Quote:
Originally Posted by Monctoncore View Post
I see Icon just posted a Job ad for a Site Supervisor. Curious if that will be for this project?
Could very well be.

I am quite optimistic that both St. Bernard Place and the Infinity Tower will get underway next year. I also think that once the rubber stamp is given that the Gateway Towers will start next year too (later this year if you include site prep).

I am somewhat more sanguine about the Downing/Ashford project however. Maybe we'll see renderings next year, but shovels will not appear in the ground before 2026 (at the earliest). There are two principle reasons for this; (1) necessary infrastructure needs to be completed first, and, (2) there is a governmental component to the project (city market, convention space and possibly an art gallery). Anytime a project is beholding on governmental funding and participation, it doubles the time frame required for completion.
__________________
Go 'Cats Go

Last edited by MonctonRad; Oct 2, 2024 at 10:42 AM.
Reply With Quote
     
     
  #282  
Old Posted Oct 23, 2024, 8:19 PM
new kid in town new kid in town is offline
average Moncton enjoyer
 
Join Date: May 2023
Location: Moncton
Posts: 357
There's a couple heavy machinery on site this evening. Couldn't make them out well as the opposing lanes are full of cars
Reply With Quote
     
     
  #283  
Old Posted Oct 23, 2024, 8:50 PM
new kid in town new kid in town is offline
average Moncton enjoyer
 
Join Date: May 2023
Location: Moncton
Posts: 357
Nvm sorry it looked like they were mainly for cable lines
Reply With Quote
     
     
  #284  
Old Posted Feb 6, 2025, 3:26 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,962
Bump.

I generally don't bump threads that have fallen off the bottom of the page, but, Infinity is an important proposal, and I have high hopes we will see a start on this project within the next six months.

As such, I intend to keep this thread on the front page until at least September in the hopes that new updates will be forthcoming.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #285  
Old Posted Feb 6, 2025, 12:55 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,749
I believe the delay was just that they were re-engineering the building to hold its own weight after they did soil tests. If Icon development in Riverview is any indication, they should get started in the spring.

Icon also owns the block between dominion, Gordon & high streets. I wonder what plans they might have for this property.
__________________
We The People
Reply With Quote
     
     
  #286  
Old Posted Feb 6, 2025, 1:42 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,962
Quote:
Originally Posted by josh_cat_eyes View Post
Icon also owns the block between dominion, Gordon & high streets. I wonder what plans they might have for this property.
It is interesting this property remains vacant, especially when you see how many nearby apartment buildings have been constructed in the last five years.

I imagine it probably just has a lower priority for ICON, given their White Pine project in Riverview and Infinity on East Main.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #287  
Old Posted Feb 6, 2025, 9:55 PM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 541
From Canada construct connect

RETAIL STORES, APARTMENTS, TOWNHOMES
Stage:
Design Development
Start Date:
May 2025
Funding:
Private
Value:
$33,800,000
Work Type:
New
Building Type:
RESIDENTIAL

This will most likely be it and if theres no delays this will start in May.
Reply With Quote
     
     
  #288  
Old Posted Feb 6, 2025, 10:29 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,909
Quote:
Icon also owns the block between dominion, Gordon & high streets. I wonder what plans they might have for this property.
Looking at the PAOL site, that one lot includes the apartment building at 25 Dominion Street. I believe that Valmond Robichaud used to own it. I seem to remember that there were plans for a 2nd similar building on this lot. It would be an excellent downtown location; walking distance to the Avenir Center, Sobeys etc.

I also recall Valmond having plans for a hotel on the Harper Lane property.
Reply With Quote
     
     
  #289  
Old Posted Feb 6, 2025, 10:44 PM
AGGUS AGGUS is online now
Registered User
 
Join Date: Mar 2024
Posts: 41
That cost is WAY lower then the original from the 1st post of ~70 M. Is this perhaps for another building?

Quote:
Originally Posted by Leroy321 View Post
From Canada construct connect

RETAIL STORES, APARTMENTS, TOWNHOMES
Stage:
Design Development
Start Date:
May 2025
Funding:
Private
Value:
$33,800,000
Work Type:
New
Building Type:
RESIDENTIAL

This will most likely be it and if theres no delays this will start in May.
Reply With Quote
     
     
  #290  
Old Posted Feb 7, 2025, 4:36 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,962
Quote:
Originally Posted by AGGUS View Post
That cost is WAY lower then the original from the 1st post of ~70 M. Is this perhaps for another building?
Yes, it could be.

The trouble with Canada Construct Connect is that the information published is rudimentary, and not frequently updated. This card may not be entirely factual, or could be incomplete.

Even if the information is accurate, we have no way of knowing if it refers to Infinity or some other aspirational project like St. Bernard Place.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #291  
Old Posted Feb 7, 2025, 12:54 PM
AGGUS AGGUS is online now
Registered User
 
Join Date: Mar 2024
Posts: 41
So what we do know is a approx. 33 M project is starting somewhere in the city in May, hopefully...


[/B][/B]
Quote:
Originally Posted by MonctonRad View Post
Yes, it could be.

The trouble with Canada Construct Connect is that the information published is rudimentary, and not frequently updated. This card may not be entirely factual, or could be incomplete.

