  #741  
Old Posted Feb 15, 2025, 8:55 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Data Template Infotech, Manasa Tower, MG Road

Data Template IT Services & Consulting



Earlier CoreLogic was located here before take over by Cognizant.
Reply With Quote
     
     
  #742  
Old Posted Feb 16, 2025, 3:49 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Land Transportation - Road

ಮಂಗಳೂರಿನ ಈ ‘ಸ್ಮಾರ್ಟ್’ ರಸ್ತೆಯಲ್ಲಿ ಕಟ್ಟೋದು, ಕೆಡವೋದೆ ಕೆಲಸ!

Samithi urges NHAI to restore Nanthoor-Surathkal stretch of NH-66

Mangaluru residents ask NHAI to complete land acquisition process for road widening at the earliest

Long-awaited road development work begins to enhance access to railway station

High court stays demolition of Miyawaki forest at Padua junction in Mangaluru
Quote:
The National Highway Authority of India (NHAI) had earlier ordered the removal of the forest to facilitate a highway expansion project, sparking widespread concern among environmentalists and local residents.
Santhekatte underpass work accelerates as second phase gains momentum


Vijayanagar Road residents demand urgent action as muddy conditions worsen

District court upholds DC’s order enhancing compensation for acquiring land to widen NH 169

Build Kulur bridge, Nanthoor flyover Immediately, urges CPM

KSRTC plans to operate Ashwamedha service on M’luru-Kasaragod route

Karnataka High Court extends stay on clearing trees in Miyawaki urban forest

ಪೊಳಲಿ, ಉಳಾಯಿಬೆಟ್ಟುವಿನಲ್ಲಿ ಹೊಸ ಸೇತುವೆ ನಿರ್ಮಾಣಕ್ಕೆ ಜಿಲ್ಲಾಧಿಕಾರಿ ಶಾಸಕ ಡಾ. ಭರತ್ ಶೆಟ್ಟಿ-ರಾಜೇಶ್ ನಾಯ್ಕ್ ಮಾತುಕತೆ

MLAs discuss Addoor-Polali, Ulaibettu bridge construction, upgrades with DC

Mahakalipadpu twin RuBs to be ready by January

Link GPS location to Integrated Command and Control Centre: Mangaluru DC to bus operators
Integrate GPS of buses with command control centre: DC

ಎಂಟು ಹೊಸ ರೂಟ್ಗಳಲ್ಲಿ ಪರವಾನಿಗೆಗೆ ಪ್ರಸ್ತಾವ
ಧರ್ಮಸ್ಥಳ-ಮಂಗಳೂರು ರೂಟ್: ಕೆಎಸ್ಆರ್ಟಿಸಿ ಬಸ್ ಕೊರತೆ, ವಿದ್ಯಾರ್ಥಿಗಳ ಪರದಾಟ
KSRTC seeks approval for Mangaluru-Karkala bus services amidst public demand

KSRTC proposes new routes, private bus owners raise objections

9 Bidders for Bangalore – Mangalore Expressway’s DPR Consultant Contract
Quote:
MoRTH’s Brief Scope: Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Mangaluru-Bengaluru passing through the State of Karnataka.
Quote:
If a contract is awarded in the first half of 2025, we can expect the DPR to be finalized by 2026-end. It will then go through the motions of approval, land acquisition and other clearances – so at this time I see construction work starting no sooner than 2028.
9 Bidders for Bangalore – Mangalore Expressway’s DPR Consultant Contract
Quote:
Among these projects is the Bangalore-Mangalore corridor. 9 firms have already submitted bids to prepare a Detailed Project Report (DPR) for the construction. Project construction tentative start expected to be in 2028.
Bengaluru-Mangalore Expressway Project update
Quote:
• AICONS Engineering
• Chaitanya Projects Consultancy
• Consulting Engineers Group
• Egis India Consulting Engineers
• Lion Engineering Consultants
• L N Malviya Infra Projects
• Monarch Surveyors and Engineering Consultants
• SA Infrastructure Consultants
• Theme Engineering Services

Since these are just bids for the DPR preparation, we can expect the actual work to begin no sooner than 2027, if everything happens quickly. Once ready, the travel time between Bengaluru and Mangalore will come down to just 3 hours!
All-weather high-speed road to link Bengaluru-Mangaluru
MoRTH Plans Bengaluru-Mangaluru Expressway to Boost Connectivity and Economic Growth
ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಎಕ್ಸ್ಪ್ರೆಸ್ ವೇ ಗೆ ಕೇಂದ್ರ ಸರ್ಕಾರ ಸಿದ್ದತೆ: 9 ಕಂಪನಿಗಳಿಂದ ಟೆಂಡರ್ ಸಲ್ಲಿಕೆ

Bengaluru-Mangaluru high-speed road project set to begin in 2028
Quote:
Dakshina Kannada district in-charge minister, Dinesh Gundu Rao, emphasized the urgent need for improved connectivity to Mangaluru, describing the high-speed corridor as a vital requirement for the region. "The project remains in its conceptual phase, but we are advocating for it. Currently, there is no effective connectivity between coastal Karnataka and other regions in the state. Mangaluru, along with its port, is largely isolated, hindering its potential development," he explained, adding that the existing road routes are long and challenging, and even rail and air options remain limited and costly.

Environmental and economic concerns

Gundu Rao acknowledged the environmental and financial considerations associated with the expressway but maintained that the benefits of enhanced connectivity outweigh the challenges. The Karnataka Public Works Department (PWD) will collaborate with the National Highways Authority of India (NHAI) to assist with alignment planning and land acquisition.

"The alignment of the road needs to be finalized, which includes bypass routes, financial models, and toll considerations. To support the project financially, we may even consider developing townships along the route," Gundu Rao added.
Faster & reliable! Expressway between Bengaluru-Mangaluru - Joint venture between KPWD & NHAI
Quote:
It is also worth mentioning that the Bengaluru-Mangaluru Expressway will be a joint venture between the Karnataka Public Works Department (KPWD) and the National Highways Authority of India (NHAI). Both agencies will collaborate on critical elements of the project, including road alignment and land acquisition, to ensure the timely completion of the project.
Expressway: ಸದ್ದಿಲ್ಲದೇ ಬೆಂಗಳೂರು - ಮಂಗಳೂರು ಎಕ್ಸ್ಪ್ರೆಸ್ವೇ ನಿರ್ಮಾಣಕ್ಕೆ ಸಿದ್ಧತೆ.. 3 ಗಂಟೆ ಪ್ರಯಾಣ?

Mangaluru-Bengaluru Expressway | ಕರಾವಳಿ ಪ್ರಯಾಣಕ್ಕೆ ಗುಡ್​ನ್ಯೂಸ್​ |DPR​​ ಟೆಂಡರ್​​ನಲ್ಲಿ 9 ಕಂಪನಿಗಳು ಭಾಗಿ
Video Link


ಚಾರ್ಮಾಡಿ ಘಾಟ್ ಹೆದ್ದಾರಿ ದ್ವಿಪಥ ಕಾಮಗಾರಿ ಶೀಘ್ರ ಆರಂಭ: ಸಂಸದ ಕ್ಯಾ. ಚೌಟ
Centre allocates Rs 343.74 crore to upgrade Charmadi Ghat highway to two lanes

KSRTC: ಮಂಗಳೂರು-ಕಾಸರಗೋಡು ನಡುವೆ ಓಡಲಿದೆ ಅಶ್ವಮೇಧ ಬಸ್

Vending zone to be functional from November 13

ಪಂಪ್ವೆಲ್ ಟರ್ಮಿನಲ್; ಪ್ರಸ್ತಾವನೆ ಒಪ್ಪಿಗೆ ಸಾಧ್ಯತೆ

Summa: Pumpwell Integrated Bus Terminal & commercial complex old tender proposal of Rs. 445 crores will be re-executed with Swiss Challenge Method.

Mangaluru's Push for Electric-Only Public Transport to Combat Pollution

Why EV is promoted only in Public Transportation?

Mangaluru’s New Vending Zone Opens for Street Vendors, Excluding Food Sellers

Bantwal: ನೇತ್ರಾವತಿ ಹೊಸ ಸೇತುವೆ ಸಂಚಾರಕ್ಕೆ ಮುಕ್ತ
Quote:
Additional two-lane bridge across Netravathi River opens for traffic at B.C. Road
386 mt long

M/s KNR got the new bridge completed within three years of taking up the fresh contract. The bridge has been 386 mt long, 13.5 mt wide and is about 16 mt in height from the base of the river. It was supported by 11 pillars at an approximate distance of 38 mt each.

The vehicular overpass at Panemangaluru junction was almost complete and the NHAI has allowed vehicular movement on the new VoP. Another VoP at Melkar junction was expected to be opened by this month-end. Yet, traffic congestion between B.C. Road and Mani junction might not get eased up soon as the widening work between Melkar and Kalladka was still under progress.
Slush pools disapper, yet potholes and craters along Punjalakatte-Charmadi stretch of NH 73 irk road users

Ultraviolette Launches New Experience Centre in Mangaluru, Here's What Company Says

HC stay on removal of Miyawaki forest at Nanthoor – Flyover work stalled

ಬೊಂದೇಲ್-ಕಾವೂರು ರಸ್ತೆಯಲ್ಲಿಲ್ಲ ಫುಟ್ಪಾತ್

Trust urges MCC to widen Bolar Main Road with pedestrian infrastructure

Namma Yatri Expands to Mangalore, Aims To Transform Local Transport

Absence of proper signboards on either side of Pumpwell Circle flyover on NH 66 puts motorists in a quandary

Nanthoor Junction road widening and asphalting improves traffic flow in Mangaluru

ಸಾವಿನ ದಾರಿಯಾದ ಮಂಗಳೂರಿನ ನಂತೂರು-ಸುರತ್ಕಲ್ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ

ಚಾರ್ಮಾಡಿ ಘಾಟ್ ದ್ವಿಪಥ ರಸ್ತೆ – ಎಸ್ಎಲ್ವಿ ಕನ್ಸ್ಟ್ರಕ್ಷನ್ ಕಂಪೆನಿಗೆ ಕಾಮಗಾರಿ
Quote:
... ಕಾಮಗಾರಿಗೆ 343 ಕೋಟಿ ರು.ಗಳನ್ನು ಕೇಂದ್ರ ಸರ್ಕಾರ ಈಗಾಗಲೇ ಬಿಡುಗಡೆ ಮಾಡಿದ್ದು, ಟೆಂಡರ್ ಪ್ರಕ್ರಿಯೆ ಪೂರ್ಣಗೊಂಡಿದೆ. ಎಸ್ಎಲ್ವಿ ಕನ್ಸ್ಟ್ರಕ್ಷನ್ ಕಂಪೆನಿಗೆ ಕಾಮಗಾರಿ ಸ್ವೀಕಾರ ಪತ್ರ ನೀಡಲಾಗಿದೆ. ಇನ್ನು ಘಾಟ್ ರಸ್ತೆಯಲ್ಲಿರುವ ಮರಗಳ ತೆರವು ಪ್ರಕ್ರಿಯೆ. ಕೆಲವೆಡೆ ಭೂಸ್ವಾಧೀನ, ಪರಿಹಾರ ವಿತರಣೆ. ವಿದ್ಯುತ್- ನೀರಿನ ಲೈನ್ ಸ್ಥಳಾಂತರ ಇನ್ನಿತರ ಪೂರ್ವಭಾವಿ ಕೆಲಸಗಳನ್ನು ಮುಗಿಸಿ ಕಾಮಗಾರಿ ಆರಂಭವಾಗಲು ಇನ್ನೆರಡು ತಿಂಗಳಾದರೂ ಬೇಕು ಎನ್ನುತ್ತಾರೆ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಅಧಿಕಾರಿಗಳು. ಇಲಾಖೆ 11 ಕಿಮೀ ಕಾಮಗಾರಿ: ಚಾರ್ಮಾಡಿ ಘಾಟಿ ಮಾರ್ಗದ 25 ಕಿ.ಮೀ. ಪೈಕಿ 11 ಕಿ.ಮೀ. ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲಾ ವ್ಯಾಪ್ತಿಗೆ ಹಾಗೂ ಉಳಿದ ರಸ್ತೆ ಚಿಕ್ಕಮಗಳೂರು ಜಿಲ್ಲೆಗೆ ಸೇರಿದ್ದಾಗಿದೆ. ಈಗ ಕಾಮಗಾರಿ ನಡೆಯುವುದು ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲಾ ವ್ಯಾಪ್ತಿಯ 12ನೇ ತಿರುವಿನವರೆಗೆ ಮಾತ್ರ. ಚಿಕ್ಕಮಗಳೂರು ಜಿಲ್ಲಾ ವ್ಯಾಪ್ತಿಯ ರಸ್ತೆ ಕಾಮಗಾರಿ ಯೋದನೆ ಡಿಪಿಆರ್ ಹಂತದಲ್ಲಿದೆ.

ಪ್ರಸ್ತುತ ದ.ಕ. ಜಿಲ್ಲಾ ವ್ಯಾಪ್ತಿಯ 11 ಕಿ.ಮೀ. ಘಾಟಿ ರಸ್ತೆ ಕಾಮಗಾರಿಗೆ ಕೇಂದ್ರದಿಂದ 343 ಕೋಟಿ ರು. ಬಿಡುಗಡೆಯಾಗಿದ್ದರೂ, ಟೆಂಡರ್ ಆಗಿರೋದು 175 ಕೋಟಿ ರು.ಗೆ ಮಾತ್ರ. ಘಾಟಿ ಮಾರ್ಗದ ಆರಂಭದಲ್ಲಿ 900 ಮೀ. ವ್ಯಾಪ್ತಿಯಲ್ಲಿ ಖಾಸಗಿ ಭೂಮಿ ಇದ್ದು, ಅದಕ್ಕೆ ಪರಿಹಾರ ನೀಡುವುದು ಸೇರಿದಂತೆ ಕಾಮಗಾರಿಯ ಇತರ ಪೂರ್ವಭಾವಿ ಕೆಲಸಗಳಿಗೆ ಉಳಿದ ಹಣವನ್ನು ಬಳಕೆ ಮಾಡಲಾಗುತ್ತದೆ. ...
ಮಂದಗತಿಯಲ್ಲಿ ಬಿ.ಸಿ.ರೋಡ್-ಅಡ್ಡಹೊಳೆ ಚತುಷ್ಪಥ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ: ಧೂಳಿಂದಾಗಿ ಮಕ್ಕಳನ್ನು ಕಾಡುತ್ತಿದೆ ಆರೋಗ್ಯ ಸಮಸ್ಯೆ

ಮಂಗಳೂರು ಸಿಟಿಯ ಮಲ್ಟಿ ಲೆವೆಲ್ ಕಾರ್ ಪಾರ್ಕಿಂಗ್ ಕಾಮಗಾರಿ ಸಂಪೂರ್ಣ ಸ್ಥಗಿತ
Work on parking-cum-commercial complex at Hampankatta to resume on December 10: Mayor

ಡಾ| ಅಂಬೇಡ್ಕರ್ ವೃತ್ತ ‘ಪ್ರಾಯೋಗಿಕ’ ನಿರ್ಮಾಣ

ಮಂದಗತಿಯಲ್ಲಿ ಬಿ.ಸಿ.ರೋಡ್-ಅಡ್ಡಹೊಳೆ ಚತುಷ್ಪಥ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ: ಧೂಳಿಂದಾಗಿ ಮಕ್ಕಳನ್ನು ಕಾಡುತ್ತಿದೆ ಆರೋಗ್ಯ ಸಮಸ್ಯೆ

NH caves in near Kulur; trench dug up for gas pipeline blamed

Union Minister Nitin Gadkari seeks report on NH 66 between Talapady and Kundapura

Mangaluru's Mahaveer Circle to undergo Rs 4 crore revamp: Enhanced infrastructure and service roads

Union min urged for infra upgrades to enhance safety on NH-66

ಚಾರ್ಮಾಡಿ ಘಾಟಿ ತಡೆಗೋಡೆ ಕಾಮಗಾರಿ ಬಹುತೇಕ ಪೂರ್ಣ: ಇನ್ನು ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಸಂಚಾರ ಸುಗಮ

ಫೆಂಗಾಲ್ ಎಫೆಕ್ಟ್: ಬಿ.ಸಿ.ರೋಡ್-ಅಡ್ಡಹೊಳೆ ಚತುಷ್ಪಥ ಕಾಮಗಾರಿ ಹಿನ್ನೆಲೆ ರಸ್ತೆ ತುಂಬಾ ಕೆಸರು, ಡ್ರೈವಿಂಗ್ ಮಾಡುವಾಗಲೂ ಎಚ್ಚರಿಕೆ!

Cabinet approves new Nethravathi river bridge for improved connectivity
Rs 200cr sanctioned for Khader’s dream bridge project
Quote:
Mangaluru: The govt has sanctioned Rs 200 crore for the construction of a bridge between Kotepura in Ullal in Mangaluru constituency and Bolar in Mangaluru City. Considered a dream project of assembly speaker and Mangaluru MLA UT Khader, the new 600m bridge across the Nethravati River by the side of the Arabian Sea will reduce the traffic density on the National Highway-66 stretch from Thokkottu to Mangaluru.
Quote:
Additionally, the cabinet meeting held on Dec 6 also decided to grant administrative approval for the construction of a bridge across the Nethravati River between Sajipanadu and Tumbe villages in Bantwal taluk of Dakshina Kannada district, at an estimated cost of Rs 60 crore, the minister said.
Is there any plan to have a bridge from Bajal (Mangaluru Junction) to GattiKudru so that to build a new road to Konaje?

ಸುರತ್ಕಲ್-ಎಂಆರ್ಪಿಎಲ್ ರೈಲ್ವೆ ಮೇಲ್ಸೇತುವೆ ಕಾಂಕ್ರಿಟೀಕರಣ; ಬದಲಿಮಾರ್ಗ ಸೂಚನೆ

KSRTC: ಮಂಗಳೂರು-ಕಾರ್ಕಳ ಮಾರ್ಗದಲ್ಲಿ ಕೆಎಸ್ಆರ್ಟಿಸಿ ಬಸ್ ಆರಂಭ

Unfinished roadworks in Mangaluru: A growing concern for public safety

Four-laning of Mala Gate - Karkala stretch likely to complete in Feb
Quote:
To another query of the MP regarding the current status of the two-laning work of NH-73 from Ujire to Periyashanthi via Dharmasthala, including the removal of dangerous hairpin curves, the minister informed that the work of widening to two lanes with a paved shoulder has been sanctioned for an amount of Rs 613.6 crore on Jan 9 and the same is in the bidding stage.

