Hi Folks,
Here is an updated list of projects either under-construction or in predevelopment in downtown Winnipeg. I've done my best to double-check all the numbers, but with a list this long there are likely to be a few errors. Please correct me if you spot any mistakes and I will update the list.
Under Construction:
127 Bannatyne Ave:
-New mixed-use building with 90 rental apartments, commercial space, and office space
-Projected completion date of Spring 2025
-More Info:
https://alstonproperties.com/development/
The Bay Redevelopment (Wehwehneh):
-Conversion of the old Hudson’s Bay building into 373 apartments (200 of which will be affordable apartments), 2 restaurants, a health centre, a child-care facility, a senior’s centre, an art gallery, and office space.
-Construction of the interior courtyard has started.
-The expected completion date is the 2nd quarter of 2028.
-More Info:
https://scoinc.mb.ca/tower-crane-installation/
214 Main St:
-Renovation of the old Winnipeg Hotel into a new Boutique Hotel.
-Restoration of the building’s facade started in Fall 2024 but construction appears to have stalled.
-This building is the oldest building in downtown Winnipeg, built in 1873, the same year that Winnipeg was incorporated.
-More Info:
https://www.cbc.ca/news/canada/manit...ions-1.6283825
109 Mayfair Ave:
-New 15-story building with 96 rental apartments.
-Construction started in summer 2024 and the structural components of the building have been completed. Work on the interior is ongoing.
-More Info:
https://skyscraperpage.com/forum/sho...d.php?t=239189
308 Colony St:
-New 21-story mixed-use building with 214 rental apartments (86 affordable units).
-Construction started in Fall 2023. The structure of the building has been completed and interior work is ongoing.
-More Info:
https://www.cbc.ca/news/canada/manit...ipeg-1.6920481
380 Young St:
-New 7-story building being built next to the U of W. The building will be owned by Opaskwayak Cree Nation and will contain 69 affordable apartments.
-The building exterior is mostly done and interior work is ongoing. The building is expected to be finished on May 1, 2025.
-More Info:
https://www.cbc.ca/news/canada/manit...outh-1.6710334
Sutton Place Hotel:
-The original plan was two towers on a podium: The first tower was an 18-story hotel and the second tower was a 13-story short-term-stay residential tower with 130 apartments. The design has now been revised to a single 25-story hotel.
-Construction has kind of started back up, but things are moving very slow.
-More Info:
https://skyscraperpage.com/forum/showthread.php?t=217327&page=388
185 Donald St (300 St Mary Ave):
-New 14 story mixed-use building with 120 rental apartments
-The foundation of the building was mostly finished but then original developer went bankrupt. The building went up for sale and was bought by a new developer. Construction has now restarted and the structural frame of the building is going up quickly.
-More Info:
https://skyscraperpage.com/forum/sho...d.php?t=252309
Marketlands South:
-Redevelopment of the site of the former Public Safety Building (currently a large gravel parking lot behind City Hall).
-Mixed-use building with 95 apartments and 20,000 sq ft of commercial space for art organizations. 48 of the apartments will be rent-geared-to-income.
-More Info:
https://www.cbc.ca/news/canada/manitoba/market-lands-apartments-rent-geared-to-income-1.7178292
138 Portage Ave E:
-New mixed-use redevelopment and addition to the existing heritage building located at 138 Portage Ave E.
-The buildings will contain a total of 117 residential units.
-More Info:
https://www.winnipegfreepress.com/bu...ing-on-history
-More Info:
https://www.winnipeg.ca/building-develop...accelerator-fund/capital-grant-incentive
325 Broadway:
-Former CRA building will be converted into a 5-star Hyatt Centric hotel
-Interior work is ongoing.
-More Info:
https://www.cbc.ca/news/canada/manit...ipeg-1.6920481
355 Main St:
-The old Bank of Montreal building at Portage and Main will be converted into the new home of the Metis Nation Heritage Centre.
-It’s hard to find information on this project but I’ve heard that interior work on the building has started.
-More Info:
https://winnipeg.ctvnews.ca/manitoba-m%C...l-building-at-portage-and-main-1.6111360
In Pre-Development:
Portage Place Mall Redevelopment:
-Redevelopment of Portage Place Mall, including a new 15-story medical centre and a 13-story residential tower.
-The atrium along Edmonton St will be demolished and turned into an outdoor pedestrian zone.
-The section east of Edmonton St will become a medical services tower.
-The remaining section of the mall (west of Edmonton St) will contain a grocery store, Service Canada office, Manitoba Health office, Downtown Biz office, Downtown Safety Partnership office, Manitoba Housing offices, a food court, office space for lease, retail space for lease, and a some of the existing stores such as Shoppers Drug Mart and Foot Locker.
