Broadway closed to vehicles for four months, wow.

I was guessing a full closure would happen but didn’t image it would be for that long.
Reply With Quote
     
     
  #3202  
Old Posted Oct 24, 2025, 10:27 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,738
If it's going down to 4 lanes on station blocks are they just widening the sidewalk evenly on both sides? It'll be interesting to see how they setup detours.
Reply With Quote
     
     
  #3203  
Old Posted Oct 24, 2025, 10:30 PM
logan5's Avatar
logan5 logan5 is online now
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,175
Quote:
Originally Posted by Feathered Friend View Post
Hmm. I don't recall Broadway (at Main) being completely shut down, especially not for 4 months when they put the road deck in. Why would they have to block the entire street to uninstall? And traffic will be detoured around the block. Lol. What block, and how is that going to work? The 99 B line too? This is going to be a mess.

I take it the wider sidewalks are permanent, as per the Broadway Plan. That will be an improvement for the Lee Building, as the arcade area is quite narrow. Would also open up more opportunities for the retail spaces there. Maybe have some patio space in the arcade area. One of Mt Pleasant's nicest buildings.
Reply With Quote
     
     
  #3204  
Old Posted Oct 24, 2025, 10:42 PM
djh djh is offline
Registered User
 
Join Date: Jul 2003
Location: Vancouver
Posts: 1,977
Quote:
Originally Posted by officedweller View Post
Posted today:


This section of the Arbutus Station roof, between Cypress & Maple streets, is covered by a black waterproofing membrane that will keep the station dry.
Crews are now placing gravel & soil in the area between the station roof & the street. This process is called backfilling.

https://x.com/broadwaysubway_/status/1981454378197201011
I'm sure the engineers have thought of this, but does that roof have either a slope or a camber on it, so that rainwater dripping down onto it from the surface can runoff? Otherwise it's just an extra load on the roof and a pretty substantial one at that.

It's hard to tell from this image if the roof is level or not.
Reply With Quote
     
     
  #3205  
Old Posted Oct 24, 2025, 10:54 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by djh View Post
I'm sure the engineers have thought of this, but does that roof have either a slope or a camber on it, so that rainwater dripping down onto it from the surface can runoff? Otherwise it's just an extra load on the roof and a pretty substantial one at that.

It's hard to tell from this image if the roof is level or not.
I doubt it would affect the drainage much to have any slope to the underground station roof. Not sure what's happening with those side walls if those are temporary or not.
Reply With Quote
     
     
  #3206  
Old Posted Oct 24, 2025, 11:10 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,235
Quote:
Originally Posted by jollyburger View Post
If it's going down to 4 lanes on station blocks are they just widening the sidewalk evenly on both sides? It'll be interesting to see how they setup detours.
Was there ever drawings of the streetscapes at the stations released?
Reply With Quote
     
     
  #3207  
Old Posted Oct 24, 2025, 11:15 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,196
Buses will take E 8th, a temporary signal will be installed at Main & 8th.

Quote:
Originally Posted by logan5 View Post
Hmm. I don't recall Broadway (at Main) being completely shut down, especially not for 4 months when they put the road deck in. Why would they have to block the entire street to uninstall?
The Province says it would take 16 months while maintaing traffic vs 8 months with the 4 month closure.


Quote:
Originally Posted by mcj View Post
Was there ever drawings of the streetscapes at the stations released?
General renders:
https://syc.vancouver.ca/projects/broadw...plan-public-realm-phase-2-infoboards.pdf
https://www.shapeyourcity.ca/broadway-public-realm

Dailyhive included this diagram from the Province for Broadway at Main:

Image from Government of BC

Last edited by madog222; Oct 24, 2025 at 11:52 PM.
Reply With Quote
     
     
  #3208  
Old Posted Oct 25, 2025, 2:18 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by madog222 View Post
Broadway closed to vehicles for four months, wow.
Yeah, that's going to be pretty brutal. I wonder if it will be repeated for the other stations on Broadway. Would it make sense to do them all at the same time? Might be staffing and/or equipment issues trying to do it all at once, mind you.

I'm also wondering about transit rerouting.
Reply With Quote
     
     
  #3209  
Old Posted Oct 25, 2025, 3:34 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,196
Quote:
Originally Posted by aberdeen5698 View Post
Yeah, that's going to be pretty brutal. I wonder if it will be repeated for the other stations on Broadway. Would it make sense to do them all at the same time? Might be staffing and/or equipment issues trying to do it all at once, mind you.