On the current status of Mangaluru-Tumakuru NH-73 between Charmadi village and hairpin curve 9 of Charmadi Ghat, the minister informed that the work of widening to two lanes with a paved shoulder from 75km to 86.2km (Charmadi Ghat) has been sanctioned for an amount of Rs 343.7 crore on Jan 19 and awarded to the contractor on Oct 25.

The work of improvement and upgradation of the balance stretch from 86.2km to 99.2km (Charmadi Ghat) of NH-73 has been included in the annual plan 2024-25, he stated.
NHAI swiftly repairs highway after viral video exposes dangerous conditions on Karnataka's Nethravati bridge

Bengaluru-Mangaluru Highway: ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಹೆದ್ದಾರಿ, ಡಿ. 16ರಿಂದ ಮತ್ತೊಂದು ಟೋಲ್

ಬೀದಿ ಬದಿ ವ್ಯಾಪಾರ: ಸವಲತ್ತು ಕಲ್ಪಿಸಲು ಪಾಲಿಕೆ ಮೀನಮೇಷ

Vande Bharat Express: ಗೋವಾ-ಮಂಗಳೂರು ವಂದೇ ಭಾರತ್ ರೈಲು ಕೇರಳ ತನಕ ವಿಸ್ತರಣೆ

ಕಾಂಕ್ರೀಟ್ ರಸ್ತೆಯ ನಡುವೆ ಹಣ್ಣಿನ ಫಸಲು!

Work on widening Thokkottu-Chembugudde stretch of Thokkottu-Mudipu SH begins

MCC installs 1,200 ELCBs on streetlights to prevent deaths due to snapping of overhead power lines

ನಗರದ ಇನ್ನಷ್ಟು ಕಡೆ ಬೀದಿ ಬದಿ ವ್ಯಾಪಾರಸ್ಥರ ವಲಯ: ಮೇಯರ್

ಶಿರಾಡಿಯಲ್ಲಿ ಸುರಂಗ ಮಾರ್ಗ – ಡಿಪಿಆರ್ ತಯಾರಿಸಲು ಕೇಂದ್ರ ಒಪ್ಪಿಗೆ
Quote:
ಕರ್ನಾಟಕ ಸರ್ಕಾರವು ಅಲ್ಪ ಪ್ರಮಾಣದ ಅರಣ್ಯ ಭೂಮಿ ನೀಡಲು ಸಿದ್ಧವಿದ್ದರೆ ಶಿರಾಡಿ ಘಾಟ್ ರಸ್ತೆಯನ್ನು ಅಭಿವೃದ್ಧಿಪಡಿಸಲು ಕೆಲವು ಸಾವಿರ ಕೋಟಿಗಳನ್ನು ಹೂಡಿಕೆ ಮಾಡಲು ತಮ್ಮ ಇಲಾಖೆ ಪರಿಗಣಿಸಲಿದೆ ಎಂದು ಕೇಂದ್ರ ಭೂಸಾರಿಗೆ ಹಾಗೂ ಹೆದ್ದಾರಿ ಸಚಿವ ನಿತಿನ್ ಗಡ್ಕರಿ ಭರವಸೆ ನೀಡಿದ್ದರು.
ಶಿರಾಡಿ ಘಾಟಿ ಸುರಂಗ ಮಾರ್ಗದ ಡಿಪಿಆರ್ಗೆ ಕೇಂದ್ರ ಒಪ್ಪಿಗೆ
Road Project: ಶಿರಾಡಿ ಘಾಟ್ ಸುರಂಗ ಯೋಜನೆಗೆ ಡಿಪಿಆರ್ ರಚಿಸಿ
Quote:
ಹೊಸದಿಲ್ಲಿ: ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿಯಲ್ಲಿರುವ ಶಿರಾಡಿ ಘಾಟ್ನಲ್ಲಿ ಸುರಂಗ ಮಾರ್ಗ ನಿರ್ಮಾಣಕ್ಕೆ ಸಂಬಂಧಿಸಿದಂತೆ ವಿಸ್ತೃತ ಯೋಜನ ವರದಿ (ಡಿಪಿಆರ್) ಸಿದ್ದಪಡಿಸುವಂತೆ ಭಾರತೀಯ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಪ್ರಾಧಿಕಾರ (ಎನ್ಎಚ್ಎಐ)ಕ್ಕೆ ಕೇಂದ್ರ ರಸ್ತೆ ಸಾರಿಗೆ ಸಚಿವಾಲಯ ನಿರ್ದೇಶಿಸಿದೆ. ಅದನ್ನು ಆಧರಿಸಿ ಉದ್ದೇಶಿತ ಯೋಜನ ವೆಚ್ಚ, ಲಭ್ಯವಿರುವ ಮೊತ್ತವನ್ನು ಲೆಕ್ಕಾಚಾರ ಹಾಕಿದ ಬಳಿಕ ಯೋಜನೆ ಕೈಗೆತ್ತಿಕೊಳ್ಳುವುದರ ಬಗ್ಗೆ ನಿರ್ಧರಿಸಲಾಗುತ್ತದೆ ಎಂದು ಸಚಿವಾಲಯದ ಮೂಲಗಳು ತಿಳಿಸಿವೆ.
State cabinet approves Rs 262 crore infrastructure projects for Mangaluru
Two bridges sanctioned for Mangaluru Constituency to ease traffic, boost tourism: UT Khader
Quote:
A major project involves building a new bridge parallel to the Nethravati bridge, connecting Kotepura in Ullal with Bolar in Mangaluru city. Estimated to cost ₹200 crore, the 1.5 km-long bridge will be one of the region’s longest. A detailed project report (DPR) is being prepared by a consultant through the Public Works Department (PWD), Khader informed.
What about GattiKudru-Bajal bridge as a part of Konaje-Manipal Corridor via Mangaluru International Airport (Konaje-GattiKudru-Bajal-MangaluruJunction-MIA-Manipal)? A demand for a shortcut bridge existed since the day of forming Mangaluru University itself but still it is not materialized.

Mangaluru: ನಗರದ 18 ಕಡೆಗಳಲ್ಲಿ ಪೇ ಪಾರ್ಕಿಂಗ್

ಪುತ್ತೂರಿಗೆ ಎರಡನೇ ರಿಂಗ್ ರೋಡ್,ಪುತ್ತೂರಿಗೆ ಬರಲಿದೆ ರಿಂಗ್ ರೋಡ್ ನಗರ ದಟ್ಟಣೆ, ಹೆದ್ದಾರಿ ಒತ್ತಡ ತಗ್ಗಿಸಲು ಮೆಗಾ ಯೋಜನೆ - ring road to come to puttur mega project to reduce city congestion and highway pressure

Cabinet approves 450-metre bridge connecting Sajipa Nadu and Thumbe across Netravathi, says Khader

ಶಿರಾಡಿ ಸಮಸ್ಯೆಗೆ ಸಿಗದ ಮುಕ್ತಿ: ಆಮೆಗತಿಯಲ್ಲಿ ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ

Karnataka High Court directs NHAI to return land 15 years after acquisition in Mangaluru to its owner for not publishing his name in notification

ಮಂಗಳೂರಿನಲ್ಲಿ ಜಲಸಿರಿ ಕಾಮಗಾರಿ ಕಿರಿಕಿರಿ - ನಗರದಲ್ಲಿ ಕೊಳವೆ ಅಳವಡಿಸಲು ಅಲ್ಲಲ್ಲಿ ರಸ್ತೆ ಅಗೆತ

Bengaluru-Mangaluru New Expressway: ಬೆಂಗಳೂರು - ಮಂಗಳೂರಿನ ಈ ಭಾಗದಲ್ಲಿ ಭೂಮಿ ಬೆಲೆ ಭರ್ಜರಿ ಹೆಚ್ಚಳ!
Bengaluru-Mangaluru Expressway: Land Prices Touch New High In Nearby Areas After NHAI’s Construction Proposal For 335-Km Route | Details

Govt mulls issuing free permits for electric autos

Over 10 dangerous junctions on Airport Road

Mangaluru: Underpasses to be built near Kudupu and Mangala Jyothi
Mangaluru: ಕುಡುಪು, ಮಂಗಳಜ್ಯೋತಿ ಬಳಿ ಅಂಡರ್ಪಾಸ್
Quote:
ಮಹಾನಗರ: ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ 169ರ ಬಿಕರ್ನಕಟ್ಟೆ-ಸಾಣೂರು ಚತುಷ್ಪಥ ರಸ್ತೆ ಕಾಮಗಾರಿಯಡಿ ದಕ್ಷಿಣ ಭಾರತದ ಪ್ರಸಿದ್ಧ ನಾಗಾರಾಧನ ಕ್ಷೇತ್ರವಾದ ಕುಡುಪು ದೇವಸ್ಥಾನದ ಮುಂಭಾಗ ಹಾಗೂ ವಾಮಂಜೂರು ಸಮೀಪದ ಮಂಗಳ ಜ್ಯೋತಿ ಬಳಿ ಅಂಡರ್ಪಾಸ್ ನಿರ್ಮಿಸಲು ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಪ್ರಾಧಿಕಾರ ನಿರ್ಧರಿಸಿದೆ. ಚತುಷ್ಪಥ ಕಾಮಗಾರಿ ಹಲವು ಕಡೆಗಳಲ್ಲಿ ನಡೆಯುತ್ತಿದ್ದು, ಕುಡುಪು ಮತ್ತು ಮಂಗಳ ಜ್ಯೋತಿ ಭಾಗದಲ್ಲಿ ರಸ್ತೆ ಯಾವ ಸ್ವರೂಪದಲ್ಲಿರಲಿದೆ ಎಂಬ ಚರ್ಚೆಗೆ ಈಗ ಉತ್ತರ ಸಿಕ್ಕಿದೆ.
Quote:
ಕುಡುಪುನಲ್ಲಿ ಎರಡೂ ಕಡೆ ಸರ್ವಿಸ್ ರಸ್ತೆ
ಕುಡುಪು ದೇಗುಲದ ಮುಂಭಾಗದಲ್ಲಿ ಹೆದ್ದಾರಿಯು ಎತ್ತರವಾಗಿ ನಿರ್ಮಾಣವಾಗುವ ಕಾರಣದಿಂದ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ಕುಡುಪು ದೇವಾಲಯ ಕಡೆಗೆ ಹೋಗಲು ಅಂಡರ್ಪಾಸ್ ಅಗತ್ಯ ಎಂಬುದನ್ನು ಮನಗಂಡು ಈ ಯೋಚನೆ ಮಾಡಲಾಗಿದೆ. ದೇವಸ್ಥಾನದ ಸಮೀಪದ ಹಳೆಯ ಮಾರ್ಗ ಇರುವಲ್ಲಿ ಅಂಡರ್ಪಾಸ್ ನಿರ್ಮಾಣವಾಗಲಿದ್ದು, ಹೆದ್ದಾರಿಯ ಎರಡೂ ಕಡೆಯಲ್ಲಿಯೂ ಸರ್ವಿಸ್ ರಸ್ತೆ ನಿರ್ಮಿಸಲು ಉದ್ದೇಶಿಸಲಾಗಿದೆ. ಅಂಡರ್ಪಾಸ್ ಹಾಗೂ ಸರ್ವಿಸ್ ರಸ್ತೆಯಿಂದ ಸ್ಥಳೀಯ ಕೆಲವು ಒಳರಸ್ತೆಗಳಿಗೆ ಸಂಪರ್ಕ ಕಲ್ಪಿಸಲು ಅನುಕೂಲವಾಗಲಿದೆ.
Contractor hopeful of completing Mangaluru-Bengaluru NH 75 work before monsoon
Quote:
KNR spokesperson told The Hindu that the Central Government is keen on early completion of the project. The contractor is working in full swing to complete the stretch before this monsoon. Only ‘road furniture work’ could remain but the carriageways would be ready for traffic, he said.

The contractor’s Project Manager Raghunatha Reddy told The Hindu, “At least one of the two carriageways would be opened for traffic before the onset of monsoon. ...
Hazardous cable chambers, uneven manholes threaten traffic in Mangaluru

Recognised street vendors urged to start operation from vending zone

Industry body seeks urgent restoration of NH-75 stretch between Maranahalli and Addahole

Iconic kalasha monument to return to Mahaveer Circle

ಕಲ್ಲಡ್ಕ- ಮಾಣಿ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ ಮುಗಿಸಲು ಫೆಬ್ರವರಿ ಡೆಡ್ಲೈನ್!

Mangaluru-Mudigere-Tumkuru NH-73 Expansion at 343.74 Crore

KSRTC To Soon Launch Mangalore-Udupi Electric Bus Route; Will Accommodate 70 People
KSRTC to Launch 10 Electric Buses on Mangaluru-Udupi Route

If Dolly Chaiwala Were A Vendor In Mangaluru...: Actor-Director Raj B Shetty Takes Jibe At Local Administration

KPT Junction ಅಂಡರ್ಪಾಸ್ ಗಳ ಕಾಮಗಾರಿ ಪ್ರಶ್ನಿಸಿದ್ದ ಅರ್ಜಿ ಹೈಕೋರ್ಟ್ನಲ್ಲಿ ವಜಾ
K’taka HC dismisses plea against underpass construction in Mangaluru

MP Brijesh Chowta lays foundation for road project at Kadaba’s Koraga Colony

ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಹೆದ್ದಾರಿ ಶಿರಾಡಿ ಘಾಟ್ ಕಾಮಗಾರಿ ಭಾರೀ ನಿಧಾನ! 16 ವರ್ಷವಾದರೂ ಮುಗಿಯದ ಕಾಮಗಾರಿ

Plants on road dividers drying up!

ಹ್ಯಾಮಿಲ್ಟನ್ ವೃತ್ತ; ತೂಗುಯ್ಯಾಲೆಯಲ್ಲಿ ಹೈಲ್ಯಾಂಡ್ !

ಸ್ಟೇಟ್ಬ್ಯಾಂಕ್ ಬಸ್ ನಿಲ್ದಾಣ ಶೆಲ್ಟರ್ ಕಾಮಗಾರಿ ಆರಂಭ

Iconic ‘Kalasha’ to return to Pumpwell Circle, reviving its past glory

Mangalore Moodbidri highway, illegal stone mining: ಮಂಗಳೂರು– ಮೂಡುಬಿದ್ರೆ ಹೆದ್ದಾರಿಯೇ ಅಧ್ವಾನ ; ನಡು ರಸ್ತೆಯಲ್ಲೇ ಕಲ್ಲಿನ ಕೋರೆ, ಕಾಮಗಾರಿ ಹೆಸರಲ್ಲಿ ಹಗಲು ದರೋಡೆ ! ಅಕ್ರಮದಲ್ಲಿ ಅಧಿಕಾರಿಗಳಿಗೆಷ್ಟು,

Delay in Indrali railway bridge construction, agitators plan protest

B C Road to Periashanthi highway to be motorable by May, says MP Brijesh Chowta
Two lanes on NH-75 between BC Road and Periyashanth to be completed by May: MP
ಮಂಗಳೂರು ಜಿಲ್ಲೆಯಲ್ಲಿ ಮೂಲಸೌಕರ್ಯ,ಬಿ.ಸಿ.ರೋಡ್- ಉಪ್ಪಿನಂಗಡಿ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ ಮಳೆಗಾಲಕ್ಕೂ ಮುನ್ನ ಪೂರ್ತಿ - bc road uppinangadi four lane highway to be ready by june 2025

NH-75 to improve by May with two lanes and a fully concrete surface

Forum to protest, demand closure of tollgate on M’luru-B’luru NH
Two lanes to be completed by May: MP

Work on Mangaluru’s first street dog census begins
Mangalore to manage stray dogs better to prevent tragedies

Minister Dinesh Gundurao inspects Addoor-Polali bridge works

ಉಡುಪಿಯಲ್ಲಿ ಒಬ್ಬ ಪರೋಪಕಾರಿ.. ದಶರಥ ಮಾಂಜಿ ನೆನಪಿಸಿದ 50 ವರ್ಷಗಳ ಈ ಸೇವೆ..!

It seems MGNREGA is only for people who work on paper.

