Quote:
Originally Posted by Marshsparrow
Very disappointed to see Toronto-KW-London-Windsor left out.
|
I am very happy to see TKLW left out. And even disappointed that Montreal-Trois Rivieres - Quebec City is being left in. People need to understand that scope creep kills projects. Not everything needs to be done in the first phase. It's the equivalent of saying a new subway line is disappointing because they only started with 10 stations instead of building the whole 50 station network in the first phase. If you actually want to see things built, you should be advocating for the smallest phases that are economically feasible.
For a project like this, it should have been:
1) Toronto-Ottawa-Montreal
2) Toronto-Kitchener-London
3) Montreal-Trois Rivieres-Quebec
4) London-Windsor-Detroit
Also, at least some of the blame here should go to the Wynne Liberals. VIA focused on Toronto-Ottawa-Montreal and later added Quebec City, because the Wynne Liberals kept insisting they were going to build an Ontario owned and operated HSR in Southwestern Ontario. If anything dooms this project, it's the fact that so many of those Wynne Liberals are part of Trudeau's policy cohort.