Even if the information is accurate, we have no way of knowing if it refers to Infinity or some other aspirational project like St. Bernard Place.
Reply With Quote
     
     
  #292  
Old Posted Feb 7, 2025, 1:31 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,962
Quote:
Originally Posted by AGGUS View Post
So what we do know is a approx. 33 M project is starting somewhere in the city in May, hopefully...
I would take even this with a grain of salt.

The information is aspirational about this project. Market conditions could change <cough>Trump<cough>
__________________
Go 'Cats Go
Reply With Quote
     
     
  #293  
Old Posted Feb 7, 2025, 1:48 PM
adamuptownsj adamuptownsj is offline
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,007
Quote:
Originally Posted by jonny golden View Post
Looking at the PAOL site, that one lot includes the apartment building at 25 Dominion Street. I believe that Valmond Robichaud used to own it. I seem to remember that there were plans for a 2nd similar building on this lot. It would be an excellent downtown location; walking distance to the Avenir Center, Sobeys etc.

I also recall Valmond having plans for a hotel on the Harper Lane property.
You could build something quite a bit larger than 25 Dominion's 4 floors on that lot, now. It's a nice looking building (no idea why I assumed it wasn't, must have been that green roof in the overhead view) but could be complimented by a 5-6 storey neighbour with ground floor commercial along High.

Re: Harper's Lane, you gotta wonder if the construction of Infinity would justify connecting it to the Wheeler ramps via the gap between Staples and Superstore, and realigning the western end to meet Medjuck St.
Reply With Quote
     
     
  #294  
Old Posted Feb 7, 2025, 3:20 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,909
Quote:
Originally Posted by adamuptownsj View Post
You could build something quite a bit larger than 25 Dominion's 4 floors on that lot, now. It's a nice looking building (no idea why I assumed it wasn't, must have been that green roof in the overhead view) but could be complimented by a 5-6 storey neighbour with ground floor commercial along High.

Re: Harper's Lane, you gotta wonder if the construction of Infinity would justify connecting it to the Wheeler ramps via the gap between Staples and Superstore, and realigning the western end to meet Medjuck St.
Absolutely that lot could handle a larger building. The housing demand is strong with no sign of slowing down, so when they do decide to proceed, I can see ICON going taller. Like I mentioned, it's a great location in-that you can easily walk to Main Street. I don't know about ground floor commercial though. I think I'd go all residential.

Interesting idea about a new east-west Harper connection. Looking at the map, it seems like a natural idea. It could take a bit of pressure off of Main Street which can get congested in this area.

Overall, I think we're better off with both these properties now in the hands of ICON.
Reply With Quote
     
     
  #295  
Old Posted Feb 7, 2025, 8:24 PM
C_Boy's Avatar
C_Boy C_Boy is offline
Registered User
 
Join Date: Aug 2008
Posts: 216
Quote:
Originally Posted by adamuptownsj View Post
Re: Harper's Lane, you gotta wonder if the construction of Infinity would justify connecting it to the Wheeler ramps via the gap between Staples and Superstore, and realigning the western end to meet Medjuck St.
I posted an image that I made on this forum around 2011 with that suggestion and what that could look like. A very slight realignment would make this easy. Of course the greatest benefit is coming off Wheeler and bypassing a busy section of Main Street more than anything else. But it would help with some of the flow and even accessing the bottom end of St-George area through this method rather than clogging up the Wheeler/Botsford Intersection even more.
Reply With Quote
     
     
  #296  
Old Posted Mar 30, 2025, 3:02 AM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 541
Icon is finishing the top of their second building, but they haven't begun any site prep for the third one yet. I imagine they're waiting for the ground to thaw before starting work on the Infinity site. The first building was on its fourth floor when construction on the second building began. It seems the assembly line was paused to focus on the Infinity project for now.
Reply With Quote
     
     
  #297  
Old Posted Mar 30, 2025, 11:50 AM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,909
Quote:
Originally Posted by Leroy321 View Post
Icon is finishing the top of their second building, but they haven't begun any site prep for the third one yet. I imagine they're waiting for the ground to thaw before starting work on the Infinity site. The first building was on its fourth floor when construction on the second building began. It seems the assembly line was paused to focus on the Infinity project for now.
Time will tell, but you could be right. They could start Infinity next, then circle back and do the 3rd building in Riverview later. It's been impressive how fast they've been progressing with the Riverview project so far.

I'm also looking forward to their new web site that is supposed to launch next month. Should be interesting.
Reply With Quote
     
     
  #298  
Old Posted Apr 5, 2025, 12:05 AM
Riberview Riberview is offline
Registered User
 
Join Date: Nov 2020
Posts: 266
Icon has a potential problem on their Infinity site.. the pilings are sinking as the ground is quite silty.. prepare for significant delay.
Reply With Quote
     
     
  #299  
Old Posted Apr 5, 2025, 12:27 AM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
.

Last edited by MonctonianSentinel01; Apr 5, 2025 at 3:19 AM.
Reply With Quote
     
     
  #300  
Old Posted Apr 5, 2025, 12:54 AM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,909
Quote:
Originally Posted by Riberview View Post
Icon has a potential problem on their Infinity site.. the pilings are sinking as the ground is quite silty.. prepare for significant delay.
Could you let us know where this info comes from? I thought the pilings were driven down to bedrock, but I don't really know enough about that.

I know they haven't yet started the 3rd building at their Riverview project - I thought they might start Infinity instead, and do Riverview Three afterwards. They've really done an impressive job so far in Riverview.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 8:09 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.