Organisations’ collective holds dharna demanding speedy completion of NH projects in Dakshina Kannada district

ಹೆದ್ದಾರಿ ಸಂತ್ರಸ್ತರಿಗೆ 585 ಕೋಟಿ ರೂ. ವಿತರಣೆ; ಮೂಡುಬಿದಿರೆ ಚತುಷ್ಪಥಕ್ಕೆ ವೇಗ, ಇತ್ಯರ್ಥಗೊಳ್ಳದ ಪದವು ವಿವಾದ
Quote:
ಮಂಗಳೂರಿನ ಬಿಕರ್ನಟ್ಟೆಯಿಂದ ಮೂಡುಬಿದಿರೆ ಮೂಲಕ ಕಾರ್ಕಳದ ಸಾಣೂರು ಗ್ರಾಮ ಸಂಪರ್ಕಿಸುವ ಚತುಷ್ಪಥ ರಸ್ತೆ ನಿರ್ಮಾಣ ಪೂರ್ವದ ಭೂಸ್ವಾಧೀನ ಪ್ರಕ್ರಿಯೆ
ಭೂಸ್ವಾಧೀನ ಪ್ರಕ್ರಿಯೆ ನಡೆಯುತ್ತಿದ್ದು, ಅರ್ಜಿ ಸಲ್ಲಿಸಿದ ಸುಮಾರು 1,534 ಮಂದಿಗೆ 585 ಕೋಟಿ ರೂ. ಪರಿಹಾರ ವಿತರಿಸಲಾಗಿದೆ.
ಎಲ್ಲ 19 ಗ್ರಾಮಗಳ ಭೂಸ್ವಾಧೀನ ಪ್ರಕ್ರಿಯೆ ಅಂತಿಮಗೊಂಡು, 3ಡಿ ಪ್ರಕ್ರಿಯೆ ಮುಗಿಸಿ, ಭಾರತೀಯ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಪ್ರಾಧಿಕಾರದಿಂದ ಒಟ್ಟು 744 ಕೋಟಿ ರೂ. ಪರಿಹಾರ ಬಿಡುಗಡೆ
Quote:
ಪದವು ಗ್ರಾಮ ಬಿಟ್ಟು ಕುಡುಪುವಿನಿಂದ ಸಾಣೂರು ತನಕ ಎಲ್ಲ ಗ್ರಾಮಗಳ ಭೂಸ್ವಾಧೀನ ಪ್ರಕ್ರಿಯೆ ಮುಗಿದಿದೆ. ಆಯಾ ಗ್ರಾಮಕ್ಕೆ ತೆರಳಿ, ಅದಾಲತ್ ನಡೆಸಿ, ಆರ್ಟಿಸಿ, ಇಸಿ ಮತ್ತು ಜಾಗದ ದಾಖಲೆ ತೋರಿಸಿ, ಕಚೇರಿಗೆ ಬಂದು ಸಹಿ ಹಾಕಿದವರಿಗೆ ಭೂಮಿರಾಶಿ ಪೋರ್ಟಲ್ ಮೂಲಕ ನೇರವಾಗಿ ಖಾತೆಗೆ ಪರಿಹಾರದ ಮೊತ್ತ ವರ್ಗಾಯಿಸುತ್ತಿದ್ದೇವೆ.
-ಮೊಹಮ್ಮದ್ ಇಸಾಕ್, ವಿಶೇಷ ಭೂಸ್ವಾಧೀನಾಧಿಕಾರಿ

ಮಂಗಳೂರು-ಕಾರ್ಕಳ ನಡುವಿನ 45 ಕಿ.ಮೀ. ಹೆದ್ದಾರಿ ಅಭಿವೃದ್ಧಿ ಹಲವು ವರ್ಷಗಳ ಬೇಡಿಕೆಯಾಗಿದೆ. 1,137 ಕೋಟಿ ರೂ. ವೆಚ್ಚದಲ್ಲಿ ಚತುಷ್ಪಥಗೊಳಿಸಲು ಭೋಪಾಲ್ನ ಮೆ.ದಿಲೀಪ್ ಬಿಲ್ಡ್ಕಾನ್ ಲಿ. ಗುತ್ತಿಗೆ ಪಡೆದಿದೆ. ಯೋಜನೆಗೆ ಒಟ್ಟು 222.11 ಹೆಕ್ಟೇರ್ ಭೂಮಿ ಅಗತ್ಯವಿದ್ದು, 85.6 ಹೆಕ್ಟೇರ್ ಸರಿಕಾರಿ ಮತ್ತು 29 ಹೆಕ್ಟೇರ್ ಹಿಂದೆ ಇದ್ದ ಹೆದ್ದಾರಿ ಜಮೀನು ಬಳಕೆ ಮಾಡಲಾಗುತ್ತಿದೆ. ಉಳಿದ ಜಮೀನು ಖಾಸಗಿಯವರಿಂದ ಭೂಸ್ವಾಧೀನ ಮಾಡಲಾಗುತ್ತಿದೆ.
Narayana Guru Circle in Mangaluru Falls Into Disrepair, Sparks Public Outcry

Neglected plants along Mangaluru road dividers wither due to lack of care

ಶಿರಾಡಿ ಸುರಂಗ ಮಾರ್ಗ ನಿರ್ಮಾಣಕ್ಕೆ ಡಿಪಿಆರ್ ರೆಡಿ; ಒಟ್ಟು 23.63 ಕಿ.ಮೀ ಉದ್ದ, ಆರು ಕಡೆ ನಿರ್ಮಾಣಕ್ಕೆ ಯೋಜನೆ
Quote:
12.60 ಕಿ.ಮೀ ಉದ್ದದ ಆರು ಸುರಂಗ ಮಾರ್ಗ, 1.5 ಕಿ.ಮೀ ಉದ್ದದ 10 ಸೇತುವೆಗಳನ್ನು ನಿರ್ಮಿಸಲು ಯೋಜನೆ ರೂಪಿಸಲಾಗಿದೆ. ಈ ಮಾರ್ಗದಲ್ಲಿ ದ್ವಿಮುಖ ಮಾರ್ಗದಲ್ಲಿ ವಾಹನಗಳ ಸಂಚಾರಕ್ಕೆ ಅನುವು ಮಾಡುವ ಜತೆಗೆ ತುರ್ತು ಸಂದರ್ಭಕ್ಕಾಗಿ 8.58 ಮೀ. ವಿಸ್ತಾರದ ತುರ್ತು ಮಾರ್ಗವೂ ಯೋಜನೆಯಲ್ಲಿ ಒಳಗೊಂಡಿದೆ. ಶಿರಾಡಿ ಸುರಂಗ ಮಾರ್ಗದ ಕಾಮಗಾರಿಗೆ ಜಪಾನ್ ಇಂಟರ್ ನ್ಯಾಷನಲ್ ಕೋ ಆಪರೇಷನ್ ಏಜೆನ್ಸಿ(ಜೆಐಸಿಎ) ಆರ್ಥಿಕ ನೆರವು ಒದಗಿಸಲಿದೆ.
DPR, shiradi ghat: ಶಿರಾಡಿ ಘಾಟಿಯಲ್ಲಿ ಸುರಂಗ ಹೆದ್ದಾರಿ ; 23 ಕಿಮೀ ಉದ್ದಕ್ಕೆ ಆರು ಕಡೆ ಸುರಂಗ ನಿರ್ಮಾಣ, ಐಐಎಸ್ಸಿ ವರದಿ ಆಧರಿಸಿ ಡಿಪಿಆರ್ ಸಿದ್ಧಪಡಿಸಿದ ಹೆದ್ದಾರಿ ಇಲಾಖೆ
Shiradi Ghat: ಶಿರಾಡಿ ಘಾಟ್ ಸುರಂಗ ಮಾರ್ಗ ಡಿಪಿಆರ್ ಸಿದ್ಧ, ಯೋಜನೆ ವಿವರ

I think haste is to provide connectivity to India–Middle East–Europe Economic Corridor. This may help in faster industrialization of Hassan district. Anyway Mangaluru should focus on Education, Healthcare, IT, R&D, Energy Transition, envirotech, Blue economy technologies & Tourism now.

Street dog population survey completed

Mangaluru ನದಿ-ಕಡಲು ಸಂಗಮದ ಸನಿಹದಲ್ಲೇ ಪ್ರವಾಸಿ ಸೇತುವೆ!
Quote:
ಮಂಗಳೂರು: ನದಿ-ಕಡಲು ಸಂಗಮವಾಗುವ ಅಳಿವೆಬಾಗಿಲುವಿನ ಸನಿಹದಲ್ಲೇ ಬೋಳಾರದಿಂದ ಕೋಟೆಪುರಕ್ಕೆ ಬರೋಬ್ಬರಿ 1,420 ಮೀ. ಉದ್ದದ 200 ಕೋ.ರೂ ವೆಚ್ಚದ ‘ಪ್ರವಾಸಿ ಸ್ನೇಹಿ’ ಸೇತುವೆ ನಿರ್ಮಾಣಕ್ಕೆ ಈಗಾಗಲೇ ಸರಕಾರದ ಅನುಮೋದನೆ ದೊರೆತ ಬೆನ್ನಿಗೆ ಯೋಜನೆ ಅನುಷ್ಠಾನದ ಸಿದ್ಧತೆ ಕಾರ್ಯತಂತ್ರಗಳೂ ಆರಂಭವಾಗಿವೆ.
Quote:
ಹೊಸ ಸೇತುವೆ ನಿರ್ಮಾಣ ಸಂಬಂಧ ಟೊಪೋ ಗ್ರಾಫಿಕಲ್ ಸರ್ವೇ ಪೂರ್ಣವಾಗಿದೆ. ಜಿಯೋಟೆಕ್ನಿಕಲ್ ಇನ್ವೆಸ್ಟಿಗೇಶನ್, ಮೆರೈನ್ ವಾಟರ್ ಮೋನಿಟರಿಂಗ್, ಪರಿಸರ ಪರಿಣಾಮ ಅಧ್ಯಯನ ನಡೆಯುತ್ತಿದೆ. ಸಿಆರ್ಝಡ್ ಅನುಮೋದನೆಗೆ ಪೋರ್ಟಲ್ನಲ್ಲಿ ದಾಖಲಿಸಲಾಗಿದೆ. ಸೇತುವೆಯ ಬಳಿಕ ಬೋಳಾರ ಕಡೆಯಲ್ಲಿ 45 ಮೀ., ಕೋಟೆಪುರ ಕಡೆಯಲ್ಲಿ 75 ಮೀ. ಉದ್ದದಲ್ಲಿ ರಸ್ತೆ ಯೋಜನೆಯೂ ಕೂಡಿದೆ.
Quote:
ಇದು 15ನೇ ರಸ್ತೆ ಸಂಪರ್ಕ ಸೇತುವೆ !
– ರಸ್ತೆ ಸಂಪರ್ಕದ ದೃಷ್ಟಿಯಿಂದ ಉಪ್ಪಿನಂಗಡಿ ಭಾಗದಿಂದ ಮಂಗಳೂರುವರೆಗೆ ನೇತ್ರಾವತಿ ನದಿ (ಕುಮಾರಧಾರಾ ಸೇರಿ)ಗೆ 13 ಸೇತುವೆ ಇದೆ. ಹೊಸದಾಗಿ ತುಂಬೆ-ಸಜೀಪನಡು ಹಾಗೂ ಬೋಳಾರ-ಕೋಟೆಪುರ ಸೇತುವೆ ನಿರ್ಮಾಣಕ್ಕೆ ಅನುಮೋದನೆ ದೊರೆತಿದೆ.
– ಉಪ್ಪಿನಂಗಡಿಯಲ್ಲಿ ಕುಮಾರಧಾರಾ ನದಿಗೆ 3 ಸೇತುವೆಗಳು. ನೇತ್ರಾವತಿ ನದಿಗೆ 1 ಸೇತುವೆ.
– ಬಿಳಿಯೂರಿನಲ್ಲಿ 1 ಬ್ರಿಡ್ಜ್ ಕಂ ಬ್ಯಾರೇಜ್.
– ಅಜಿಲಮೊಗರು-ಕಡೇಶ್ವಾಲ್ಯ ಮಧ್ಯೆ ಸೇತುವೆ ನಿರ್ಮಾಣ ಹಂತದಲ್ಲಿದೆ.
– ಜಕ್ರಿಬೆಟ್ಟು-ನರಿಕೊಂಬು ಮಧ್ಯೆ ಬ್ರಿಡ್ಜ್ ಕಂ ಬ್ಯಾರೇಜ್ ನಿರ್ಮಾಣ ಹಂತದಲ್ಲಿದೆ.
– ಪಾಣೆಮಂಗಳೂರಿನಲ್ಲಿ 3 ಸೇತುವೆಗಳಿವೆ.
– ಅಡ್ಯಾರ್-ಹರೇಕಳ ಮಧ್ಯೆ ಬ್ರಿಡ್ಜ್ ಕಂ ಬ್ಯಾರೇಜ್.
– ಜಪ್ಪಿನಮೊಗರುವಿನಲ್ಲಿ 2 ಸೇತುವೆಗಳಿವೆ.
Quote:
ಸೇತುವೆಯಲ್ಲೇ ‘ಟೂರಿಸ್ಟ್ ಪಾಯಿಂಟ್’!
ಬೋಳಾರ ಭಾಗದಿಂದ ನದಿ-ಕಡಲು ಸೇರುವ ಅಳಿವೆಬಾಗಿಲು ಕಡೆಗೆ ನೋಡಿದಾಗ ನದಿ ಹಾಗೂ ಸಮುದ್ರ ಸೇರುವ ಮನಮೋಹಕ ದೃಶ್ಯ ಕಾಣುತ್ತದೆ. ಇದನ್ನು ಪ್ರವಾಸಿಗರಿಗೆ ಮತ್ತಷ್ಟು ಆಕರ್ಷಣೀಯ ಮಾಡಲು ಹೊಸ ಸೇತುವೆಯನ್ನು ಪ್ರವಾಸಿ ನೆಲೆಯಿಂದ ರೂಪಿಸಲು ಉದ್ದೇಶಿಸಲಾಗಿದೆ. ಇದಕ್ಕಾಗಿ ಹೊಸ ಸೇತುವೆಯಲ್ಲಿ ‘ಟೂರಿಸ್ಟ್ ವ್ಯೂ ಪಾಯಿಂಟ್’ಗಳನ್ನು ಸೇತುವೆಯ ಅಲ್ಲಲ್ಲಿ ಮಾಡಲಾಗುತ್ತದೆ. ನದಿ-ಸಮುದ್ರ ಸಂಗಮ ಜಾಗವನ್ನು ಕಣ್ತುಂಬಿಕೊಳ್ಳಲು ಇದರಿಂದ ಅವಕಾಶ ಸಿಗಲಿದೆ.
PWD proposes to build five helipads in DK, says Satish Jarkiholi
Quote:
Referring to an allegation by Harish Poonja, Belthangady MLA, that a construction agency was delaying the Charmadi Ghat widening project, the Minister said that it will be discussed in the meeting of officials in Bengaluru on Friday.
Quote:
An official from the national highways division of PWD said the construction agency was presently doing a survey of the project. The agency bagged the contract by quoting ₹180 crore, which was 40% below the estimated project cost.

In the Friday meeting, the Minister said he will discuss with NHAI officials about the proposed tunnelling project on Shiradi Ghat and progress of the ongoing Adda Hole- B.C. Road four-lane project.
Mangaluru Planning to generate revenue from PWD properties, says Minister Satish Jarkiholi
Quote:
Brijesh Chowta urged officials to expedite the preparation of Detailed Project Reports (DPRs) for key road development works, including the Shiradi Ghat highway upgrade and the construction of an outer ring road for Mangaluru city.
Quote:
Participated in the progress review meeting of Public Works Department chaired by Karnataka PWD Minister Shri Satish Jarakiholi @JarkiholiSatish last evening.

Urged him to facilitate a
• New spur road connecting NH 75 passing through Kukke Subrahmanya to NH 275,
• ⁠An outer ring road (Ring Road) for Mangalore to decongest the bottle necks at city’s entry points

Also sought his special attention towards
• Shiradi Ghat DPR and necessary clearances from the Forest Department
• DPR for Mani-Sampaje widening at the earliest.
~CaptBrijesh

MP urges PWD minister to expedite preparation of DPR for development of Shiradi Ghat Highway
MP urges PWD minister to expedite preparation of DPR for development of Shiradi Ghat Highway
Quote:
The DPR for the development of the Shiradi Ghat highway, which falls within the Western Ghats, is still pending. ...
Public works min must provide DPR for outer ring road (ORR): MP
Quote:
He said Mangaluru is the second largest city in Karnataka and holds strategic importance as the only city in the state with three modes of transport. It is home to several industries contributing to rapid urban growth and a steadily increasing population. Due to the city's coastal location, expansion is limited on the seaward side, placing immense pressure on inland areas for urban development, he said.
The MP also proposed the construction of a spur road connecting NH-75 and NH-275 (Periyashanthi to Paichar), linking Karnataka and Kerala. This will enhance connectivity for lakhs of devotees visiting Shri Kshetra Subrahmanya temple. The MP also requested expediting the DPR preparation for widening NH-275 from Mani to Sampaje.
Which one is outer ring road (ORR)? Is there any inner ring road (INR)? Mangala Corncihe? And then Thokkottu-BC Road-Mulki road is ORR?

Bengaluru-Mangaluru Travel Time to Be Reduced by 7-8 Hours with New Expressway
Quote:
Project Timeline and Development Plans

In July, the ministry sought bids to select a consultant for a detailed project report (DPR). By November, nine firms had submitted their technical bids. The government plans to award the contract next year, with the selected firm given 540 days to complete the DPR. The construction of the expressway is slated to begin by 2028. The project will be a collaborative effort between Karnataka’s Public Works Department (PWD) and the National Highways Authority of India (NHAI), focusing on alignment and land acquisition.
Reduce by 7-8 hours means what? Travel back in time?

Buses currently take about 9 hours. Cars about 7 hours. Google says 7 hr 53 min (394.0 km) via NH 275.

New Bengaluru-Mangaluru Expressway to reduce travel time by 7-8 hours; set to open...
Quote:
is expected that the proposed expressway, which would be roughly 335 km long, will cut the travel time between Bengaluru and Mangaluru by 7-8 hours, revolutionising state transportation. At the moment, travelling between these two cities might take a long time, particularly during the monsoon season when the current route is prone to landslides and other disruptions.
Expressway: ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಎಕ್ಸ್ಪ್ರೆಸ್ವೇನಿಂದ ಆಸ್ತಿ ದರ ಏರಿಕೆ ಸೇರಿ ಏನೆಲ್ಲಾ ಪ್ರಯೋಜನಗಳಿವೆ?
Quote:
ಇದೀಗ ಎರಡು ನಗರಗಳ ನಡುವಿನ ಪ್ರಯಾಣದ ಸಮಯ ಹೆಚ್ಚಿದೆ. ಅದರಲ್ಲೂ ಮಳೆಗಾಲದಲ್ಲಿ ಈ ಮಾರ್ಗವು ಭೂಕುಸಿತ ಮತ್ತು ಇತರ ಅಡಚಣೆಗಳಿಗೆ ಒಳಗಾಗುತ್ತಿದೆ. ಎಕ್ಸ್ಪ್ರೆಸ್ ನಿರ್ಮಾಣವಾದ್ರೆ ಈ ಎಲ್ಲಾ ಸಮಸ್ಯೆಗಳು ಬಗೆಹರಿಯುವುದರಲ್ಲಿ ಯಾವುದೇ ಅನುಮಾನವಿಲ್ಲ.
Okay. Currently there are problems due to landslide & other hindrances. Hence there is increase in travel time. But what is the guarantee that these issues will not be there in new express way? If they have a solution to these issues then why can't implement it in NH-75 also?

