Quote:
Originally Posted by YOWetal View Post
I think your long standing claim that the LRT has made service worse for more people than it's helped is probably true but that's likely a small part of the difference. We haven't seen a surge in commuters and our huge captive public servant commuters who inflated our starting number are now in the office half the time and as well above average income earners are generally able to commute by car or even uber to avoid transit.
I am not even arguing against the downtown tunnel. It was an absolute necessity. However, the 2019 launch was not just the train problems. We heard about the bus connection issue and it got buried. We p*issed off a lot of riders when a bus service cut accompanied the opening of the train. And it has only become worse since then with OC not even able to have enough staff and buses to maintain reduced service. It is no wonder PS staff don't want to go back to the office with transit connections failing, traffic jammed and parking in short supply and the Feds wrecking the office environment over the pandemic, an experiment that few private businesses would implement.

OC and Ottawa are in big trouble by implementing plans that don't grow ridership and increase operating costs very high.

Where are the new busways that beyond the capital cost, may reduce operating costs while also improving service to customers. Busways and other transit priority measures are lost in the billions allocated to rail while we make the last mile problem worse. Why should someone wanting to save money and use transit, have to spend $4 on transit and $10 on Uber?
     
     
  #17922  
Old Posted Feb 25, 2025, 3:44 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,090
Quote:
Originally Posted by lrt's friend View Post
Ottawa is simply not designing it's transit network to make transfers easy and reliable.
In fact, when it comes to the physical plant for transfers, we make it deliberately harder than it needs to be, and then you feel like you are speaking Chinese to a Klingon when you explain to the transit official or consultant about the problem, before they go ahead and ignore you about it.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #17923  
Old Posted Feb 25, 2025, 3:57 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
Quote:
Originally Posted by kmcamp View Post
One thing I wondered if it's necessary to run every line 1 and 3 train out to Trim. I figure they could short turn Line 3 at Blair, and then you could do a 6 minute frequency in the shared section, then 12 minutes on the branches out to the burbs (like line 2/4). It would definitely make transfers in the system easier
If there is a tail track at Blair, isn't it inevitable to short turn trains at Blair to save money.

Place d' Orléans will be a more important bus terminus than Trim but OC seems to like dumping passengers at empty fields rather than where passengers might want to go, like a major shopping centre.
     
     
  #17924  
Old Posted Feb 26, 2025, 12:16 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Uhuniau View Post
Or Parliament.

If the screens were still working. Which, of course, they are not. But at ten-minute frequencies, there are going to be times and destinations where it makes more sense for me to just hop on the 11 or 16 and head west, than it does to climb downstairs and wait 9 minutes and 45 seconds for the train that I would be about to miss.



But the train departure information is not available on the surface.
I feel that there's some software interconnectivity issue they aren't telling us, since neither new or old screens show the real train departure time.

I know they gave the excuse "we don't want you running for the train", but that excuse falls flat since every Line 2 station has a dot matrix display over the faregates with the actual departure time

Last edited by kmcamp; Feb 26, 2025 at 12:30 PM.
     
     
  #17925  
Old Posted Feb 26, 2025, 5:15 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,090
Quote:
Originally Posted by kmcamp View Post
I know they gave the excuse "we don't want you running for the train", but that excuse falls flat since every Line 2 station has a dot matrix display over the faregates with the actual departure time
I don't want to be running for no train, either, given the choice of flooring materials in Parliament and its stairs. However, I do want to be given all the information I require to decide whether it's worth my time or effort to wait or run for the bus.

The base problem as usual is that the people in charge don't think like transit users, and can't think like transit users, because they aren't transit users.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #17926  
Old Posted Feb 27, 2025, 12:42 PM
Lakeofthewood Lakeofthewood is offline
Registered User
 
Join Date: Jan 2017
Location: Downtown Ottawa
Posts: 314
Quote:
Originally Posted by Uhuniau View Post
I don't want to be running for no train, either, given the choice of flooring materials in Parliament and its stairs. However, I do want to be given all the information I require to decide whether it's worth my time or effort to wait or run for the bus.

The base problem as usual is that the people in charge don't think like transit users, and can't think like transit users, because they aren't transit users.
It kills me how many Stage 1 stations make it impossible to see the departure times from outside of the station, and even in the station is difficult. Tremblay comes to mind, but I know there are others.
     
     
  #17927  
Old Posted Feb 27, 2025, 1:14 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by Lakeofthewood View Post
It kills me how many Stage 1 stations make it impossible to see the departure times from outside of the station, and even in the station is difficult. Tremblay comes to mind, but I know there are others.
Yeah, I'd like to see screens on concourse levels of all stations.
     
     
  #17928  
Old Posted Feb 27, 2025, 2:20 PM
DogsWithJobs DogsWithJobs is offline
Registered User
 
Join Date: Oct 2017
Posts: 71
Quote:
Originally Posted by Lakeofthewood View Post
It kills me how many Stage 1 stations make it impossible to see the departure times from outside of the station, and even in the station is difficult. Tremblay comes to mind, but I know there are others.
This is the station I use most and this has always frustrated me, but I figured it was a lazy oversight or cost cutting measure.

