Quote:
Originally Posted by bomberjet
They can add to the plan if they want. But id bet if anything did come along for 101, its been beyond the 5 year plan anyways.
It does talk about the Perimeter freeway winnipeg 1 million thing in the plan. Which is 101.
|
After McGillivray and St Anne's/CPR Emerson, there are probably 12 key projects that need to happen to make the Perimeter passable safety-wise, and that's still a long way off from it being a freeway. Clockwise from south:
1. Kenaston/Waverley interchange
2. 330 interchange
3. Wilkes ramp reconfiguration
4. Portage cloverleaf reconfiguration
5. Rosser Rd. ramp reconfiguration
6. PTH 6 interchange
7. Pipeline Interchange
8. Red River Crossing lane addition, C/D lanes, Main St Interchange reconfiguration (all 1 project most likely)
9. Wenzel road interchange
10. Gunn Rd. interchange
11. Dugald interchange and Rail line overpass combo
12. Pembina interchange reconfiguration
At 1 major project every ~4 years like they're showing with St Mary's, McGillivray, and St Anne's , we're looking at nearly 50 years before the major safety issues with
current traffic numbers are addressed. Nevermind new ones that might come up with further growth in the CMA. Well past the point where the CMA and Winnipeg proper will have both surpassed 1 million residents.