Quote:
ಎಕ್ಸ್ಪ್ರೆಸ್ವೇ ನಿರ್ಮಾಣವು 2028 ರ ವೇಳೆಗೆ ಪ್ರಾರಂಭ ಆಗಲಿದೆ.
What will NHAI do till 2028? Keep quiet? Why not they find solutions to NH-75 issues?

By the way Shiradi ghat tunnel is part of NH-75 or new express way or both?

Earlier there used to be a few Mangaluru news in Malayalam news papers. Now even Hindi, Telugu everywhere there.

New expressway: బెంగళూరు- మంగళూరు మధ్య తగ్గనున్న ప్రయాణ దూరం

Bengaluru - Mangaluru Expressway : ಭೂಸ್ವಾಧೀನ ಪೂರ್ಣ, 9 ಕಂಪೆನಿಗಳಿಂದ ಡಿಪಿಆರ್ ಸಲ್ಲಿಕೆ - 2028ಕ್ಕೆ ಕಾಮಗಾರಿ ಆರಂಭ?
Quote:
ಸದ್ಯದ ಭೂಹೆದ್ದಾರಿ ಇಲಾಖೆಯ ಯೋಜನೆಯ ಪ್ರಕಾರ 2028ರಲ್ಲಿ ಕಾಮಗಾರಿ ಆರಂಭಿಸಿ 2 ಅಥವಾ 3 ವರ್ಷಗಳಲ್ಲಿ ಸಂಚಾರಕ್ಕೆ ಮುಕ್ತಗೊಳಿಸುವುದು. ಮಾಹಿತಿಗಳ ಪ್ರಕಾರ, ಭೂಸ್ವಾಧೀನ ಪ್ರಕ್ರಿಯೆ ಪೂರ್ಣಗೊಂಡಿದೆ.
I have a doubt on the claim that land acquisition is complete. Can they complete land acquisition before DPR?

Quote:
Pleased to share that the Govt of Karnataka has responded to our request seeking the preparation of a DPR for widening of NH-275 to four lane with paved shoulder from Km.0.00 (Mani) to Km. 71.60 (Sampaje) which is the Mani-Mysore-Bengaluru section.

The state has also agreed, as stated in the letter below, to pay the estimated cost of the above work, Rs. 3.1948 crore and GST amount under Agency Charges.
~CaptBrijesh

Karnataka govt approves DPR preparation for four-laning of Mani-Sampaje highway
Quote:
... PWD has approved the appointment of consultants for preparing the DPR for widening the 71.60- km stretch from Mani to Sampaje. Additionally, an order has been issued approving the allocation of Rs 3.19 crore to be borne as agency costs. With this, the tender process for selecting an agency to prepare the DPR will begin soon, paving the way for the four-lane expansion of the Mani-Sampaje highway.
PWD approves four-laning NH-275 highway: MP
State govt approves DPR for Mani-Sampaje four-lane highway: Capt Brijesh Chowta

Survey begins for redesign of Hamilton and Ambedkar Circles

MCC Budget for 2025-26 proposes to build a multi-level car parking (MLCP) outside the Kadri Manjunatha temple

ಶ್ರೀನಿವಾಸ ಮಲ್ಯರ ಪ್ರತಿಮೆ ಪದುವಾ ಬಳಿಯೇ ಮರು ಸ್ಥಾಪನೆ

I wonder whether they explored possibility of rebuilding Kalasha of Pumpwell at Padil Junction also.

ಚತುಷ್ಪಥ ಹೆದ್ದಾರಿ ರಸ್ತೆ ಕಾಮಗಾರಿ ಮುಗಿಸುವ ಡೆಡ್ಲೈನ್ : 45 ದಿನ ಶಿರಾಡಿ ಘಾಟ್ ಬಂದ್?
MP assures smooth commute on Hassan-Mangaluru national highway soon
Quote:
We have emphasized on preventing landslides in some places, especially during the rainy season, including the big mistake. Due to the unscientific actions and mistakes of those who acquired land in the past, the hills were cut directly, which has led to landslides in some places. To prevent this, more land needs to be acquired to cut the hills in a sloping manner. Before that, compensation needs to be given to the coffee plants and trees. He said that he has instructed to immediately take action and prepare a report on how many meters of land are needed.
So, NH-75 travel time will be restored back to 7 hrs soon.

Punjalakatte-Charmadi NH 73 stretch to be kept motorable before the onset of Monsoon: NH-PWD

Four-laning of Vamanjoor-Sanoor stretch of Mangaluru-Solapur NH 169 to get completed by May, NHAI

Kalladka flyover on NH-75 to be ready by April: NHAI
Quote:
... About 73% of the work from Periyashanthi to BC Road is completed, and the rest will over by June. ... Work on approach roads to the flyover and service roads in Kalladka town is in progress, he explained.

The project director said that work on service roads at Mulki-Bappanadu, Padupanambur, Beeri, and Haleyangadi on NH-66 will be taken up after monsoon. The work on the six-lane bridge at Kuloor is in progress, and may be completed by Jan 2026, he added.
NHAI to build service roads at 4 points on Mulky-Talpady Highway after MP's intervention
Quote:
Javed also shared optimistic progress on other ongoing projects, revealing that 95.4% of work has been completed between Addahole and Periashanthi, and 75% of work is completed from B C Road to Periashanthi. ...
Quote:
Adding to the good news for commuters, Mangaluru City Corporation (MCC) officials announced that construction of a service road from Pumpwell to Gorigudda will begin next week, at an estimated cost of Rs 4 crore, aimed at easing traffic flow in this densely populated area.
Quote:
... MP Capt Brijesh Chowta also directed KSRTC officials to look into launching a bus service from Nettana to Subramanya Kshetra, a move that could provide better connectivity to the pilgrimage town following the extension of the Mangaluru Central to Kabaka Puttur train service to Subramanya Road.
How can an MP direct KSRTC officials? Protocol violation! The district-in-charge minister should issue a fresh direction.

Improving Road Infrastructure Around New Mangalore Port: A Crucial Step for Regional Growth, Says MP Captain Brijesh Chowta
Quote:
Captain Chowta commented on the announcement: “This reaffirms our commitment to improving road infrastructure and ensuring the safety of commuters in Dakshina Kannada. With enhanced service roads, pedestrian-friendly infrastructure, and improved connectivity to New Mangalore Port, this project will substantially bolster trade, transportation, and tourism prospects in our region.”
Quote:
The approved projects include the construction of service roads at multiple pivotal locations, designed to facilitate smoother and safer vehicular movement. The locations earmarked for construction services include the following:
  • Mulky: 500 meters (both sides) from Km 348+660 to Km 349+160
  • Padupanambur: 310 meters (both sides) from Km 353+690 to Km 354+000
  • Haleyangadi Village: 550 meters (both sides) from Km 354+700 to Km 355+250
  • Beeri: 700 meters (both sides) from Km 12+000 to Km 12+700
Mp Brijesh Chowta, Highway: 26 ಕೋಟಿ ವೆಚ್ಚದಲ್ಲಿ ಸುರತ್ಕಲ್ - ಬಿ.ಸಿ ರೋಡ್ ಹೆದ್ದಾರಿಗೆ ಕಾಯಕಲ್ಪ ; ಮುಲ್ಕಿ, ಬೀರಿ ಸೇರಿ 4 ಕಡೆ ಸರ್ವಿಸ್ ರಸ್ತೆಗೆ ಟೆಂಡರ್, ಮುಕ್ಕ, ಎಕ್ಕೂರಿನಲ್ಲಿ ಮೇಲ್ಸೇತುವೆ

ಶಿರಾಡಿ ಘಾಟ್ ಹೆದ್ದಾರಿಯಲ್ಲಿ ಚತುಷ್ಪಥ ಕಾಮಗಾರಿ ; ಮಾ.15ರಿಂದ ಮತ್ತೆ ವಾಹನ ಸಂಚಾರ ನಿಷೇಧ ಸಾಧ್ಯತೆ, ಜೂನ್ 30ರೊಳಗೆ ಕಾಮಗಾರಿ ಮುಗಿಸಲು ಟಾಸ್ಕ್

MCC awaits NITK report to proceed with Ambedkar Circle development in Mangaluru

Two foot over bridges (Muuka & Yekkur) sanctioned on NH 66: Dakshina Kannada MP Capt Brijesh Chowta
NHAI to build FOBs at Yekkur, Mukka on NH-66, overlay Surathkal-Padil stretch

Tenders issued for highway maintenance to enhance New Mangalore Port connectivity

MCC launches special drive to remove illegal flex banners

Are they going to act against agencies who have put those banners? What is the use of just removing banners without registering cases? What about footpath boards which are also blocking footpaths? Coils of TV Cables are also creating enough troubles to pedestrians.

NH-PWD pledges to make Punjalakatte-Charmadi stretch motorable

Ambedkar Circle Development Awaits NITK’s Technical Report

Bengaluru-Mangaluru Expressway: How This Infrastructure Project Will Impact Real Estate

When did Bantwal, Sakleshpur & Kunigal became districts?

City road to be named after warrior queen Rani Abbakka

Whether proposed Bolar-Ullal bridge will also be named as Rani Abbakka bridge?

Puttur: ನೆಕ್ಕಿಲಾಡಿ ಮೇಲ್ಸೇತುವೆಯಲ್ಲಿ ಸಂಚಾರ ಆರಂಭ

ಅನಧಿಕೃತ ಫ್ಲೆಕ್ಸ್ , ಬ್ಯಾನರ್ಗಳ ಅಬ್ಬರ: ಆಡಳಿತ ಮೌನ
Illegal flex banners continue to flood city, administration remains silent

ಪಾಲಿಕೆ ಎದುರೇ ಫ್ಲೆಕ್ಸ್ ಹಾಕಿದರೂ ಮೌನ!

Puttur: ನಗರವಷ್ಟೇ ಅಲ್ಲ, ಊರೂರಲ್ಲೂ ಫ್ಲೆಕ್ಸ್ ! | Udayavani – ಉದಯವಾಣಿ

Trust urges task force to check illegal hoardings

Any idea which agencies are putting up these banners? These agencies are threat to our ambition to grow as tourism & IT hub. What is the way to pull them to court & punish? Do you have any evidence that officials & corporators have recevived bribes from these agencies & hence not acting?

ಸಿಟಿ ಬಸ್ಗಳಲ್ಲಿ ಟಿಕೆಟ್ ನೀಡದಿದ್ದರೆ ದಂಡ: ಸಾರಿಗೆ ಇಲಾಖೆ

Puttur gets 2nd sensor-based RTO driving test track

ಕ್ಲಾಕ್ಟವರ್ ಲೂಪ್ ರಸ್ತೆಯಲ್ಲಿ ಮತ್ತೆ ಸಂಚಾರ ಸಮೀಕ್ಷೆ!

Udupi: Illegal flex banners flood city, rules ignored

MCC issues directive to immediately remove unauthorised flex banners

Whey are going to take legal action on the agencies?

State Budget: ಮಂಗಳೂರಿನ ನೇತ್ರಾವತಿ ಸಹಿತ 39 ಸೇತುವೆ ದುರಸ್ತಿಗೆ 1,000 ಕೋ.ರೂ

Which Netravati Bridge? Generally Netravati Bridge means NH-66 one. Has NHAI handed over maintenance of this bridge to the state?

Property Price: ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಎಕ್ಸ್ಪ್ರೆಸ್ವೇನಿಂದ ಯಾವೆಲ್ಲಾ ಜಿಲ್ಲೆಗಳಲ್ಲಿ ಭೂಮಿ ಬೆಲೆ ಏರಿಕೆ?
Quote:
ಪ್ರಯಾಣದ ಸಮಯ ಕಡಿತ: ಪ್ರಸ್ತುತ ಇದೀಗ ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ನಡುವೆ ಪ್ರಯಾಣ ಮಾಎಲು ಸುಮಾರು 7ರಿಂದ 8 ಗಂಟೆಗಳು ಬೇಕಾಗುತ್ತದೆ. ಇದರ ದೂರ 416 ಕಿಲೋ ಮೀಟರ್ ಇದ್ದು, ಹೊಸ ಎಕ್ಸ್ಪ್ರೆಸ್ವೇ ನಿರ್ಮಾಣದಿಂದ ದೂರವು 335 ಕಿಲೋ ಮೀಟರ್ಗೆ ಇಳಿಕೆಯಾಗಲಿದೆ ಮತ್ತು ಪ್ರಯಾಣದ ಸಮಯ ಕೇವಲ 3ರಿಂದ 4 ಗಂಟೆಗಳವರೆಗೆ ಕಡಿಮೆಯಾಗಲಿದೆ. ಇದರಿಂದ ಸಾರಿಗೆ ಸಂಪರ್ಕದಲ್ಲಿ ದಡ್ಡ ಅಭಿವೃದ್ಧಿಯಾದಂತಾಗಲಿದೆ.
Okay. Now we are clear on time requirement. But when did 350 km (google says 349.4 km via NH75) distance became 416 km?

Mangaluru City Corporation cracks down on illegal flexes and banners
ಫ್ಲೆಕ್ಸ್ ಹಾವಳಿ ನಿಯಂತ್ರಣಕ್ಕೆ ಕ್ರಮ; ಅಧಿಕಾರಿಗಳಿಗೆ ಜಿಲ್ಲಾಡಳಿತ ಸೂಚನೆ

ಇಂದಿನಿಂದ ಅದ್ಯಪಾಡಿಗೆ ಕೆಎಸ್ಸಾರ್ಟಿಸಿ ಬಸ್

ಸ್ಟೇಟ್ಬ್ಯಾಂಕ್; ಫುಟ್ಪಾತ್ ಅವ್ಯವಸ್ಥೆ

ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ಹೆದ್ದಾರಿ ಪ್ರಯಾಣಿಕರ ಗಮನಕ್ಕೆ: ಶಿರಾಡಿಯಲ್ಲಿ ಏಕಮುಖ ಸಂಚಾರ! ಯಾವಾಗಿಂದ, ಯಾವ ಮಾರ್ಗದಲ್ಲಿ? ಇಲ್ಲಿದೆ ಮಾಹಿತಿ..

Karnataka govt to seek centre’s nod for Gundya-Sakleshpur tunnel construction on NH-75 to ease Mangaluru-Bengaluru travel

Shiradi Ghat Bypass and Mangaluru-Bengaluru Highway Upgrade: MP Seeks Urgent Action
DK MP urges Union Minister to address Bengaluru-Mangaluru road connectivity problem
Shiradi Ghat, Mangalore Bengalore, Mp Brijesh Chowta: ಶಿರಾಡಿ ಘಾಟಿ, ಮಂಗಳೂರು -ಬೆಂಗಳೂರು ಕಾರಿಡಾರ್ ಯೋಜನೆ ಅನುಷ್ಠಾನಕ್ಕೆ ರಾಜ್ಯ ಸರ್ಕಾರದಿಂದ ಅಡ್ಡಿ ; ತುರ್ತು ಮಧ್ಯ ಪ್ರವೇಶಕ್ಕೆ ಹೆದ್ದಾರಿ ಸಚಿವ
Shiradi Ghat Highway: ಶಿರಾಡಿ ಘಾಟಿ ಹೆದ್ದಾರಿ ವಿಸ್ತರಣೆ ಕುರಿತು ಅಪ್ಡೇಟ್
Quote:
ಶಿರಾಡಿ ಘಾಟಿಯಲ್ಲಿ ಬಹುಪಥಗಳ ರಸ್ತೆ ನಿರ್ಮಾಣಕ್ಕೆ ಅರಣ್ಯ ಇಲಾಖೆಯ ಅನುಮತಿ ನೀಡುವ ಪ್ರಕ್ರಿಯೆ ಆಮೆಗತಿಯಲ್ಲಿ ಸಾಗಿರುವ ಹಿನ್ನೆಲೆ ಯೋಜನೆ ಅನುಷ್ಠಾನಕ್ಕೆ ಹಿನ್ನಡೆ ಆಗಿದೆ. ಅದರಲ್ಲೂ ಪ್ರಮುಖವಾಗಿ ಕರ್ನಾಟಕ ಸರ್ಕಾರದಿಂದ ಅರಣ್ಯ ಇಲಾಖೆಯ ಅನುಮತಿ ಬಾಕಿಯಿರುವ ಕಾರಣ ಈ ಯೋಜನೆ ಕಾರ್ಯರೂಪಕ್ಕೆ ತರುವುದಕ್ಕೆ ವಿಳಬವಾಗುತ್ತಿದೆ. ಆದ್ದರಿಂದ ಶಿರಾಡಿ ಘಾಟಿ ರಸ್ತೆ ವಿಸ್ತರಣೆಗೆ ರಾಜ್ಯ ಸರ್ಕಾರದ ಕಡೆಯಿಂದ ಎದುರಾಗಿರುವ ಅಡೆ-ತಡೆ ನಿವಾರಣೆಗೆ ಹೆದ್ಧಾರಿ ಸಚಿವಾಲಯದ ಕಡೆಯಿಂದ ಮಧ್ಯಸ್ಥಿಕೆ ವಹಿಸಬೇಕೆಂದು ಮನವಿ ಮಾಡಿದರು.
Road works on, but traffic movement continues on Bengaluru-Mangaluru Highway

M’luru-Bahrain route to get two weekly direct flights this summer schedule

No more plastic flex banners allowed in the city
MCC declares war on plastic flex banners, strict action from Mar 15
Mangaluru No more plastic flex banners allowed in the city

ತಪ್ಪು ಸರಿಪಡಿಸಿ ಪರ್ಕಳ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ ತಕ್ಷಣ ಆರಂಭಿಸಿ: ಸಂಸದ ಕೋಟ ಸೂಚನೆ

Last edited by BolliBatlu; Mar 15, 2025 at 4:09 AM.
Reply With Quote
     
     
  #743  
Old Posted Feb 26, 2025, 4:18 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Interlog Services, Inland Avenue, MG Road, Balal Baugh

Reply With Quote
     
     
  #744  
Old Posted Feb 26, 2025, 8:55 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Water Transportation

ಲಕ್ಷದ್ವೀಪದಿಂದ ಮಂಗಳೂರಿಗೆ ಬಂದ “ಚೆರಿಯಪಾನಿ’
Quote:
ಸಾಮಾನ್ಯವಾಗಿ ಲಕ್ಷದ್ವೀಪ-ಕೊಚ್ಚಿ ಮಧ್ಯೆ ಹಡಗುಗಳು ಸಂಚರಿಸುತ್ತಿದ್ದು, ಮಂಗಳೂರಿಗೆ ದೂರ ಕಡಿಮೆಯಿದ್ದರೂ ಈ ಕಡೆಗೆ ಬರುವುದು ಕಡಿಮೆ. ಆದರೆ ಲಕ್ಷದ್ವೀಪದ ಜನರು ವೈದ್ಯಕೀಯ, ಶಿಕ್ಷಣ, ಉದ್ಯೋಗ ಮತ್ತಿತರ ಅಗತ್ಯಗಳಿಗೆ ಮಂಗಳೂರನ್ನು ಹೆಚ್ಚು ನೆಚ್ಚಿಕೊಂಡಿದ್ದಾರೆ. ಪ್ರಸ್ತುತ ಲಕ್ಷದ್ವೀಪ ಸಂಸದ ಹಮುಲ್ಲಾ ಸಯೀದ್ ಅವರೂ ಮಂಗಳೂರಿಗೆ ಹೆಚ್ಚು ಸುವ್ಯವಸ್ಥಿತ ಸಂಪರ್ಕ ಬೆಸೆಯುವ ಯೋಜನೆ ಯಲ್ಲಿರುವುದಾಗಿ ತಿಳಿದುಬಂದಿದೆ.
Karnataka Maritime Board proposes to build international cruise and tourism port in Mangaluru
Quote:
The project is also being explored for assistance from Sagarmala scheme of the Union government, he said adding that global tender will be invited to take up the project under the public-private partnership (PPP) model.
Quote:
Maritime museum

The CEO said that the board will construct Karnataka Maritime Museum in Mangaluru on 1.5 acres of land near Hoigebazar Light House under the PPP model.