-The residential tower will contain 200 apartments, including 80 affordable apartments.
-More Info:
https://www.cbc.ca/news/canada/manitoba/portage-place-true-north-1.7336504
-More Info:
https://skyscraperpage.com/forum/showthread.php?t=240158&page=69
Forks Railside:
-Huge, multi-decade mixed-use redevelopment of several large surface parking lots at The Forks.
-Phase 1 of the project will have 10 new mixed-use buildings constructed.
-Water and Sewer work has been completed. Several buildings have had their zoning variances approved. Construction is expected to being in Spring 2025 with the first residents moving-in in early 2027.
-This may be out of date, but the website for Prarie Architects lists a total of 339 housing units for Phase 1 (south of York Ave). Source:
https://www.prairiearchitects.ca/forks-railside-housing-condominiums
-More Info:
https://www.railsideattheforks.com/
Marketlands North Tower:
-The Market Lands North Tower will provide 128 mixed-income housing units, including affordable options tailored for Indigenous peoples, newcomers, women with children, and young people. This is the second building to be announced for the redevelopment of the site where the Public Safety Building was located.
-More Info:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
-More Info:
https://www.winnipegfreepress.com/opinio...m-leading-into-major-construction-season
Marketlands North Mixed-Use:
This new mixed-use development will provide 128 mixed-income housing units, including 48 deeply affordable units, a large commercial space, and a daycare with a dedicated play area. This is the third building to be announced for the redevelopment of the site where the Public Safety Building was located.
-More Info:
https://www.winnipeg.ca/building-development/housing/affordable-housing-now
637 Main St:
-111 units of rent-geared-to-income housing, owned and operated by Main Street Project, to address homelessness in Winnipeg.
-More Info:
https://www.winnipeg.ca/building-develop...accelerator-fund/capital-grant-incentive
120 & 128 James Ave:
-This heritage property conversion in the heart of the Exchange District includes a new four-storey addition on top of 128 James Ave. and a new 10 storey building at 120 James Ave., adding 87 new units in total.
-More Info:
https://skyscraperpage.com/forum/showthread.php?t=235120&page=40
-More Info:
https://www.winnipeg.ca/building-develop...accelerator-fund/capital-grant-incentive
440 Edmonton St:
-Conversion of a vacant 13-story commercial building into a residential complex with 180 transitional, social, and affordable housing units.
-The building was formerly the Parkview Place Long Term Care Home, which was shut down in 2022 after 30 residents died from Covid.
-More Info:
https://www.winnipegfreepress.com/breakingnews/2022/03/30/care-home-nearly-vacated
-Source:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
228 King St:
-New building with 54 units in Chinatown, including affordable and rent-geared-to-income units.
-Source:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
252 Good St:
-New building on the edge of downtown (technically in West Broadway) that will replace several surface parking lots. The building will contain 165 residential units, including 50 affordable housing units and commercial space.
-Source:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
346 Pacific Ave:
-New development on the edge of the Exchange District which will convert parking lot into 128 units of housing, including 38 affordable units.
-Source:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
125 Garry St:
-Conversion of an existing office building into a mixed-use building with 126 housing units, including 32 affordable units.
-Source:
https://winnipegsun.com/news/local-news/winnipeg-feds-hand-out-25m-for-housing-development-projects
187 Garry St:
-New mixed-use development where the Windsor Hotel was located. The development will consist of a 6-story tower next to a 12-story tower. In total, there will be 3 commercial units and 149 residential units.
-More Info:
https://legacy.winnipeg.ca/ppd/PublicNotices/detail/VARIANCE-24-192824%2FB
300 Princess St:
-The 16-unit facility will be inclusive and low-barrier, welcoming diverse populations including those struggling with addictions and mental health challenges. The project aims to meet a critical need for safe and stable transitional housing for individuals who would be facing homelessness post-hospitalization.
-More Info:
https://www.winnipeg.ca/building-development/housing/affordable-housing-now
667-669 Main St:
-The retrofit of a heritage building downtown will provide 12 units of housing and detox services to people who are struggling with addiction.
-More Info:
https://www.winnipeg.ca/building-development/housing/affordable-housing-now
-22 Granite Way:
-11-story mixed-income development on a city-owned parking lot next to the Granite Curling Club. The building will contain 111 apartments, with 56 of them being affordable apartments including 30 rent-geared-to-income units.
-More Info:
https://www.cbc.ca/news/canada/manitoba/...anite-curling-club-parking-lot-1.7470833
Totals:
Under Construction: 1174 housing units
In Predevelopment: 1934 housing units
Grand Total: 3108 housing units