HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #441  
Old Posted Apr 19, 2025, 9:10 PM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
This combined with the library next door will be very interesting. Curious to see what else gets approved for the flats and if Claridge pushes ahead on their multi-tower project.
Reply With Quote
     
     
  #442  
Old Posted Apr 22, 2025, 1:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
Quote:
Originally Posted by ServiceGuy View Post
This combined with the library next door will be very interesting. Curious to see what else gets approved for the flats and if Claridge pushes ahead on their multi-tower project.
The NCC awarded three blocks of the Flats District January 2024 (feels longer), but we've heard nothing since. Don't remember this much of a delay after Dream was awarded.

Otherwise, it's hard to tell if/when Claridge will start Tower 2, or the Sens will complete a deal to buy the land and submit an official proposal.

The rental market seems to be slowing down now with more units on the market, immigration slowing down and the reduction of International students, so we could see a general slow down in constructions, especially if the Cons come in and slash the public service.
Reply With Quote
     
     
  #443  
Old Posted May 7, 2025, 8:57 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
a few interesting tidbits here:

Quote:
Innovative sewage energy project underway at LeBreton Flats
May 7, 2025

A new era of sustainable energy is dawning in Ottawa with the formation of the LeBreton Community Utility Partnership, a joint venture between Envari Holding Inc. (a subsidiary of Hydro Ottawa Holding Inc.) and Theia Partners. Together with the City of Ottawa, the partners have formalized a landmark agreement to implement an advanced Sewage Energy Exchange System (SEES) at the LeBreton Flats redevelopment.

This groundbreaking energy project will harness the untapped thermal potential of wastewater to provide sustainable and efficient building heating and cooling to Odenak, a development in a partnership between Dream Unlimited Corp, Dream Impact Trust and Multifaith Housing Initiative. Located at 665 Albert Street, Odenak will be the first customer for LeBreton Community Utility's SEES.

Odenak is a 608-unit, two-tower project adjacent to the Pimisi light rail transit (LRT) station. It features a mix of market-rate and affordable residential units as well as retail spaces. In a first for Ottawa, it will be sustainably powered by the SEES, which leverages advanced Canadian technology from SHARC Energy Systems. The SEES utilizes highly efficient heat pumps and operates entirely without fossil fuel, marking a significant step towards a cleaner energy future for the city.

Quick facts:
  • This project advances Hydro Ottawa Holding Inc.’s goal of enabling sustainable energy solutions and of its strategic pillar of being the partner of first choice for signature green energy and carbon reduction projects in the community.
  • This project advances the City of Ottawa’s goal of reducing community greenhouse gas emissions by 96 per cent by 2040, as outlined in its Climate Change Master Plan and Energy Evolution.
  • The project will use a Sewage Energy Exchange System (SEES) to transfer thermal energy to/from wastewater for heating and cooling buildings at LeBreton Flats, the first of its kind in Ottawa.
  • The type of SEES proposed for the pilot connection will divert sewage from the City’s collection system into an external well, then filter it to remove large solids and pump it through a heat exchanger to draw energy for either heating or cooling. After, the pumped sewage will be discharged back into the municipal sewer.
  • Once completed, the SEES will provide more than 9 MW of heating and cooling capacity for approximately 2.4 million sq ft of development.
  • By utilizing this system, the LeBreton Community Utility estimates a reduction of approximately 5,066 tonnes of greenhouse gas (GHG) emissions annually compared to traditional buildings relying on boilers and chillers. To visualize 5,066 tonnes, it is the equivalent of the electricity used by 3,387 homes for a full year (as calculated by the Natural Resources Canada’s Greenhouse Gas Equivalencies Calculator).
  • The system will use patented and Canadian-built SHARC Energy technology for efficient heat exchange.
  • There are SEES projects operating in Europe, the United States, Toronto and Vancouver, with other Canadian ones planned. There is growing interest in this technology. City of Ottawa staff are part of a working group with other municipalities to share and exchange ideas as they collectively start using these systems.
  • Odenak is anticipated to welcome its first residents in 2027 and will utilize approximately one-third of the SEES system’s total capacity.
  • 41% of Odenak’s residential units will be affordable housing and prioritize Algonquin and other Indigenous peoples, veterans, recent immigrants, women and children and adults with cognitive disabilities. 31% will also be accessible. The City of Ottawa contributed $15,000,000 to support the project’s affordable housing.
  • This is the second partnership for Dream, Theia Partners and Hydro Ottawa. In 2022, they partnered with Kruger to create the Zibi Community Utility, which uses heat from Kruger’s effluents to heat and cool all of Zibi’s residential and commercial buildings in Ontario and Quebec.
  • SEES may be suitable for connection with other large collector sewers elsewhere in the city.
https://ottawa.ca/en/city-hall/city-news...e-energy-project-underway-lebreton-flats
Reply With Quote
     
     
  #444  
Old Posted May 7, 2025, 10:33 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,669
Quote:
Originally Posted by Spoonsy View Post
I did some Googling, and it seems that these Sharc Energy Piranha waste heat recovery systems are getting more popular here.

Claridge went with this same system at 70 Gloucester St.