The civil works of the project is estimated to cost ₹6.7 crore. The collation and management will be done by a private party. The museum will also have a restaurant. Once ready, the museum can be kept open from 9 a.m. to 10 p.m.
Quote:
Mr. Raipura said that Mangaluru (Netravathi river) is among four locations in Karnataka identified for taking up waterdrome project.
Quote:
Mr. Raipura said that the 10th meeting of Karnataka Maritime Board has approved Mangaluru water metro project which is expected to cost ₹180 crore.
Water transport initiatives
Quote:
... The Water Metro will include 17 jetties, 10 boats, and 20 buses for last-mile connectivity. The operations and maintenance will be by a private entity, enhancing services for shore-to-shore transportation, daily commuting, tourism, and regional development.

In its second phase, the project will link Swarna, Netravathi, and Gurpura rivers, further strengthening coastal connectivity. KMB is also working towards a dedicated Lakshadweep jetty in Mangaluru.

Further, to position Mangaluru as a hub for international cruise tourism, KMB proposed to develop an international cruise terminal in Someshwara, with an 18m draft. The pre-feasibility report has been prepared. Based on the recommendations as given in the PFR, necessary technical studies shall shortly be undertaken for preperation of DPR. The estimated project cost is Rs 3,400 crore, said CEO Jayaram Raipura.
Mangaluru MLA had talked about container berth for clean cargo also along with cruise & tourism.

Quote:
Originally Posted by BolliBatlu View Post
Karnataka plans island development to boost tourism and jobs under New Maritime Policy
Quote:
The state has identified 13 locations for maritime infrastructure development, including Karwar, Belekeri, Malpe, Padubidri, and Old Mangalore Port. ...
Why is Ullal cruise port project not mentioned. Along with container terminal this can have LNG terminal also. What will be developed in Padubidri?
Which would be the ideal location for LNG terminal as setting up it in NMPT has been found non-feasible? Padubidri in Udupi as it is expected to undergo rapid industrialization compared to Ullal?

If Karnataka develops feeder corridor to IMEC through Mangaluru then developing container terminals at both Ullal & Padubidri may be useful.

By the way, Jindal has got container terminal at NMPT. Hence Adani may show more interest in Padubidri port development if planned. Padubidri has also about 600-700 acres readily available land may be reserved for Green Hydrogen projects.

Whither M’luru water metro?
Quote:
Mangaluru water metro: A public transport solution or a misguided plan?
If they develop tourism attractions before commencing water metro then it will definitely survive. Though a few waterfront resorts & apartments are coming up now we require more for better performance of water metro. Question is whether water metro is first or tourism, sports & recreational facilities first. If the government is able to run watermetro for a few years without worrying about profit then definitely tourism infrastructures will also happen. In the beginning itself if the government asks private companies to run catamaran boats then there is an issue.

If rail metro can save travel time then even water metro can.

Last mile connectivity issue is even faced by rail metro (MRT). For proper last mile connectivity, bus timings have to coincide with watermetro timings. Just 20 buses may not be enough. All bus routes ending in nearby busstops have to be extended upto water metro stations on both sides of the rivers. For example, a few buses from State Bank bus stop have to run up to old port. This will help passengers from important locations like Jyothi, Hampankatta move to old port & catch water metro. Similarly a few of Mangaladevi buses can be extended to Bolar sea face or Hoige Bazar or both.

How many tourism & recreational facilities are planned now? What are the tourism & recreational facilities available at walkable distance from each water metro station? Let us hope that maritime museum planned at Hoigebazar Light House is at a walkable distance from water metro station planned there. As part of waterfront development I think a few urban plazas are also planned. The urban plazas can also be used for musical & theatrical performaces (like amphitheatres), art exhibitions etc. Other things are as mentioned below.

Quote:
The project intends to develop waterfront as an active recreational and commercial area with waterfront gardens, parks, pedestrian-friendly walkways, bicycle track, board walks, nature park, adventure sports etc. Overall vision also aims to create a working waterfront with modernizing the existing fishing harbor and retrofitting the old port area with tourism activities.
Mangaluru Smart City Limited - Waterfront Development
Quote:
Promenade development is one of the key features of the project. It includes setting up a biodiversity park and creation of a bird-watching area near the Netravati railway bridge, building a pathway of 6 m width for a stretch of 2.1 km and laying a cycle track of 3 m width from the bridge to Bolar sea face. The other facilities to be created include establishing an outdoor gym, creating a cycle stand and a buggy point for the introduction of buggies, setting up of play area for children, a pet park, and developing a park with seating arrangements and landscaping.

In addition, there will be a ghat to enable the visitors to touch the water. A boardwalk facility will be created inside the waters at the South Point. It will have a boat making experience yard. The entry and exit plaza will be built near the Netravati bridge. There will be decks, kiosks for shops, ticket counter, security, washrooms, and other public amenities. A sewage treatment plant too will be constructed. The treated water will be used for watering parks and gardens.
Waterfront development project under Mangaluru Smart City Mission takes a leap

Mangaluru should have a warship museum. Now we have a military man to do this! At least should have a war tank or a artillery weapon or a warplane or a war helicopter on a river shore!

By the way, how many heritage temples are there on river shores of water metro?

Anyone is planning for Waterfront Mall?

Is there a plan for Waterfront Yaksha Bhavana (we have problem of Rangamandira itself)? Waterfront Kambla field?

Why not MCC/MUDA request public to suggest the waterfront tourism facilities they would like to have?

Quote:
Originally Posted by BolliBatlu View Post
Could Water Metro Corridor be developed as an IT corridor along with tourism?
By the way how much easy it will be to walk on new Bolar-Kotepura bridge from Bolar or Ullal (Kotepura) to reach Tourist View Point for watching estuary sunset? What is the width of pedestrian way on the bridge?

Which type of connectivity is planned for kudrus or river islets? Just small boats?

Here are a few links on waterfront promenades.

Top 10 things to do in Seaside Waterfront Promenade
Discover the Serenity of Marina Bay Waterfront Promenade
Singapore Waterfront Walking Tour | Marina Bay Promenade | Singapore Must Visit place | Merlion
Sabarmati Riverfront

For us, Bayfront Even Plaza is Urban Plaza or Riverfront Event Plaza. I don't think Palemar Garden 2. though it is for events, can be considered as Private Riverfront Event Plaza as it is a closed compound garden & as such there is no paved plaza.

Please encourage local artists to construct Yakshagana, Kambla, Ati Kelanja etc statues along waterfront.

NMPA awarded second best container port in India (handling less than 0.5 million TEUs)

Club to introduce offshore sailboat cruising experiences in coastal K’taka
Quote:
Providing details, Satyavir Singh Siwatch, secretary of CKSC told TOI that the primary goal of the club is to promote sailing in coastal Karnataka, particularly in Mangaluru, due to its proximity to the Lakshadweep Islands and even the Andaman and Nicobar Islands.
Quote:
... Meanwhile, we plan to approach the govt and district administrations of Dakshina Kannada, Udupi, and Uttara Kannada to develop essential infrastructure for anchoring bigger sail yachts. ...
Quote:
Last year, CKSC began operations near the Kulur Bridge in Mangaluru, offering sailing training to students. The club aims at establishing Mangaluru as a prominent name in the national and international sailing community.
Whether proposed new port at Ullal is planned to have dedicated anchoring facilities for bigger sail yachts?

Imagine Guys, tourists coming by cruise ships or sail yatchs getting down at Rani Abbakka Port, Ullal. As soon as they come out of port entrance they are greeted by 50 feet steel statue of Rani Abbakka (We can call this Indian Statue of Liberty for the time being). And then they move through Rani Abbakka Bridge towards Rani Abbakka Museum @HoigeBazar viewing various wanterfront attractions like warship, warplane, tank, artillery, Yaksha Bhavana and other statues associated with Tulu culture.

Golden jubilee song of NMPA released

3 ವರ್ಷವಾದರೂ ಮುಗಿಯದ ಓಷನ್ ಬ್ಲೆಸಿಂಗ್ ತೆರವು!
Ocean Blessing shipwreck remains a challenge for removal even after 32 years

K’taka govt plans to establish water metro, water transport museum, experience center in Mangaluru
Quote:
Alongside this initiative, efforts are underway to boost maritime infrastructure with projects that include an international cruise terminal, a water metro, and a coastal berth in Mangaluru, said the CM.
Why Yettinahole budget is coming under Dakshina Kannada allocation? Let us demand this fund to be diverted to other projects in the district.

KCCI reaction to Karnataka Budget 2025
Quote:
... The Mangaluru-Karwar Coastal Highway expansion and modernization of New Mangalore Port require urgent attention to support regional trade and tourism.
Who has to modernize NMP? The state or the centre?

Karnataka announces state’s first-ever ‘Water Metro’ project in Mangaluru

Although watermetro, coastal berth & cruise terminals are mentioned, I don't think any specific amount of money is allocated to these.

Last edited by BolliBatlu; Mar 15, 2025 at 4:10 AM. Reason: added lant few links & lines
Reply With Quote
     
     
  #745  
Old Posted Feb 26, 2025, 9:05 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Karuna IT Park, Light House Hill


Mangalore Projects | SACPL






I think they have now dug to the level of Balmatta Road. Wonder when will it start rising up.

My teacher at school used to tell us that Motimahal has gone down to the same extent as it has gone up! Karuna buildings are also getting dug deep into ground including Karuna Pride IT Park.

Last edited by BolliBatlu; Feb 27, 2025 at 1:32 PM.
Reply With Quote
     
     
  #746  
Old Posted Feb 28, 2025, 4:13 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Make in Kudla

Let us now talk about 25 acres land acquisition requirement for IT/ITES Starup Hub. Suppose DK MP finalizes a site for IT Startup Hub then what is the possibility of District-In-Charge minister claiming protocol violation & identifying another 25 acres site? Is SBP/TiE team fully geared up to tackle such a situation & come up with a plan for 50 acres itself? Let us not be surprised if there is competition soon between rival political parties to finalize 25 acres land for IT Startup Hub & take credit.

By the way, regarding Institute of Banking Research and Training (IBRT) {or Intitute for Development and Research in Banking Technology (IDRBT)}, should we assume that Union Finance department still remembering this request & working for it? Or does this request need a periodic reminder say every three months? Can additional 25 acres land be used for IBRT or IDRBT? If we have 25+25 acres adjacent to each other then it will be tremendous advantage for collaboration between BFSI URL="https://bfsissc.com/"]2[/URL] startups & IBRT. Alternatively IIM or IIF (private) or IIBF (private) will also do.

I think Finance Minister is worried about project delays in DK due to land acquisition issues. Plastic Park + CIPET, NH-75, NH-169, NH-73 all are facing land acquisition delays. Question may be why DK politicians are unable to handle these issues? Suppose DK MP & District-In-Charge minister together approach the minister with 25+25 acres readily available land & plan then I think the minister will be very happy & saction IBRT immediately. In the mean time if the Former Chief Minister & Union Minister also approaches the union finance department with another 25 acres readily available land details for NLSIU then it will also be sanctioned immediately. Even NLSIU land can be nearby to encourage better collaboration between Legal Processing startups & it.

I think even in case of space allocation for statups at Central Market & Kankanady Market both Mangaluru South MLA and District-In-Charge minister can follow same principle and identify 1000 sqft space separately each. Funds for IT infrastructure development can be arranged by Mangalur Smart City itself by adding the cost to the building cost.

By the way, what is planned in 500 acres Mangaluru Aerocity by Adani apart from Adani University? Any plan for IT/ITES, BT & R&D in Aerocity? Anyway they, hopefully still alive, have a plan for 160 acres Data Park in Yellur, Udupi.

EIL ₹900 cr LPG caverns in Mangalore to be operational by Q2FY26

Mangalore Refinery inches up on signing MoU with SOCAR, ONGC

CII Mangaluru to conduct capacity building programme for entrepreneurs

Experts conduct survey to introduce coffee as alternative to arecanut cultivation

Mundoor village to host K’taka’s largest honey processing plant
Quote:
The Rs 5 crore project is capable of processing 15MT of honey per day, making it one of the largest processing units in the state, said Ramapratheek Kariyal, one of the directors of the Gramajanya FPC.
Quote:
"In the grant we received from NBB, it has four components. One is the processing unit, next is bee wax-based value-added products like moisturiser, creams, lip balm, pain relief balms, and body lotions. Another component is the testing lab with the FSSAI standards. Once the lab is set up, we will be able to test 14 parameters at the lab," he pointed out.
As per Hosadigantha (20-02-2025) Gramajanya FPO 2 3 is also producing banana & jackfruit pulps (for halwas? & other desserts, beverages & medicinal usages?). They have sold 40 tonnes of jackfruits to chips manufacturing companies. And targeting to achieve 100 tonnes with various value added products of tender & matured jackfruits. They are also encouraging bamboo cultivation in the region (supplying to paper industries?). How about exporting bamboo furnitures?

I don't know when will cluster fig (ಅತ್ತಿ) products gains momentum? No idea what is the amount of cluster figs getting wasted in Tulundau & Malenadu. Cluster figs have many uses, including as a food, medicine, and a source of nutrition.

8 Advantages of Having a Cluster Fig
Cluster Figs Information and Facts
ISTA AYURVEDA Gular Phal Ficus Racemosa - Cluster Fig Dried Fruit

Quote:
Originally Posted by BolliBatlu View Post
Nidde (Belthangady) based Agrileaf, arecaplates manufacturer, gets investment offer of Rs. 20 crores and targeting a business of Rs. 100 crores in next two years. ~Hosadigantha

Puttur based Gramajanya is constructing a Rs. 5 crores new unit, biggest in South India, to manufacture various apiculture products like cosmetics, honey wax candles, honey soaked dry fruits & various flavours of honey including Tulasi flavour. They are also constructing a Rs. 40 lakhs lab to test honey. ~Hosadigantha

Are there any one working on ಅತ್ತಿ or cluster fig based products? I think it can be developed as a meat substitute for vegans like jackfruit because of its texture. We need research on how to cook various meat-substitute foodstuffs including western & eastern ones using figs. There could be three varieties of dry figs namely immature, mature but green without taste and fully ripe sweet ones. Half-matured green figs (tasteless ones just before becoming fully ripe) could be cut into noodle strips. Flour could also be manufactured from dried figs. And figs could also be packed with brine solution like jackfruit. Along with this we need research on how to grow figs year-round. By the way, fig pickles are quite popular now a days.

Cluster Figs Information and Facts

A few yers back I discussed with a seller in a jackfruit festival about possibility of drying Tuluva jackfruits like dates (soft one). I don't know whether he or anyone else tried it so far. Ripe jackfruit causes gastrointestinal issues. Even grapes can cause acidity but dried grapes have no such issues. Wonder whether similar solution exist for jackfruits!?
What about value added products from various tubers? Packed finger chips (ready to fry like packed potato finger chips), flours, cookies etc? 1 2 3

I think DK farmers have started growing Senna tora or Thojank 2 in small scale.

Namhya Diabetic Care Tea with Herbs Paneer Dodi, Senna Leaves
Ayurvedic Life Senna Capsules 450mg Capsules, Natural, 120 count

ಕರಾವಳಿಯಲ್ಲಿ ಹೈನುಗಾರಿಕೆಗೂ ತಟ್ಟಿದ ಬೇಸಗೆ ಬಿಸಿಲಾಘಾತ

Mangalore Chemicals & Fertilizers update on scheme of arrangement

Everi Holdings Inc. hiring Lead Software Engineer

Mangaluru based Novigo Solutions expands global footprint with £12 million UK investment
Quote:
Novigo Solutions specializes in providing a comprehensive range of services, including end-to-end IT services, technology consulting, business consulting, analytics, and robotic process automation. The company's expansion into the UK marks a notable milestone in its global growth strategy.

With over 900 employees globally, Novigo Solutions is poised to leverage its expertise to cater to the growing demands of the UK market. This investment is expected to bolster the company's capabilities in delivering innovative solutions to its clients, while also contributing to the growth of the UK's thriving tech industry.
Hope this will generate more jobs in Tulunadu.

