HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #1641  
Old Posted Sep 23, 2025, 6:17 PM
pspeid's Avatar
pspeid pspeid is online now
Registered User
 
Join Date: Aug 2018
Posts: 2,568
Quote:
Originally Posted by bomberjet View Post
The chocolate lady is now suing for the costs to deal with snow load on her building! Lmao what a disgrace. The CBC are article makes no mention of her denying access or her not cooperating st all with the developer/City.

https://www.cbc.ca/news/canada/manitoba/constance-popp-snow-roof-appeal-1.7640709
I noticed that as well. The article gives the impression that this is a new "David and Goliath" issue. I wish someone would teach these writers to do a little background research before they produce their articles.
__________________
"Opinion is really the lowest form of intelligence"-Bill Bullard

"Naysayers are always predicting the present"-Anon.

"Rudeness is the weak man's imitation of strength"-Eric Hoffer
Reply With Quote
     
     
  #1642  
Old Posted Sep 23, 2025, 6:19 PM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,501
Quote:
Originally Posted by bomberjet View Post
The chocolate lady is now suing for the costs to deal with snow load on her building! Lmao what a disgrace. The CBC are article makes no mention of her denying access or her not cooperating st all with the developer/City.

https://www.cbc.ca/news/canada/manitoba/constance-popp-snow-roof-appeal-1.7640709
Wow what a biased article, that's ridiculous. I hate how anti-developer CBC is sometimes.
__________________
"Build baby build."
Reply With Quote
     
     
  #1643  
Old Posted Sep 23, 2025, 7:03 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 944
CBC has always been very good at rage baiting. This is a perfect example.
Reply With Quote
     
     
  #1644  
Old Posted Sep 23, 2025, 7:09 PM
drew's Avatar
drew drew is offline
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,848
Quote:
Originally Posted by pspeid View Post
I noticed that as well. The article gives the impression that this is a new "David and Goliath" issue. I wish someone would teach these writers to do a little background research before they produce their articles.
Maybe she waited to do this once it's before the courts, and the developer is probably instructed not to comment by their legal council.
Reply With Quote
     
     
  #1645  
Old Posted Sep 23, 2025, 8:00 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,757
so if i understand she was trying to stop the development citing the snow blow blow off anymore, but she lost and the developer was allowed to build. now karma has bit her in the ass and the City says "hey you need to upgrade your roof".
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
Reply With Quote
     
     
  #1646  
Old Posted Sep 23, 2025, 8:39 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 944
For a while, she was impeding access to the roof as well, to make matters worse. She probably already knew that her roof needed upgrades. She just doesn't want to be the one to pay for them. (I don't recall if this was already mentioned earlier in the thread)
Reply With Quote
     
     
  #1647  
Old Posted Sep 23, 2025, 9:54 PM
1ajs's Avatar
1ajs 1ajs is online now
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,513
Quote:
Originally Posted by neutroniks View Post
For a while, she was impeding access to the roof as well, to make matters worse. She probably already knew that her roof needed upgrades. She just doesn't want to be the one to pay for them. (I don't recall if this was already mentioned earlier in the thread)
whats crazy is if she allowed access she woulda had most of the cost coverd. but its prolly a fight over loosing that parking lot

hopefully the developer has documentation to back up the many atemps to remidy and the road blocks she created
Reply With Quote
     
     
  #1648  
Old Posted Sep 23, 2025, 10:36 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,793
There is an interesting Reddit thread on this project

https://www.reddit.com/r/Winnipeg/commen...ce_chocolate_shop_owner_on_the_hook_for/
Reply With Quote
     
     
  #1649  
Old Posted Sep 25, 2025, 4:28 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,175
The developer would have paid for the costs and done the work as part of the approvals for their project. But she played hardball and lost.
Reply With Quote
     