OCH quietly installed this in their Mikinak project (you can actually see the two units through the windows on Streetview), and it sounds like they're about to do the same for their upcoming Gladstone Village project.
Reply With Quote
     
     
  #445  
Old Posted May 9, 2025, 10:20 PM
urbanforest urbanforest is offline
Registered User
 
Join Date: Mar 2023
Posts: 332
The tower on the west side of the site is above ground now.
Reply With Quote
     
     
  #446  
Old Posted May 11, 2025, 4:37 PM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
Quote:
Originally Posted by zzptichka View Post
Any newer photos now that the snow is gone?
Reply With Quote
     
     
  #447  
Old Posted May 11, 2025, 5:00 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by ServiceGuy View Post
Any newer photos now that the snow is gone?
A bunch of brand new ones on Skyrise:
https://ottawa.skyrisecities.com/forum/t...kins-will-kpmb-two-row-u-c.37152/page-13
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #448  
Old Posted May 11, 2025, 7:18 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,669
Quote:
Originally Posted by Harley613 View Post

With thanks to RideauRat:







Reply With Quote
     
     
  #449  
Old Posted May 11, 2025, 7:43 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,681
I'm excited to see this one go up possibly more than any other current project. It will be nice to walk down from the escarpment and be able to walk past the library and these seemingly nice podiums and ground level. Walking west of Bronson was so desolate before.

When those towers across from the library eventually go up along with a new arena and hopefully the tall towers at Bayview you'll have a continuous stretch of animated street. Lebreton has been such a missing link for so long.

Sometimes when I walk from downtown to Parkdale/Wellington area I'll use Scott st instead of Somerset. The row of new towers along north Parkdale are so tasty to look at from that angle. The windswept field next to me kind of killed the buzz though.
__________________
I don't understand how communism works.
Reply With Quote
     
     
  #450  
Old Posted May 12, 2025, 12:06 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,239
Quote:
Originally Posted by ponyboycurtis View Post
I'm excited to see this one go up possibly more than any other current project. It will be nice to walk down from the escarpment and be able to walk past the library and these seemingly nice podiums and ground level. Walking west of Bronson was so desolate before.

When those towers across from the library eventually go up along with a new arena and hopefully the tall towers at Bayview you'll have a continuous stretch of animated street. Lebreton has been such a missing link for so long.

Sometimes when I walk from downtown to Parkdale/Wellington area I'll use Scott st instead of Somerset. The row of new towers along north Parkdale are so tasty to look at from that angle. The windswept field next to me kind of killed the buzz though.
Might not be an overly long wait - Good Companions is actively looking at selling their property to a developer and moving to a new location, as part of another development in the early planning stage.
Reply With Quote
     
     
  #451  
Old Posted May 12, 2025, 12:41 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,974
Quote:
Originally Posted by kwoldtimer View Post
Might not be an overly long wait - Good Companions is actively looking at selling their property to a developer and moving to a new location, as part of another development in the early planning stage.
Nice!! Ive always thought this was a prime spot for redevelopment. its a fairly big piece of prime land with about 50% of it used as a parking lot.
Reply With Quote
     
     
  #452  
Old Posted May 12, 2025, 1:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
Quote:
Originally Posted by kwoldtimer View Post
Might not be an overly long wait - Good Companions is actively looking at selling their property to a developer and moving to a new location, as part of another development in the early planning stage.
Quote:
Originally Posted by SL123 View Post
Nice!! Ive always thought this was a prime spot for redevelopment. its a fairly big piece of prime land with about 50% of it used as a parking lot.
And you could do something very interesting with that triangular lot. Will be a little sad to have the Saint-Vincent perched atop the escarpment no longer visible. Same with the Saint-Jean-Baptiste Church eventually.
Reply With Quote
     
     
  #453  
Old Posted May 16, 2025, 5:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
Updates from casscadia on Skyrise and Pat on Rail Fans Canada Discord.





https://ottawa.skyrisecities.com/forum/t...kins-will-kpmb-two-row-u-c.37152/page-13

Also, closeup of roof top terraces from Instagram.

Reply With Quote
     
     
  #454  
Old Posted May 24, 2025, 12:18 AM
Cecca's Avatar
Cecca Cecca is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 91
If anyone cared for an aerial perspective on the progress

Video Link
Reply With Quote
     
     
  #455  
Old Posted May 24, 2025, 3:46 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,974
Quote:
Originally Posted by Cecca View Post
If anyone cared for an aerial perspective on the progress

Video Link
Wow awesome vid! Thanks for sharing
Reply With Quote
     
     
  #456  
Old Posted May 26, 2025, 1:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
Quote:
Originally Posted by Cecca View Post
If anyone cared for an aerial perspective on the progress

Video Link
Fantastic video! Podiums are absolutely massive! This will have such a huge impact on the streetscape, LeBreton and overall skyline like nothing else since Place de Ville.
Reply With Quote
     
     
  #457  
Old Posted May 29, 2025, 3:18 PM
Cecca's Avatar
Cecca Cecca is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 91
Quote:
Originally Posted by J.OT13 View Post
Fantastic video! Podiums are absolutely massive! This will have such a huge impact on the streetscape, LeBreton and overall skyline like nothing else since Place de Ville.
Thanks excited to watch this one grow
Reply With Quote
     
     
  #458  
Old Posted Jun 13, 2025, 7:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
From Rail Fans Canada Discord, Pat and Cobalt respectively. I need to make the trip to see this in person soon.



Reply With Quote
     
     
  #459  
Old Posted Jun 13, 2025, 8:56 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,974
^I've been so impressed by the speed of this project. In comparison to the Renaissance project this is lightning speed
Reply With Quote
     
     
  #460  
Old Posted Jul 2, 2025, 1:30 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,075
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 9:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.