Finpower Aircon: Air Conditioning Equipment Manufacturer

MRPL honored with prestigious Governance Now 11th PSU awards

Throwback: ಮಂಗಳೂರಲ್ಲಿ ಐಟಿ ಪಾರ್ಕ್ ಬೀಜ ಬಿತ್ತಿದ ಎಸ್ಎಂ ಕೃಷ್ಣ

If a relative of SM Krishna becomes CM then only this IT Park will materialize!

India's Karnataka unveils new Industrial Policy, plans textile policy
Quote:
Big Bags International Ltd based in Mangaluru committed ₹100 crore to set up a technical textile unit.
Are they setting up the unit in Mangaluru itself? How many technical textile units are coming up in Plastic Park @Ganjimutt?

Invest Karnataka GIM2025 indicates that the monstrous city population is going to grow further. Can Tamil Nadu help Karnataka reduce the monstrous city population by developing an alternate to it in Madurai or Trichi & reducing the burden of overgrowing popualtion? - Have babies now: MK Stalin’s message for newlyweds is a delimitation jab. They can promote one of these cities as Educational and R&D Hubs and compete for investment of KWIN city. Similarly, Andhra Pradesh can also help Karnataka in reducing the mostrous city population as centre is showing special interest in it.

FISDOM expand into a larger office space at Ajanta Business Center

Zinnov rankings: Mangalore claiming its spot at #15

Anand Mahindra to invest ₹40,000 cr in Karnataka's Future
Quote:
Mahindra Group 's ₹40,000 crore bombshell transforms Karnataka's future!
Just when everyone thought big investments were slowing down...
Anand Mahindra dropped a game-changer at Invest Karnataka 2025: ₹40,000 crore committed to the state, with the lion's share—₹35,000 crore—going to renewable energy.

Why this matters for Mangalore:
As Karnataka's major port city, Mangalore stands to benefit enormously. The 5 GW solar and hybrid projects will need efficient logistics and transport—precisely what Mangalore's port infrastructure delivers.

This could transform the city into a renewable energy hub for Southern India.
The real kicker? Those 6,000-8,000 new jobs won't just be in Bangalore. Mangalore's strategic position makes it perfectly poised to become a talent magnet for skilled professionals in green energy.

And there's more... With Mahindra Holidays & Resorts India Limited investing ₹1,000 crore in Gokarna and Hampi, Mangalore becomes the gateway for luxury tourism.
As tourists flock to these destinations, they'll pass through Mangalore, boosting local businesses, hotels, and creating a tourism ripple effect.
The aerospace investments? Imagine Mangalore becoming a center for component manufacturing, leveraging its port facilities for both import and export.
This isn't just another corporate announcement—it's Mangalore's invitation to the big leagues.

Are you ready for what comes next?
I am not much hopeful on this.

Mangaluru Shines in the Elevate program
Quote:
Coastal Startups Grab 34% of Elite Grants!
We just discovered something that's about to change Karnataka's startup map forever...
15 brilliant startups from Karnataka's coastline quietly secured the prestigious Elevate grants! This isn't just impressive - it's a revolution brewing on our shores.

...
Coastal region becomes lifeless after 7-8 pm, says DKS; plans to boost tourism
Quote:
"After 7-8 pm, Mangaluru almost shuts down. With people staying indoors, there is no economic activity. During S M Krishna’s tenure, there were proposals to establish IT and BT sectors in the coastal region, but at the time, there was not a single complex there. Now, a few are emerging. Despite the region having the highest number of engineering and medical colleges, local talent is migrating to Bengaluru, Mumbai, and abroad."
Does this politician think IT/BT people are drunkards? On one hand 70 hours work versus family life debate is going on. On the other hand this kind of politicians are more worried about night life rather than family life! People want to stay with family but they are forced to migrate to the monstrous because there is no noticeable MNCs here offering better monetary & job growth opportunities. Real problem is political - real estate mafia nexus which is not promoting other cities. One thing is clear now, the state politicians want to turn every city in Karnataka into Pub City rather than IT/BT or Science City! Gandhi could be weeping!!

KEONICS to set up new Global Technology Centre as plug-and-play facility in Mangaluru

Budget drives economic growth with fiscal prudence; but doesn’t address specific needs of coastal Karnataka, says KCCI
Quote:
The incentives for investment and job creation in MSMEs, tourism and IT/ BT sectors should be extended to Tier-2 cities like Mangaluru to decentralise economic growth beyond Bengaluru. The ₹13,692 crore financial assistance for industries and ₹13,500 crore for services sector should include targeted incentives for Coastal Karnataka’s export-driven businesses and fisheries sector, Mr. Pai demanded.

Like ₹1,800 crore Brand Bengaluru initiative, Brand Coastal Karnataka initiative too should be taken up leveraging region’s tourism potential. ...
Earlier government had a plan for a Special Investment Region for Mangaluru. But this government ignored it. 2012 plan says "30,000 crore Special Investment Region (SIR) for Mangalore". Even though Karnataka Industrial Policy 2020-2025 mentions Mangaluru the current government is ignoring it.

Inspection done for software park in M’luru
Quote:
Following a request by Mangalore City North MLA Y Bharath Shetty, an inspection was carried out regarding the proposed Keonics Software Park near Blue Berry Hills within Mangaluru City Corporation (MCC) limits on Saturday. The inspection was led by the MLA, accompanied by Keonics chairman Sharath Kumar Bache Gowda and other officials. Discussions were also held on road widening in the area to support the upcoming development.
Whether KEONICS Global Technology Centre (GTC) is a separate project than IT Park? Why didn't Mangalore City South MLA showed them probable 25 acres land for Global Technology Center or IT Startup Hub? I think GTC will have IT Startups, boardroom, meeting rooms, auditorium, parking space, bus bays, cafeteria, shopping mall, recreation space. Similar facilities may be coming up in aerocity also. Even some builders like MRG (GolfFinch City), Rohan may also be planning to create such facilities. But these facilities may also be provided in a single building called IT Park. Coworking spaces also provide similar but limited facilities like meeting rooms.

By the way, as mentioned earlier, another 25+25 acres can also be identified for Intitute for Development and Research in Banking Technology (IDRBT) & NLSIU nearby.

Areca nut farmers face major setback as yield drops by 50%


~Hosadigantha

IT Park: KITS Registration Issues - Single Window Clearance Facility Required ~bharathshetty_y

Karnataka Innovation and Technology Society (KITS)

Last edited by BolliBatlu; Mar 15, 2025 at 4:12 AM.
Reply With Quote
     
     
  #747  
Old Posted Feb 28, 2025, 4:21 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
ParroPhins, Basavanagudi Mata Road, Adjacent to New Chitra Talkies, Alake

ParroPhins provides IT services in ERP, UX/UI Design, Mobile App development & quality assurance.

Reply With Quote
     
     
  #748  
Old Posted Feb 28, 2025, 4:25 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Saraghsoft Technologies, Adeesh Avenue, PVS Kalakunj Road

Saraghsoft Technologies provides Desi IT Services in ERP, HRM, E-Governance. This could be the first company in any of Land Trades premises.

Reply With Quote
     
     
  #749  
Old Posted Feb 28, 2025, 1:04 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Yamuna Sky City – Kulai, Mangalore

Reply With Quote
     
     
  #750  
Old Posted Feb 28, 2025, 1:22 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Mukund MGM Realty Ashoka Business Center, Bejai-Kapikad Road

Reply With Quote
     
     
  #751  
Old Posted Mar 3, 2025, 7:58 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Hampankatta Parking Complex U/C



Reply With Quote
     
     
  #752  
Old Posted Mar 5, 2025, 3:54 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Land Transportation - Rail

Track doubling for Bengaluru-Mangaluru, Hubballi-Dharwad

Mangaluru Junction Railway Station Redevelopment Latest Updates

Why MCC is not developing this road? And when are we going to have integrated bus terminal here?

MCC improves access road to Mangaluru Junction railway station from Naguri
Quote:
The corporation offers TDR to owner for 30 cents of land near the junction to eliminate bottleneck for creating a uniform nine-metre-wide road
ಬಳ್ಳಾರಿ-ಹಂಪಿ-ದಾವಣಗೆರೆ-ಮಂಗಳೂರು ನಡುವೆ ಹೊಸ ರೈಲು
Quote:
ಹೀಗಾಗಿ ಪ್ರಧಾನಮಂತ್ರಿಗಳ ದೂರದೃಷ್ಠಿಯ ಹೇಳಿಕೆಯನ್ನು ಸಾಕಾರಗೊಳಿಸುವ ಮಹತ್ತರ ಜವಾಬ್ದಾರಿ ರೈಲು ಮತ್ತು ಮತ್ತು ಪ್ರವಾಸೋದ್ಯಮ ಇಲಾಖೆಗಳ ಮೇಲಿದೆ. ಆದುದರಿಮದ ವಿಶ್ವದ ಯುನೆಸ್ಕೋ ಪಾರಂಪರಿಕ ತಾಣವಾದ ಹಂಪಿಯಿಂದ ರಾಜ್ಯದ ಇತರ ಪ್ರವಾಸಿ ತಾಣಗಳಾದ ಹಾಸನ, ಹಳೆಬೀಡು, ಬೇಲೂರು, ಶ್ರವಣಬೆಳಗೊಳ, ಕುಕ್ಕೆ ಸುಬ್ರಮಣ್ಯ, ಧರ್ಮಸ್ಥಳ ಹಾಗೂ ಶೈಕ್ಷಣಿಕ ಮತ್ತು ಬೃಹತ್ ಆಸ್ಪತ್ರೆ ಕೇಂದ್ರಗಳಾದ ಉಡುಪಿ-ಮಂಗಳೂರಿಗೆ ನೇರ ರೈಲು ಆರಂಭಿಸಬೇಕು.

ಇದರಿಂದ ನಮ್ಮ ರಾಜ್ಯದಲ್ಲಿ ಪ್ರವಾಸೋದ್ಯಮ ಮತ್ತು ಆರ್ಥಿಕ ಚಟುವಟಿಕೆಗಳು ಹೆಚ್ಚಾಗಿ ಉದ್ಯೋಗ ಅವಕಾಶಗಳು ಸೃಷ್ಟಿಯಾಗುತ್ತವೆ. ಅಲ್ಲದೇ ಕಲ್ಯಾಣ ಕರ್ನಾಟಕ ಹೆಬ್ಬಾಗಿಲಿನಂತಿರುವ ವಿಜಯನಗರ ಜಿಲ್ಲೆ ಮತ್ತು ಕಲ್ಯಾಣ ಕರ್ನಾಟಕದಿಂದ ಬಂದರು ನಗರ ಮಂಗಳೂರಿಗೆ ನೇರ ಸಂಪರ್ಕ ದೊರೆತು, ವ್ಯಾಪಾರ ವಹಿವಾಟುಗಳು ವೃದ್ಧಿಯಾಗುತ್ತವೆ ಎಂದು ಮನವಿ ಸಲ್ಲಿಸಿದ್ದಾರೆ.
Mangaluru ಜಂಕ್ಷನ್ ರೈಲು ನಿಲ್ದಾಣ: ಸಂಪರ್ಕ ರಸ್ತೆ ಅಭಿವೃದ್ಧಿ

Special Train Service Between Belagavi, Hubballi and Mangaluru

Coastal Karnataka’s pride, Mangaluru-Mumbai LTT Matsyagandha Express, to get LHB coaches in February 2025

Kerala pitches for third and fourth line, Namo Bharat Rapid Rail between Mangaluru and Thiruvananthapuram

ದೀಪಾವಳಿ ಹಬ್ಬ ಮುಗಿದ ಬಳಿಕ ಮಂಗಳೂರಿನಿಂದ ಬೆಂಗಳೂರಿಗೆ ವಿಶೇಷ ರೈಲಿಗೆ ಆಗ್ರಹ

Dakshina Kannada MP Brijesh Chowta demands Vande Bharat Express service between Mangaluru and Mumbai

Platform shelter renewal work begins at Udupi Railway Station

Dakshina Kannada MP asks officials to prepare comprehensive plan for development of Farangipet railway station
Quote:
The officials said that the detailed project report (DPR) for the Mangaluru Central Railway Station redevelopment work has been prepared and will be submitted to the Railway through the headquarters. An additional stabling line will be provided at the Mangaluru Central railway station and the work will be executed during the year. The new stabling line will reduce the movement of rakes to Bunder via Pandeshwar level crossing in the city.

Further, the officer said that once the Goods shed at Ullal becomes fully functional, the Goods shed at Bunder will be closed fully. Customers are also using the facility at Panambur. The MP directed officials to prepare a concrete plan to shift the goods shed in Bunder to Ullal and Panambur permanently.

On Pandeshwar level crossing, the officials said that there is no feasibility for RuB. MCC executive engineer Naresh Shenoy said that the NITK, Surathkal has been asked to conduct a feasibility report for RoB. The NITK has sought a survey report on the 500 metres radius of the area including water -level in the drains. MLA D Vedavyasa Kamath and MP Capt Chowta asked the MCC to submit the available data to the NITK, to prepare a feasibility study.
Quote:
The officials said that the Mahakalipadpu twin RuB work will be completed by January 2025. ...
Passenger train rakes to stop moving to Bunder Yard once additional stabling line comes up at Central Railway Station in Mangaluru

MP Brijesh Chowta Pushes for Better Rail Connectivity Between Bengaluru and Mangaluru

Mangaluru ಜಂಕ್ಷನ್ ಅಭಿವೃದ್ಧಿಗೆ ವೇಗ; ಹಳೆ ಕಟ್ಟಡಕ್ಕೆ ಹೊಸ ರೂಪ

Without a bus terminal adjacent to railway stattion connected by a common tunnel or subway the whole work is just a display of luxury without caring for commuters convenience!

ನೈಋತ್ಯ ರೈಲ್ವೆ ಮೈಸೂರು ವಿಭಾಗಕ್ಕೆ ಸೇರಲಿದೆ ಮಂಗಳೂರು?
Proposal to bring Mangaluru’s Railway lines under South Western Railway raised in Parliament
Chowta appeals for inclusion of M’luru rly stations under SWR

Mangalore MP Brijesh Chowta appeals for inclusion of Mangaluru Central junction stations under SWR | MP Brijesh Chowta, Railway Minister Ashwini Vaishnav ಮಂಗಳೂರು- ಬೆಂಗಳೂರು ಹಳಿ ಡಬ್ಲಿಂಗ್ ಮಂಜೂರಾತಿ ; ಮಂಗಳೂರಿನ ರೈಲ್ವೇ ಲೈನ್ಗಳನ್ನು ನೈರುತ್ಯ ರೈಲ್ವೇಗೆ ತರುವಂತೆ ಸದನದಲ್ಲಿ ಸಂಸದ ಚೌಟ ಪ್ರಸ್ತಾಪ, ಸಮಸ್ಯೆ ಬಗೆಹರಿಸುವ ಬಗ್ಗೆ ರೈಲ್ವೇ ಸಚಿವರ ಭರವಸೆ
Railway Ministry proposes Karnataka government to take over Hassan-Mangaluru Rail Development Corporation
Quote:
Having proposed to take over the Hassan-Mangaluru Rail Development Corporation (HMRDC), a special purpose vehicle formed for gauge conversion of Hassan-Mangaluru Railway Line following its poor financial health, the Railway Ministry has sanctioned the final location survey for line doubling between Bengaluru and Mangaluru in two parts, Railway Minister Ashwini Vaishnaw said on Wednesday (December 11, 2024).
ಗೋವಾ- ಮಂಗಳೂರು ವಂದೇ ಭಾರತ್ ರೈಲು ಕೇರಳಕ್ಕೆ ವಿಸ್ತರಣೆ ?

Karnataka approves Konkan railway merger with Indian railways

ಮಂಗಳೂರು ನಗರ ಭಾಗದ ರೈಲ್ವೆ ಮಾರ್ಗ ನೈರುತ್ಯ ರೈಲ್ವೆಯಡಿ ಕಾರ್ಯನಿರ್ವಹಿಸಲು ಪ್ರಸ್ತಾಪ

ಕೊಯಮತ್ತೂರು- ಮಂಗಳೂರು ಇಂಟರ್ಸಿಟಿ ರೈಲ್ವೆಗೆ ಬೇಡಿಕೆ, ಮಲಬಾರ್ ಜನರಿಗೆ ಅನುಕೂಲ

ಮಹಾಕಾಳಿಪಡ್ಪು ರೈಲ್ವೇ ಅಂಡರ್ಪಾಸ್; ಕುಂಟುತ್ತಿರುವ ಕಾಮಗಾರಿಗೆ ಬೇಕಿದೆ ವೇಗ

Railways again extends periodicity of Vijayapura Express Special without regularising its services

Twin Railway under Bridges near Mahakalipadpu to get completed by February: Southern Railway

ಮಂಗಳೂರು - ಹೊಸಪೇಟೆ ನಡುವೆ ಕೊಟ್ಟೂರು ಮಾರ್ಗವಾಗಿ ರೈಲು ಸೇವೆ ಆರಂಭಿಸಲು ಒತ್ತಾಯ
Decision on running Vijayapura-Mangaluru train via Hosapete soon

Level cross at Kuloor - Jokatte road and Maravoor to be closed for track maintenance

Is there any plan for RUB here?