     
  #1650  
Old Posted Sep 25, 2025, 4:43 PM
optimusREIM's Avatar
optimusREIM optimusREIM is online now
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,230
^ talk about shooting yourself in the foot. I get ego is real and plays a role, but man you’d think that one of her lawyers would’ve cautioned her not to play that game.
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
Reply With Quote
     
     
  #1651  
Old Posted Sep 25, 2025, 7:13 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,175
The full history is in the Clerks appeals page, maybe. Somewhere on the clerks page. And numerous times she denied entry, etc, etc.
Reply With Quote
     
     
  #1652  
Old Posted Sep 25, 2025, 8:24 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 689
Reply With Quote
     
     
  #1653  
Old Posted Sep 29, 2025, 2:08 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,175
I noticed the no condos guy on Tache will in fact be getting new neighbours. Albeit not condos but affordable housing. I'm sure they're thrilled! lol

http://clkapps.winnipeg.ca/DMIS/permalink.asp?id=A20251001(RM)RC-26
Reply With Quote
     
     
  #1654  
Old Posted Oct 22, 2025, 5:56 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,338
Quote:
Raising the roof in St. Boniface
Government representatives join Opaskwayak Cree Nation in celebrating progress of mixed-use housing complex
Aaron Epp

Posted: Friday, Oct. 17, 2025

It’s a long way to the top if you wanna rock ‘n’ roll, but if you want to build a six-storey housing development in St. Boniface, getting to the top takes about 11 months.

Opaskwayak Cree Nation and Freedhome Developments Ltd. celebrated on Friday the topping-off ceremony of a new building at 366 Marion St. Once complete, La Cour — French for “the Court” — will offer 127 housing units, including 52 labelled “deeply affordable.”

Construction began in November and is expected to be completed in September 2026. Builders recently started putting the roof on, which inspired Friday’s celebration. OCN community members and leaders, as well as representatives from all levels of government, attended.



The mixed-use development will include ground-level townhomes, a lobby lounge with co-working space, streetfront commercial space and heated parkade. It is wholly owned by OCN, a Manitoba First Nation located near The Pas. It’s being touted as an example of Indigenous-led economic sovereignty and a step forward on the path of reconciliation.

The Winnipeg development will foster long-term economic growth, create generational wealth and strengthen community ties, according to OCN Chief Michael Constant.

“Our people are entering into the main society, (leaving) our First Nations and surviving and thriving into these (urban) settings, and this is one of the capital ways of meeting their needs,” Constant said.

The total budget for the Norwood East neighbourhood project is about $38 million. The federal government is contributing more than $35 million, the City of Winnipeg is contributing $2 million via its tax-increment financing policy and the province is contributing more than $375,000 via Efficiency Manitoba. OCN will pay for the remainder.

La Cour is a step forward in the federal government’s plan to build a strong Canada, said Liberal MP Ginette Lavack (St. Boniface — St. Vital).

“A home is so much more than a roof over our heads,” Lavack said. “It’s really the starting point of a stable life, a thriving family and a strong, diverse and resilient community. It’s about building a stronger Canada, with every partner pulling in the same direction to create homes and the affordable housing market that Canadians need.”

St. Boniface MLA Robert Loiselle said he is proud to be part of a provincial government that engages in economic reconciliation.

“It’s important that projects like this bring together all levels of government, including First Nation governments, in engaging in projects that advance economic reconciliation,” Loiselle said.

Winnipeg is growing, Mayor Scott Gillingham said, and with that growth comes the need for more housing of all kinds.

“This partnership strengthens neighbourhoods, it creates new opportunities for residents and helps to ensure that everyone who wants to call Winnipeg home has a place to do so,” Gillingham said. “(La Cour) is an example of what is possible when we work together.”

For Jonathon Freed, president of Freedhome Developments, the opportunity to collaborate with OCN is meaningful.

“Their vision for infill housing and bringing affordable housing to the marketplace in Winnipeg … really melds well with our vision for our company,” Freed said.

A couple of neighbouring businesses said they support the development.