In addition to wanting to know if I should speed up my pace a bit, I've also found myself in the situation where I don't want to pay and then wait 10 minutes on the platform.
It is feasible for me to get on at Tremblay, get off at parliament, go to an hour appointment and get back on the train platform in the transfer window. But with the trains running slow on much of the track and the 10 minute frequency it is very easy to just barely miss that window and have to pay again.

The system is not reliable enough to withhold information from its users.
     
     
  #17929  
Old Posted Feb 27, 2025, 4:35 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,090
Quote:
Originally Posted by DogsWithJobs View Post
This is the station I use most and this has always frustrated me, but I figured it was a lazy oversight or cost cutting measure.

In addition to wanting to know if I should speed up my pace a bit, I've also found myself in the situation where I don't want to pay and then wait 10 minutes on the platform.
It is feasible for me to get on at Tremblay, get off at parliament, go to an hour appointment and get back on the train platform in the transfer window. But with the trains running slow on much of the track and the 10 minute frequency it is very easy to just barely miss that window and have to pay again.

The system is not reliable enough to withhold information from its users.
Yeah, at somewhere like the downtown subway stations, I would like to have that information so that I can make a rational decision about what to do with the next almost-ten minutes. I'd rather not waste it waiting for the next train because I will have missed the previous one by 76 seconds, when I could better use that time to quickly do some ATM business or, sometimes, even take a leak.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #17930  
Old Posted Feb 27, 2025, 5:38 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 327
Pimisi Level 1 is in great shape

Feb 27 2025


https://i.imgur.com/HtM7cqf.jpeg
     
     
  #17931  
Old Posted Feb 27, 2025, 5:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
When they destroyed the City's dead Ash stock-pile, they should have pivoted to wood-ish looking metal like Line 2. Cheaper, cleaner, less maintenance.
     
     
  #17932  
Old Posted Feb 27, 2025, 7:22 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
When they destroyed the City's dead Ash stock-pile, they should have pivoted to wood-ish looking metal like Line 2. Cheaper, cleaner, less maintenance.

I think the one they used for Line 2/4 looks better than what they picked for the newer Line 1 stations like trim

Uplands:


Trim:
     
     
  #17933  
Old Posted Feb 27, 2025, 7:25 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Spoonsy View Post
Pimisi Level 1 is in great shape

Was there a flood? That area is fairly weather protected. It might actually also be part of the wifi project, they were extending it to all stations
     
     
  #17934  
Old Posted Feb 27, 2025, 10:44 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,090
Wait - why is there salt in the goddamn interior?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #17935  
Old Posted Feb 28, 2025, 1:28 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by Uhuniau View Post
Wait - why is there salt in the goddamn interior?
We want the entire stations equally damaged by salt. It just wouldn't look right if the exterior was corroded and the interior was in decent shape.
     
     
  #17936  
Old Posted Feb 28, 2025, 7:49 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 327
Quote:
Originally Posted by kmcamp View Post
Was there a flood? That area is fairly weather protected. It might actually also be part of the wifi project, they were extending it to all stations
I took this the week before, based on the pattern on the floor I think probably a leak:

Feb 20 2025

https://i.imgur.com/6qMVUts.jpeg

Meanwhile over at Bayview they have this access panel positioned right above the Trillium Pathway and it drips water directly onto the pathway all winter

Feb 27 2025

https://i.imgur.com/iwBeGWT.jpeg
     
     
  #17937  
Old Posted Feb 28, 2025, 11:09 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
For each 5 second reduction in station wait times, we can reduce end to end trip time by 1 minute. When Phase 2 opens, this becomes 2 to 3 minutes end to end. So, if we reduce station wait times by 10 seconds, this becomes 2 minutes for Phase 1 and 4 to 6 minutes when Phase 2 opens. Why is something as simple as this not considered? Or do we not care about making rapid transit actually rapid?
     
     
  #17938  
Old Posted Mar 1, 2025, 12:49 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
For each 5 second reduction in station wait times, we can reduce end to end trip time by 1 minute. When Phase 2 opens, this becomes 2 to 3 minutes end to end. So, if we reduce station wait times by 10 seconds, this becomes 2 minutes for Phase 1 and 4 to 6 minutes when Phase 2 opens. Why is something as simple as this not considered? Or do we not care about making rapid transit actually rapid?
I agree with you here. The dwell times seem excessive right now. There hasn't been door issues in ages
     
     
  #17939  
Old Posted Mar 5, 2025, 10:19 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
What to think of those wire-suspended light fixtures at Tunney's Pasture?
Is this a fun and fancy-free setup, or just a bad design?





     
     
  #17940  
Old Posted Mar 5, 2025, 11:08 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by eltodesukane View Post
What to think of those wire-suspended light fixtures at Tunney's Pasture?
Is this a fun and fancy-free setup, or just a bad design
It's just a style they chose. All the line 1 stations have lights like that in their stairwells. It doesn't affect the functionality, so really it's just a matter of taste. They are fine to me. Actually I'll give them some credit for trying to add flair to the lighting in general, even the kind of spaceship like look they give to the entrances of stations like Pimisi


Last edited by kmcamp; Mar 5, 2025 at 11:32 PM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:56 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.