ಹೊಸಪೇಟೆ-ದಾವಣಗೆರೆ-ಮಂಗಳೂರು ನಡುವೆ ಹೊಸ ರೈಲು ಸೇವೆ

ಹಾಸನ-ಮಂಗಳೂರು ನಡುವೆ ಹೊಸ ರೈಲು ಮಾರ್ಗ ನಿರ್ಮಾಣ
Quote:
... ನೈಋತ್ಯ ರೈಲ್ವೆ ಈ ಕುರಿತು ಅಂತಿಮ ಸ್ಥಳ ಸಮೀಕ್ಷೆ (ಎಫ್ಎಲ್ಎಸ್) ನಡೆಸಲು ಟೆಂಡರ್ ಆಹ್ವಾನಿಸಿದೆ. ಈ ಪ್ರಸ್ತಾವಿತ ಮಾರ್ಗ 247 ಕಿ. ಮೀ. ಇರಲಿದ್ದು, ಅಂತಿಮ ವರದಿ ಬಳಿಕ ಮಾರ್ಗ ನಿರ್ಮಾಣ ಮಾಡುವ ಕುರಿತು ರೈಲ್ವೆ ಇಲಾಖೆ ಅಂತಿಮ ತೀರ್ಮಾನ ಮಾಡಲಿದೆ.
Quote:
... ಆದರೆ ಈಗ ನೂತನ ಒಂದು ಅಥವ ದ್ವಿಪಥದ ರೈಲು ಮಾರ್ಗ ನಿರ್ಮಾಣ ಮಾಡುವ ಪ್ರಸ್ತಾವನೆ ಇದೆ.
SWR invites tenders for final location survey of Hassan-Mangaluru new rail line
Tenders invited for Hassan – M’luru rly doubling survey
Quote:
This includes providing a flatter gradient (1 in 100 as against present 1 in 50) in the new line length of 120 km Ghat section(with an additional length of 65km) and existing alignment in the balance 127 km of Hassan-Sakleshpur and Subramanya Rd- Mangalore Jn stretch.
~Captain Brijesh Chowta ಕ್ಯಾಪ್ಟನ್ ಬ್ರಿಜೇಶ್ ಚೌಟ
Whether the flatter gradient line of 120 km is doubleline or singleline? Looks like that double line will have existing line with steep gradient and an additional line with flatter gradient. The flatter gradient line is used for up or down journey?

Hassan-Sakleshpur existing 127 km alignment itself will be upgraded to double line.

ಅಮೃತ ಭಾರತ್ ವಿಶೇಷ ಯೋಜನೆಯಡಿ ಮಂಗಳೂರು-ಸುಬ್ರಹ್ಮಣ್ಯ ಮಧ್ಯೆ 4 ರೈಲ್ವೆ ಮೇಲ್ಸೇತುವೆ ನಿರ್ಮಾಣ

ಮಂಗಳೂರಿಗೆ ರೈಲು ಬಂದದ್ದು ಯಾವಾಗ? ಮಂಗಳೂರಿಂದ ಪಾಕಿಸ್ತಾನಕ್ಕೂ ರೈಲು ವ್ಯವಸ್ಥೆ ಇತ್ತು ಎಂಬುದು ಗೊತ್ತಾ?

Thiruvananthapuram - Mangaluru Vande Bharat coaches to double: Know more

ʼಮಂಗಳೂರು ಸಹಿತ ಪಾಲಕ್ಕಾಡ್ ವಿಭಾಗದ 16 ರೈಲು ನಿಲ್ದಾಣಗಳ ಅಭಿವೃದ್ಧಿಗೆ 300 ಕೋ.ರೂ. ವೆಚ್ಚʼ

Develop Surathkal as terminal to decongest Mangaluru railway stations: MLA

Okay. Develop Mangaluru North, Mangaluru South & Mangaluru East railway stations.

MP lays foundation for devpt of Mulki, Surathkal railway stations

ಬಂಟ್ವಾಳ ರೈಲು ನಿಲ್ದಾಣ ಅಭಿವೃದ್ಧಿಗೆ ಎಕ್ಸ್ಪ್ರೆಸ್ ವೇಗ,ಬಂಟ್ವಾಳ ರೈಲು ನಿಲ್ದಾಣ ಅಭಿವೃದ್ಧಿಗೆ ಎಕ್ಸ್ಪ್ರೆಸ್ ವೇಗ - putturu express speed for development of bantwala railway station

Hyderabad-Tirupati -Mangaluru train extended to Murudeshwar gains popularity in just three months

Quote:
Pleased to have met the Railway Board Chairman Shri Satish Kumar in Delhi today.

Discussed the proposal of the extension of the Kabaka-Puttur passenger train (06485) to Subramanya Junction & urged him to facilitate the same at the earliest.
~aptBrijesh

Modern LHB for Matsyagandha Express from Feb 17

Four railway flyovers under construction in Dakshina Kannada under Amrit Bharat scheme
Quote:
... four flyovers are being built at Kodimbala village in Kadaba taluk, Bajakere in Nekkiladi village, Purusharakatte near Sandipani Vidya Samsthe in Narimogaru village, and Gadipila in Puttur taluk.
ಕಾಂಞಂಗಾಡ್ -ಕಾಣಿಯೂರು ಹಳಿ ನಿರ್ಮಾಣಕ್ಕೆ ಕರ್ನಾಟಕ ಅನುಮತಿ ನಿರೀಕ್ಷೆ ಸಂಸದ ಉಣ್ಣಿತ್ತಾನ್

Mangaluru-Kabaka passenger train service extended to Subrahmanya
Two direct trains daily from Subrahmanya to Mangaluru; new passenger train schedule released

Mangaluru-Bengaluru overnight express trains too to get LHB coaches in May

Government: ಮಂಗಳೂರು-ಉಡುಪಿ ನಡುವೆ ಮೆಟ್ರೋ ರೈಲು ?


I wish even Manipal-Konaje Knowledge Corridor should be a part of metro rail in a later stage.



Who can invest in this if private investments are allowed? Adani? Mahindra? Relaince? Has DK MP talked to Mahindra University?

Here is the news in english.

Karnataka government considers metro rail between Mangaluru and Udupi
Metro rail project between Mangaluru-Udupi gains momentum

But don't be surprised if the government finally ask some private parties to run a train on the existing rail tracks just like using Sagaramala facilities for watermetro.

Here is more.

Metro Corridor Between Mangaluru and Udupi? Here’s What We Know
Quote:
Strategic Importance of the Project

The proposed corridor aims to improve connectivity between key urban, semi-urban, and industrial zones. It is expected to integrate well with existing transport infrastructure, including airports, railway stations, highways, and ports. With increasing population and rapid urbanisation, the metro project is seen as a sustainable transportation solution for the region.

The initiative is aligned with national programmes such as the National Infrastructure Pipeline (NIP), Smart City Mission, and Gati Shakti. The project’s design incorporates best practices in urban mobility, with a focus on electric vehicle (EV) integration and smart infrastructure.
64km metro corridor from Mangaluru to Udupi? Here's all you need to know
Quote:
The project is planned to be implemented in two phases. Phase 1, from 2025 to 2027, will focus on preliminary work, land acquisition, and initial construction. Phase 2, scheduled between 2028 and 2030, will involve full-scale construction, testing, commissioning, and obtaining regulatory approvals from the Ministry of Housing and Urban Affairs and the Ministry of Railways.

The project will be implemented in coordination with the Ministry of Railways, NITI Aayog, and the state govt, requiring clearances from environment, urban development, and railway authorities.
Mangalore Metro and Upcoming Karnataka Water Metro Project
Quote:
Future Prospects & Expansion Plans Of Mangalore Metro

The project will undergo detailed feasibility studies covering cost-benefit analysis, operational strategies, and demand forecasting over a 25-year period. Authorities will also explore additional revenue streams to maintain financial sustainability. Future expansion plans include extending connectivity to new regions and integrating Ro-Ro (Roll-on/Roll-off) services for cargo movement.
Does Ro-Ro (Roll-on/Roll-off) services mean carrying cars, bicycles etc in metro trains from Mangaluru to Udupi & vice versa?

If this metro passes through airport then they might have planned the track mostly along the current railway track with a little bit deviation to include cities along NH-66 in Udupi. In that case, first stage could be like the one below in green.



Hope they have planned for multimode terminals having parking places for buses, bicyles etc. Later they have to plan for water metro connectivity also.
buses, bicyles etc. Later they have to plan for water metro connectivity also.

Mangaluru-Subrahmanya Passenger Train Extension to Become a Reality by March-End- MP

Railway board approves extension of Mangaluru-Kabaka-Puttur passenger train to Subramanya

Last edited by BolliBatlu; Mar 15, 2025 at 4:15 AM.
Reply With Quote
     
     
  #753  
Old Posted Mar 5, 2025, 9:53 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Air Transportation

Mangaluru International Airport Enhances Security with New Police Check Post

PWD proposes to build five helipads in DK, says Satish Jarkiholi

ಮಂಗಳೂರು ಅಥವಾ ಉಡುಪಿ ನಡುವೆ ಪ್ರಾರಂಭವಾಗುತ್ತಾ ಹೊಸ ಏರ್ಪೋರ್ಟ್? ಬೇಡಿಕೆಗೆ ಸರ್ಕಾರದ ಉತ್ತರ ಏನು!
Quote:
ಬೆಂಗಳೂರು: ಮಂಗಳೂರು - ಉಡುಪಿ ನಡುವೆ ಹೊಸ ವಿಮಾನ ನಿಲ್ದಾಣ ಪ್ರಾರಂಭ ಮಾಡಬೇಕು ಎಂಬ ಬೇಡಿಕೆಗೆ ಬೃಹತ್ ಮತ್ತು ಮದ್ಯಮ ಕೈಗಾರಿಕೆ ಸಚಿವ ಎಂಬಿ ಪಾಟೀಲ್ ಪ್ರತಿಕ್ರಿಯೆ ನೀಡಿದ್ದು, ಅಂತಹ ಪ್ರಸ್ತಾವನೆ ಸರ್ಕಾರದ ಮುಂದೆ ಇಲ್ಲ ಎಂದು ಸ್ಪಷ್ಟಪಡಿಸಿದ್ದಾರೆ.
Quote:
Originally Posted by BolliBatlu View Post
State govt has not given 33 acres for airport expansion: Ministry

Whether now direction has to be given to the state government by Supreme court? Any PIL filed for this safety concern?
Assembly Session: ಮಂಗಳೂರು ವಿಮಾನ ನಿಲ್ದಾಣ: ರನ್ವೇ ವಿಸ್ತರಣೆಗೆ ಸಭೆ

ಮಂಗಳೂರು ವಿಮಾನ ನಿಲ್ದಾಣ ವಿಸ್ತರಣೆ: ಶೀಘ್ರದಲ್ಲೇ ಕೇಂದ್ರದೊಂದಿಗೆ ರಾಜ್ಯ ಸರ್ಕಾರ ಮಾತುಕತೆ
Quote:
ಕೇಂದ್ರ ನಾಗರಿಕ ವಿಮಾನಯಾನ ಇಲಾಖೆ ಮಂಗಳೂರು ವಿಮಾನ ನಿಲ್ದಾಣದ ನಿರ್ವಹಣೆ ಹೊಣೆಯನ್ನು ಖಾಸಗಿ ಸಂಸ್ಥೆಗೆ ವಹಿಸಿದೆ. ಅದರಿಂದಾಗಿ ಆ ಸಂಸ್ಥೆಯೇ ಭೂಸ್ವಾಧೀನ ಮಾಡಿ ಕೊಂಡು, ರನ್ ವೇ ನಿರ್ಮಿಸಬೇಕು. ಬೇಕಾದಲ್ಲಿ ರಾಜ್ಯ ಸರಕಾರ ಆರ್ಥಿಕ ನೆರವು ಹೊರತುಪಡಿಸಿ ಉಳಿದ ನೆರವು ನೀಡಲಿದೆ ಎಂದು ಹೇಳಿದರು.
Quote:
ಅದಕ್ಕೆ ಆಕ್ಷೇಪ ವ್ಯಕ್ತಪಡಿಸಿದ ಶಾಸಕರು, ವಿಮಾನನಿಲ್ದಾಣವನ್ನು ಖಾಸಗಿ ಸಂಸ್ಥೆಗೆ ನಿರ್ವಹಣೆಗೆ ಮಾತ್ರ ನೀಡಲಾಗಿದೆ. ಹೀಗಾಗಿ ರಾಜ್ಯ ಸರಕಾರವೂ ರನ್ ವೇ ನಿರ್ಮಿಸಬಹುದು. ಇಲ್ಲವಾದರೆ ಅಗತ್ಯ ಭೂಮಿ ಒದಗಿಸಬೇಕು. ಇದು ನೂರಾರು ಜನರ ಜೀವನದ ಪ್ರಶ್ನೆ. ಹೀಗಾಗಿ ರಾಜ್ಯ ಸರಕಾರ ನಿಲುವು ಬದಲು ಮಾಡಿಕೊಳ್ಳಬೇಕು ಎಂದು ಒತ್ತಾಯಿಸಿದರು.
Puttur MLA, Ashok Rai, Mangalore airport: ಜೀವದ ಜೊತೆ ಚೆಲ್ಲಾಟ ಬೇಡ, ಮಂಗಳೂರು ಏರ್ಪೋರ್ಟ್ ರನ್ ವೇ ವಿಸ್ತರಿಸಿ, ಸದನದಲ್ಲಿ ಕೈಮುಗಿದ ಅಶೋಕ್ ರೈಗೆ ಸಚಿವ ಎಂಬಿ ಪಾಟೀಲ್ ರಾಂಗ್, ಭೂಮಿ ಕೊಡಲು ರೆಡಿ, ಕಂಪನ
Quote:
ಶೂನ್ಯವೇಳೆಯಲ್ಲಿ ಪ್ರಶ್ನೆ ಎತ್ತಿದ ಅಶೋಕ್ ರೈ, ಮಂಗಳೂರು ಏರ್ಪೋರ್ಟ್ ಅಂತಾರಾಷ್ಟ್ರೀಯ ಮಟ್ಟದ ನಿಲ್ದಾಣ ಆಗಿದ್ದರೂ, ರನ್ ವೇ ಸಣ್ಣದಾಗಿರುವುದರಿಂದ ದೊಡ್ಡ ಮಟ್ಟದ ವಿಮಾನಗಳು ಲ್ಯಾಂಡ್ ಆಗುವುದಿಲ್ಲ. ಸದ್ಯ 95 ಮೀಟರ್ ಇರುವ ರನ್ ವೇ ಅಂತಾರಾಷ್ಟ್ರೀಯ ಮಟ್ಟದ ನಿಯಮ ಪ್ರಕಾರ 150 ಮೀಟರ್ ಅಗಲ ಇರಬೇಕು. ಉದ್ದ 2.7 ಕಿಮೀ ಇದ್ದು, ಅದು ಕನಿಷ್ಠ 3.5 ಕಿಮೀ ಇರಬೇಕಾಗುತ್ತದೆ.
Quote:
ಕಂಪನಿಯೇ ಹಣ ಭರಿಸಲಿ – ಪಾಟೀಲ್
ಅಶೋಕ್ ರೈ ಪ್ರತಿಕ್ರಿಯಿಸಿ ರಾಜ್ಯ –ಕೇಂದ್ರ ಸರಕಾರ ಎಂದು ಹೊಣೆ ವಹಿಸಿಕೊಳ್ಳುವುದು ಸರಿಯಲ್ಲ. ಜೀವದ ಪ್ರಶ್ನೆಯಾಗಿದ್ದು ಮತ್ತೊಮ್ಮೆ ಅಪಘಾತಕ್ಕೆ ಹಾದಿ ಮಾಡಿಕೊಡಬೇಡಿ. ಅದಕ್ಕೇನು ಆಗಬೇಕೋ ಅದನ್ನು ಮಾಡಿ ಎಂದು ವಿನಂತಿಸಿದರು. ಪ್ರತಿಕ್ರಿಯೆ ನೀಡಿದ ಸಚಿವ ಪಾಟೀಲ್, ಪಿಪಿಪಿ ಅಂದ ಮೇಲೆ ಕಂಪನಿಯವರೇ ಹಣ ಭರಿಸಬೇಕು, ಅವಶ್ಯಕತೆ ಬಿದ್ದರೆ ಕೇಂದ್ರ ಸರಕಾರದ ಜೊತೆ ಮಾತುಕತೆ ಮಾಡುತ್ತೇವೆ. ಈಗಾಗಲೇ ಮಂಗಳೂರು ನಿಲ್ದಾಣವನ್ನು 50 ವರ್ಷಕ್ಕೆ ಲೀಸಿಗೆ ಕೊಟ್ಟಿದ್ದಾರೆ. ನಾವು ನೂರಾರು ಕೋಟಿ ಹಾಕಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಮಾಡಿ ಖಾಸಗಿಯವರಿಗೆ ಕೊಡುವುದೇ ಆಗಿದೆ. ಶಿವಮೊಗ್ಗ, ಹುಬ್ಬಳ್ಳಿಯನ್ನು ಗುತ್ತಿಗೆ ಕೊಟ್ಟಿಲ್ಲ. ಆದರೆ ರೆಡಿ ಮಾಡಿ ಇರಿಸಿದ್ದೇವೆ. ಈಗ ಕೇಂದ್ರ ಸರಕಾರ ಮಾನಿಟೈಸೇಶನ್ ಆಫ್ ಏರ್ಪೋರ್ಟ್ ಅಂತ ಹೊಸ ರೂಲ್ಸ್ ತಂದಿದೆ. ನಾವು ಲ್ಯಾಂಡ್ ಕೊಟ್ಟಿದ್ದೇವೆ, ನಿರ್ವಹಣೆಗೆ ಮತ್ತೆ ಹಣ ಕೊಡಬೇಕಾದ ಸ್ಥಿತಿಯಿದೆ. ಇದಕ್ಕಾಗಿ ಹೇಳ್ತಾ ಇರೋದು, ಅಲ್ಲಿ ಭೂಮಿ ಬಿಟ್ಟು ಕೊಡುತ್ತೇವೆ. ಅದರ ಹಣವನ್ನು ಕಂಪನಿಯವರೇ ಭರಿಸಲಿ, 50 ಕೋಟಿ ಕೊಡುವುದು ಮಾಡಲಿ ಎಂದು ಹೇಳಿದರು.
Adani has to expand Airport Terminal and hand over it to the government after 50 years. And also they have to develop Aerocity. Put pressure on these things instead of runway extension. Otherwise ask Adani to spend its CSR fund for this & donate the land to the government after the lease period.

As far as airport management is concerned, when did any government (state or center) pay money to Adani group? I have not seen any news report on this. On contrary - AAI set to receive Rs 2,800 crore from Adani group towards payments linked to privatised airports.