I'm also wondering about transit rerouting.
Quote:
Precise plans are still being developed for the removal of the traffic decks at the remaining four station sites, with the goal of minimizing both disruptions and the overall construction timeline. The provincial government has not ruled out the possibility of similarly prolonged full closures of select blocks directly above Broadway–City Hall Station, Oak–VG Station, South Granville Station, and Arbutus Station to facilitate deck removal and street restoration.

“We want to take the same approach with each of those different stations. And in each case, we’ll assess the best way to do that in terms of the routing around each of those particular bridge decks around those stations. But the key will be to minimize the closure time,” continued [Mike] Farnworth.
https://dailyhive.com/vancouver/broadway-subway-traffic-deck-road-closure-disruptions


Image from Government of BC
Reply With Quote
     
     
  #3210  
Old Posted Oct 26, 2025, 2:27 AM
Conrad Yablonski's Avatar
Conrad Yablonski Conrad Yablonski is offline
Registered User
 
Join Date: Dec 2009
Posts: 700
Quote:
''Sidewalk and businesses to remain Open''


IOW they are screwed as bad as ever.
Reply With Quote
     
     
  #3211  
Old Posted Oct 26, 2025, 6:04 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Thanks for the additional info!
Reply With Quote
     
     
  #3212  
Old Posted Oct 27, 2025, 5:09 PM
idunno idunno is online now
Registered User
 
Join Date: Feb 2010
Posts: 950
Pretty exciting that Main/Broadway will be at its ultimate buildout by the summer!
Reply With Quote
     
     
  #3213  
Old Posted Oct 27, 2025, 10:16 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,196
Backfilling at Cambie Station between Alberta and Yukon is starting “as early as” tomorrow.
Reply With Quote
     
     
  #3214  
Old Posted Oct 31, 2025, 5:36 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,748
Latest project update (October 2025 despite the title saying June 2025):

https://app.webtrackz.com/?q=email/view/14U6K4yY9lOgsO0T9RrdVKbrsykn0dGUEYKmlHFEaMlPwS0nczUPsg6w


The above-ground station entrance at Mount Pleasant Station, including newly installed escalators. Photo taken July 2025.
https://app.webtrackz.com/?q=email/view/14U6K4yY9lOgsO0T9RrdVKbrsykn0dGUEYKmlHFEaMlPwS0nczUPsg6w


The passenger connection between the future Millennium Line platform and the Canada Line southbound platform at Broadway-City Hall. Photo taken August 2025.
https://app.webtrackz.com/?q=email/view/14U6K4yY9lOgsO0T9RrdVKbrsykn0dGUEYKmlHFEaMlPwS0nczUPsg6w
Reply With Quote
     
     
  #3215  
Old Posted Oct 31, 2025, 8:36 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 514
From the link in the previous post:

Quote:
Extending the Canada Line platform at Broadway-City Hall Station
Didn't realise they'd be doing that as part of the BSP.
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #3216  
Old Posted Oct 31, 2025, 4:30 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by Vantage View Post
From the link in the previous post:



Didn't realise they'd be doing that as part of the BSP.
Seems like part of it is for connections to the elevator





https://www.broadwaysubway.ca/about/stations/broadway-city-hall/
Reply With Quote
     
     
  #3217  
Old Posted Oct 31, 2025, 5:12 PM
RedArbutus RedArbutus is offline
Registered User
 
Join Date: Feb 2024
Location: North Vancouver
Posts: 460
Quote:
Originally Posted by Vantage View Post
From the link in the previous post:



Didn't realise they'd be doing that as part of the BSP.
Yeah on the northbound platform they've had some minor caution tape/tarping up with signs talking about the platform expansion being imminent for some time now. At least a few months.
Reply With Quote
     
     
  #3218  
Old Posted Oct 31, 2025, 5:18 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,714
Quote:
Originally Posted by officedweller View Post

The passenger connection between the future Millennium Line platform and the Canada Line southbound platform at Broadway-City Hall. Photo taken August 2025.
https://app.webtrackz.com/?q=email/view/14U6K4yY9lOgsO0T9RrdVKbrsykn0dGUEYKmlHFEaMlPwS0nczUPsg6w
Now that's interesting. I hope they keep the circular cross-section and don't square it off with drywall.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #3219  
Old Posted Oct 31, 2025, 6:38 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by SFUVancouver View Post
Now that's interesting. I hope they keep the circular cross-section and don't square it off with drywall.
I wouldn't get my hopes up. Look at the opening it's perfectly squared off with what looks like mechanical running through the ceiling.
Reply With Quote
     
     
  #3220  
Old Posted Oct 31, 2025, 7:11 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,748
I was hoping for the tube to remain too!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:16 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.