guy View Post
Recap of Railside as of today:
  1. Alston Properties with 1X1 Architecture
    64 Israel Asper Way, 23 Units, 2 CRU, 6L
    44 Israel Asper Way, 35 Units, 1 CRU, 6L

  2. 2 Architecture
    50 Israel Asper Way, 40 Units, 7 CRU, 6L
    68 Israel Asper Way, 06 Units, 1 CRU, 4L
    80 Israel Asper Way, 16 Units, 0 CRU, 4L

  3. GSD with ATLRG Architecture
    00 Israel Asper Way, 29 Units, 1 CRU, 6L

  4. StreetSide Developments with Prairie Architects
    32 Israel Asper Way, 45 Units, 2 CRU, 6L

  5. Vishin Developments and TradeMark Homes with ATLRG Architecture
    00 Israel Asper Way, 00 Units, 0 CRU, 4L

  6. University of Winnipeg Community Renewal Corporation 2.0 with LM Architectural Group
    00 Israel Asper Way, 73 Units, 1 CRU, 7L

  7. FNP with Number Ten
    72 Israel Asper Way, 91 Units, 4 CRU, 6L

    Total: 358 Units, 19 CRU, 55L
So 9 out of the 10 buildings have been announced and the only building that hasn't been announced is the one ATLRG is doing with Vishin Developments?
__________________
"Build baby build."
Reply With Quote
     
     
  #2794  
Old Posted Nov 11, 2025, 5:42 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,765
Quote:
Originally Posted by ColdRain&Snow View Post
So 9 out of the 10 buildings have been announced and the only building that hasn't been announced is the one ATLRG is doing with Vishin Developments?
That’s correct
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #2795  
Old Posted Nov 11, 2025, 5:45 AM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,544
Quote:
Originally Posted by Wpg_Guy View Post
That’s correct
__________________
"Build baby build."
Reply With Quote
     
     
  #2796  
Old Posted Nov 11, 2025, 4:46 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,010
I like that a lot. Well done.
Reply With Quote
     
     
  #2797  
Old Posted Nov 11, 2025, 11:34 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,335
Quote:
Originally Posted by trueviking View Post
I like that a lot. Well done.
Whats that?
Reply With Quote
     
     
  #2798  
Old Posted Nov 12, 2025, 6:02 AM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,420
The delays on getting started are almost as ridiculous as Sutton Place Hotel.
Reply With Quote
     
     
  #2799  
Old Posted Nov 12, 2025, 10:28 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,765
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #2800  
Old Posted Nov 13, 2025, 2:06 AM
jim_bred jim_bred is offline
Registered User
 
Join Date: Aug 2025
Posts: 191
Some nice looking buildings.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.