At 95 kmph, Shefali powers runway safety at MIA

Women’s Day AI Express operates all-women crew flight from Mangaluru to Muscat

MIA bags prestigious ASQ Award for Best Airport at Arrivals Globally
Mangaluru International Airport gets award

Special team deployed to control birds and animals at Mangaluru International Airport!

Mangaluru, Thiruvananthapuram International Airports Adopt DigiYatra For Faster Check-ins

ರಾಜ್ಯದ ಹಲವೆಡೆ ಭಾರಿ ಮಳೆ: ಮಂಗಳೂರಿನಲ್ಲಿ ವಿಮಾನಗಳ ಮಾರ್ಗ ಬದಲು

Last edited by BolliBatlu; Mar 15, 2025 at 4:16 AM.
Reply With Quote
     
     
  #754  
Old Posted Mar 6, 2025, 3:53 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Tetherfi, Rohan City Square, MG Road

Tetherfi
Tetherfi | Secure Work From Home

Located on the 3rd floor left side of the building.

Reply With Quote
     
     
  #755  
Old Posted Mar 6, 2025, 4:03 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Everi, Bhandari Heights, Kottara

Everi - FinTech, Loyalty, Games, and Digital



Only E logo is visible, Everi name is covered by a palm leaf.

Quote:
Originally Posted by BolliBatlu View Post
No idea which IT companies are here.

Reply With Quote
     
     
  #756  
Old Posted Mar 6, 2025, 4:17 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
K-tech Innovation Hub, Plama Center, Bejai

Reply With Quote
     
     
  #757  
Old Posted Mar 7, 2025, 11:17 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Mangalore Infotech (UniCourt India), Mahesh College Road, Kottara Chowki

Reply With Quote
     
     
  #758  
Old Posted Mar 7, 2025, 11:20 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Winman Software, Mahesh College Road, NH66, Kottara Chowki

Reply With Quote
     
     
  #759  
Old Posted Mar 15, 2025, 4:19 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Startup Kudla: Education, Research & Innovations

Father Muller Research Centre Expands with Advanced Facilities
Quote:
The new division has been upgraded with state-of-the-art laboratory facilities, including molecular biology, nanoscience, and analytical chemistry equipment. Dr Shivashankar A R, head of the biochemistry division at FMRC and principal of Father Muller Allied Health College, Thumbay, provided an overview of the lab’s enhanced facilities. He highlighted that the biochemistry division, equipped with ELISA and spectrometry, the microbiology lab, featuring a specialized anaerobic lab and MALDI-TOF, and the cell culture lab, have been a boon for researchers. With advancements in proteomics and trace element analysis on the horizon, FMRC is poised to become a regional reference laboratory.
Shree Devi Institute of Technology students secure top ranks in VTU MBA exams

YES Germany Expands Presence with New Branches in Bangalore and Mangalore

Nitte DU Center for Indian Knowledge Systems inaugrated by Sri Sri Raghaveshvara Swamiji

110 birdwatchers document 90 species at NITK during GBBC

NIPM Mangaluru hosts Vice-Chancellors Conclave 2025 to strengthen education-industry ties

‘Beyond Bengaluru Cluster Seed Fund’ of ₹75 crore to encourage start-ups in Mysuru, Hubballi and Mangaluru

Inauguration of solar power installation held at Milagres College

Anganwadi centres in Mangaluru face lack of facilities

Biosensor developed by NITK researchers promises early detection of dengue

MU campus records 104 bird species

ಅಲೋಶಿಯಸ್ ವಿಶ್ವವಿದ್ಯಾಲಯ ಕ್ಯಾಂಪಸ್ನಲ್ಲಿ ಹಕ್ಕಿ ಗಣತಿ

Srinivas University organises guest lecture on Medical Imaging Technology

FMMC MEDICON 2025: A Confluence of Knowledge and Expertise in Nephrology

ಮಂಗಳೂರು ಜಿಲ್ಲೆಗೆ ಬೇಕಿದೆ ಸರ್ಕಾರಿ ವೈದ್ಯಕೀಯ ಕಾಲೇಜು ; ಬಜೆಟ್​ನಲ್ಲಿ ಬೇಡಿಕೆ ಈಡೇರಿಸುತ್ತಾರಾ ಸಿಎಂ ?

ಅಂಗನವಾಡಿಯಲ್ಲಿ ಸ್ಮಾರ್ಟ್ ಎಜುಕೇಶನ್
Anganwadi 2.0:Embracing the Digital Age with Smart TVs

ದಶಕಗಳ ಬೇಡಿಕೆಗೆ ಸಿಎಂ ಅಸ್ತು: ಪುತ್ತೂರಿನಲ್ಲಿ ಹೊಸ ಮೆಡಿಕಲ್ ಕಾಲೇಜು ಮಂಜೂರು
ಪುತ್ತೂರಿಗೆ ಮೆಡಿಕಲ್ ಕಾಲೇಜು ಮಂಜೂರು: ಹಲವು ದಶಕಗಳ ಬೇಡಿಕೆಗೆ ಸಿಎಂ ಅಸ್ತು

ದಕ್ಷಿಣ ಕನ್ನಡಕ್ಕೆ ಸಮಾಧಾನಕರ ಬಜೆಟ್ - ಮೀನುಗಾರಿಕಾ ವಲಯ, ಶಿಕ್ಷಣಕ್ಕೆ ಹಲವು ಯೋಜನೆ
Quote:
* ಪುತ್ತೂರಿನಲ್ಲಿಹೊಸ ವೈದ್ಯಕೀಯ ಕಾಲೇಜು ಸ್ಥಾಪನೆಗೆ ಉದ್ದೇಶಿಸಲಾಗಿದ್ದು, ಇದಕ್ಕಾಗಿ ಈಗಿರುವ 100 ಹಾಸಿಗೆ ಸಾಮರ್ಥ್ಯದ ತಾಲೂಕು ಆಸ್ಪತ್ರೆಯನ್ನು ಉನ್ನತೀಕರಿಸಲು ಪ್ರಸಕ್ತ ವರ್ಷದಲ್ಲಿಕ್ರಮ.
* ಪಿಲಿಕುಳದಲ್ಲಿಭಾರತ್ ಸ್ಕೌಟ್ಸ್ ಮತ್ತು ಗೈಡ್ಸ್ ಅಂತಾರಾಷ್ಟ್ರೀಯ ಯುವಕರ ತರಬೇತಿ ಕೇಂದ್ರದ ಅಭಿವೃದ್ಗಾಗಿ ಎರಡು ಕೋಟಿ ರೂ. ಅನುದಾನ
* ಮಂಗಳೂರಿನಲ್ಲಿರುವ ಮೀನುಗಾರಿಕೆ ಕಾಲೇಜಿಗೆ ಪ್ರಸ್ತುತ ನಿಗದಿಪಡಿಸಿರುವ ವಿದ್ಯಾರ್ಥಿಗಳ ಸಂಖ್ಯಾಬಲ ದ್ವಿಗುಣ
FMCON along with FMRC hosts national conference on ‘Research Excellence’

Karnataka's tech boom expands, Mangaluru leads the way


Research takes a backseat at Mangalore University!
Quote:
Declining research projects

Between 1990 and 2015, Mangalore University focused extensively on higher studies and research. However, recent years have witnessed a sharp decline in research activities.

A review of various university departments reveals the downturn. Previously, several departments had undertaken numerous research projects in collaboration with reputed institutions. However, ongoing research projects are now limited to just a handful.

The Economics department had a strong research presence in the 2000s, with projects funded by Corporation Bank, UGC, the State Social Welfare Department, and other organizations. Studies on MRPL workers’ financial conditions, SC/ST hostel management in Mangalore, Udupi, and Kodagu, contributions of NGOs to development, and microfinance activities were among the key projects completed. Between 2000 and 2015, there was no shortage of research initiatives. However, since 2019, only one project has been undertaken.

Similarly, the Political Science department had executed three research projects between 2010 and 2015 with funding from the European Commission and Indo-European study programs. At present, there are no active projects. The Mass Communication and Journalism (MCJ) department has not received any research projects since 2009-10.

The Kannada department, which previously conducted research on coastal culture, traditions, and movements, currently has only one ongoing project, initiated in 2016. The English department had earlier collaborated with institutions in Switzerland, Brazil, and South Africa for research, but at present, only one project is active.

The Life Sciences department had conducted extensive research in partnership with the Ministry of Environment, Nuclear Power Corporation, BRNS, Indian Council of Agricultural Research, and AICTE. Currently, only two projects are active. The Computer Science department has no available data on ongoing research, while the Biochemistry department has just one project in progress. The Marine Geology department, once renowned for its studies on coastal erosion, is now engaged in only a single project.

The Chemistry department, one of the university’s most reputed divisions, had previously undertaken multiple research projects with support from DST, UGC, BRNS, and the Nuclear Power Corporation of India. However, as per available data, no active research is currently underway in the department.

The Physics department, which had established collaborations with DRDO, DST-SERB, and CSIR for studies on nuclear radiation, polymer electrolytes, and nanomaterials, has also seen a decline. Prestigious partnerships with Bhabha Atomic Research Centre (BARC) and Kalpakkam IGCAR were once a major strength, but there has been no significant research reported since 2021.

DST lab remains underutilized

To promote scientific excellence, the Government of India’s Department of Science and Technology (DST) had sanctioned Rs 9 crore to establish the DST-PURSE lab at the university. Between 2014 and 2020, the lab was actively used for various research projects. However, its second phase of funding is still in process, leaving research activity at a standstill.

Biosciences department remains active

Among all the science departments, the Biosciences division continues to thrive in research. Since 2015, it has undertaken five research projects with funding from UGC, BRNS, Pilikula Nisargadhama, and the DBT Ramalingaswami Fellowship.

The Botany department, once engaged in research on conservation, Western Ghats flora, plant-microbe interactions, and ethnobotanical studies, had received grants from the Malaysian government, Karnataka Power Corporation, DST, KIOCL, and the State Biodiversity Board. However, most of these projects were completed by 2020, and only one remains active.

The overall decline in research at Mangalore University is a cause for concern. With financial instability hampering academic progress, experts stress the need for immediate intervention to revive research culture at the institution.
Mangaluru researchers come up with device for early gynecological diagnosis

Mangaluru University: ತನ್ನ ಶಿಶುಗಳಿಗೇ ಉಣಿಸಲು ವಿಶ್ವವಿದ್ಯಾನಿಲಯದಲ್ಲಿ ಹಾಲಿಲ್ಲ !

Grassroots activism: Blue-collar workers transform school toilets in DK

Crowdfunding drive for fisheries research vessel launched
Quote:
Sea=MC² is a collective effort of fisheries professionals in Mangaluru and stakeholders from the five coastal states sharing the Arabian Sea. The committee aims to raise Rs 5 crore through crowdfunding for the fisheries research vessel.
Quote:
"Talks are underway with Cochin Shipyard to build a custom-designed vessel capable of operating within 12 nautical miles. The research vessel will support studies on stock assessment, marine pollution, and other issues linked to common property resources," he said.

"The committee also has plans for establishing a referral laboratory and a marine data repository. Efforts will be made to identify and conserve critical ecosystems such as mangroves and breeding grounds to support fishery conservation. ... " said Ramesh MR, committee chairman ...
570 persons trained in fish, seafood processing, 636 in tourism, hospitality sector under PMKVY in Dakshina Kannada
Reply With Quote
     
     
  #760  
Old Posted Mar 15, 2025, 4:24 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,366
Water

Call for Scientific Study on Breakwaters as Mangaluru Beaches Shrink

Residents seek action against dumping of waste into river

Trash dumped into water sources lands at beaches, says Vivek Alva

Over Rs 1000 cr sanctioned for Puttur drinking water project: MLA Ashok Kumar Rai

Rain in coastal region surpasses target during northeast monsoon
Dakshina Kannada sees 41% rise in pre-monsoon rainfall in coastal areas

Water has been replaced by other priorities like transport connectivity and mobile networks, says Narendra Rai Derla

ಕಾಂಡ್ಲಾವನ ಮರೆತ ಸರಕಾರ!; ಅನುದಾನ ಬಾರದೆ ಯೋಜನೆ ಬಾಕಿ

Nearly 50% of Dakshina Kannada’s shoreline eroded, says NCCR study

Mangaluru: 7 ಕೆರೆ, ಪಾರ್ಕ್ ಅಭಿವೃದ್ಧಿಗೆ ಅಮೃತ 2.0

Mangaluru's Urban Spaces Transformation with AMRUT 2.0 Funding: A New Era of Parks and Water Bodies
Quote:
Under the AMRUT 2.0 scheme, Mangalore City Corporation will develop four water bodies and three parks with a sanctioned budget of Rs 26.95 crore. This includes Rs 1.95 crore for operation and maintenance. Selected projects include Jogimata Lake, Byradi Lake, Baggundi Lake, Kadekar Mallikarjuna Lake, Souharda Lane Park, Kodical Kallakanda Park, and Kadri Park.
Mayor to chair zone-wise meetings to discuss Jalasiri 24x7 water project

Nearly half of DK’s coastline faces erosion

M’luru airport observatory records historic downpour with 156 mm of rainfall

Jalasiri water project work moving at snail’s pace
Mayor, MCC members irate over delayed Jalasiri project works
Quote:
KUIDFC officials informed the council that out of the targeted 1,288.8 km of pipeline to be laid under the Rs 792.4-crore Jalasiri project, only 730.2 km has been completed, leaving 548 km of work pending. The project, which was to be completed by May 2024, is progressing at a snail’s pace.
Quote:
Officials revealed that approximately 37 km of major pipeline and distribution network work in areas under the National Highways Authority of India (NHAI) jurisdiction remains incomplete due to pending approvals.
Jalasiri project in Mangaluru has achieved 71% physical progress, says KUIDFC
Quote:
The report said that of the ₹821.97 crore project, the construction cost has been revised to ₹617.22 crore and ₹204.75 crore has been set aside for operation and maintenance of the infrastructure facilities created under the project for eight years.
Quote:
Of 19 over head tanks (OHTs) to be built, civil works of 10 OHTs completed and structural works of five OHTs are under progress and four OHTs are yet to be built.

In addition, construction of a 125 MLD capacity water treatment plant has just begun (with 6% progress) at Adyar.

The financial progress so far was at ₹307.45 crore.
Maravoor: Villagers fear release of untreated water into drinking water barrage

ಮಳೆ ನೀರು ಹರಿಯುವ ಕಾಲುವೆಗೆ ಪೈಪ್!

Mangaluru; ಹರೇಕಳದಿಂದಲೂ ನಗರಕ್ಕೆ ನೀರು

Issue of untreated water released into rivers raised at meet

Neglect of Gujjarakere Pond Sparks Public Outcry

Drinking water issue in M’luru city to be discussed at govt level

Waste dumping continues to plague Mangaluru’s water bodies despite warnings

ಕಿಂಡಿ ಅಣೆಕಟ್ಟಲ್ಲಿ ನೀರು ಸಂಗ್ರಹ: ರೈತರಿಗೆ ಖುಷಿ, ನೇತ್ರಾವತಿ- ಕುಮಾರಧಾರ ನದಿಗಳ ಸಂಗಮಕ್ಕೆ ಬರುವ ಭಕ್ತರಿಗೆ ಬೇಸರ

Concern over water quality at NITK after reports go viral

NITK submits 34 water samples for testing to College of Fisheries

M’luru constituency to receive comprehensive water supply upgrade in 18 months: UT Khader

ಗುಜ್ಜರಕೆರೆ ನೀರು ಬಳಕೆ ಯೋಗ್ಯವಲ್ಲ

NITK initiates action over bacterial contamination

Bantwal: Mangaluru also to benefit as Jakribettu barrage begins water storage

Trust focuses on cleanliness in and around Gujjarakere

ಪಯಸ್ವಿನಿ ನದಿಯ ನಾಗಪಟ್ಟಣ,ಭಸ್ಮಡ್ಕ,ಕಾಂತ ಮಂಗಲ ವ್ಯಾಪ್ತಿ ಮೀನುಗಳ ಸಾವಿಗೆ ನೀರು ಮಲಿನ ಕಾರಣ?

MLA seeks solutions for submersion of farmland

Karnataka Maritime Board rolls out shoreline management plan

City unlikely to face water crisis this summer: Mayor
ನೀರಿನ ಸಮಸ್ಯೆ ಆಗದಂತೆ ಮುನ್ನೆಚ್ಚರಿಕೆ ವಹಿಸಿ
Drinking water issue: DC directs precautionary measures

ಸಾರ್ವಜನಿಕರೇ ಎಚ್ಚರ... ಹೀಟ್ ವೇವ್ ಜತೆಗೆ ದಕ್ಷಿಣ ಕನ್ನಡದಲ್ಲಿ ನೀರೂ ಡೇಂಜರ್!

Useless government. Other than issuing warning they are not capable doing anything else to ensure water safety.

MP, DC direct KSPCB to check pollution of Nandini River

Mariyamma temple to maintain historic Gujjarakere

Samithi to protest against pollution of Nandini river on Tuesday
Samiti gives fortnight’s ultimatum to administration to prevent sewage flow into Nandini river

ಮಲೀನಗೊಂಡ ನಂದಿನಿ ನದಿ: ಕಂಡೇವು ಮೀನು ಹಿಡಿಯುವ ಜಾತ್ರೆಗೆ ಬಂದ ಕಂಟಕ

Mangaluru: ತಾಪಮಾನದಲ್ಲಿ ಏರಿಕೆ:ಅವಧಿಗೂ ಮುನ್ನ ಮುಂಗಾರುಪೂರ್ವ ಮಳೆ ಸಾಧ್ಯತ

Pavoor Uliya island residents protest against illegal sand mining

Mangaluru city corporation water is safe: Minister Suresh

Surathkal: ಖಂಡಿಗೆಯಂತೆ ಬಗ್ಗುಂಡಿಗೂ ತ್ಯಾಜ್ಯ ನೀರಿನ ಸಮಸ್ಯೆ

Hailstorm and icy pellets seen in parts of Dakshina Kannada



Yettinahole Expansion Not Needed

~Hosadigantha
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India
Forum Jump



Forum Jump