“We think that it’ll bring more life to St. Boniface and help support the local community,” said Dominique Smith, who works across the street from La Cour at Falcon Leasing.

Construction in the area has been heavy in recent years, noted Chris Kirouac, manager of Dug & Betty’s Ice Creamery, which is located kitty-corner to La Cour.

That can pose challenges for a small business, he said, but ultimately, the addition of an apartment complex to the area is positive. “At the end of the day, more people in the neighbourhood is a good thing,” Kirouac said.

La Cour is the second of three apartments OCN plans to build and own in the next few years. The First Nation celebrated the grand opening of the first complex — a seven-storey, 69-unit building at 380 Young St. — in July. A 240-unit complex in Bridgwater could come in 2028.
Winnipeg Free Press
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #1655  
Old Posted Oct 22, 2025, 6:27 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,175
I noticed piles going in the lot on Dumoulin, across the lane form the Carrington Provencher development.

IIRC it was a Verne Reimer thing. But I dont remember what thw current status or design is.
Reply With Quote
     
     
  #1656  
Old Posted Oct 22, 2025, 6:28 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 7,338
Quote:
Originally Posted by bomberjet View Post
I noticed piles going in the lot on Dumoulin, across the lane form the Carrington Provencher development.

IIRC it was a Verne Reimer thing. But I dont remember what thw current status or design is.
It’s on page one of Winnipeg Construction.

Edit:
Dumoulin Apartments
Location: 158-160 Dumoulin Str
Developer: 10173049 MANITOBA LTD.
Architect: Verne Reimer Architecture
Status: Partial Foundation Permit
Documents: Design Review – February 21, 2025 | Submitted Plans
Media:
Description: 6-storey multi-family residential building encompassing 20 self-contained units and 8 single room occupancy units. The 8 single room occupancy units will be located on the second floor and have access to a shared kitchen/lounge room.
Permits: #25-173628 DP-2025-08-20, Permit. New site development - Development permit for a new MFD (20) units & SRO (12 beds),6-Storey Multi-Family Residential Building with 18 indoor parking stalls
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #1657  
Old Posted Oct 22, 2025, 6:28 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 944
Really loving the way that area is shaping up. If the rest of Goulet and Marion can fill out, it's going to be quite a pleasant area.
Reply With Quote
     
     
  #1658  
Old Posted Oct 22, 2025, 8:59 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,175
Thanks Wpg_Guy. I should've known haha
Reply With Quote
     
     
  #1659  
Old Posted Oct 24, 2025, 6:05 AM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,501
Quote:
Originally Posted by Wpg_Guy View Post
Aubert & St. Joseph Condominiums
Location: 757 Rue St. Joseph
Developer: StreetSide Developments
Architect: 701 Architecture Inc.
Status: In development
Documents: Rezoning–September 4, 2025
Media: December 16th, 2024 – Round Two Stakeholder Meeting
Description: The proposed plan involves rezoning parcels to the “RMF-L” zoning district for a 7-story multi-family building with 115 residential units, including 1-, 2-, and 3-bedroom units, and a height of 72 feet to the parapet. Landscaping exceeds requirements with 26 new trees, 3 preserved trees, and 88 shrubs, alongside a 1,500-square-foot rooftop terrace, internal garbage/recycling facilities, and vehicle access from Aubert Street to an underground parking area.










The appeal against this project was rejected yesterday, allowing the project to move forward.
__________________
"Build baby build."
Reply With Quote
     
     
  #1660  
Old Posted Oct 24, 2025, 12:57 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,757
^talking to agent at street side they are going w bigger suites (1400-1700 sq ft) which will result in bigger $ (600+). i assumed since it was 1 block back from river it was going to be lower cost but that's not the case.

interesingly this condo has come on market last week, it's on 2nd floor facing where the new building is being built. i sure hope no one hides prospective buyer that a new building is coming up right out there window

https://www.realtor.ca/real-estate/28957109/211-760-tache-avenue-winnipeg-st-boniface
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:32 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.