First track installed in the tunnel. Arbutus switches



https://x.com/broadwaysubway_/status/1889366344304328758/photo/1
Reply With Quote
     
     
  #3022  
Old Posted Feb 18, 2025, 3:43 AM
s211 s211 is offline
 
Join Date: Oct 2008
Posts: 8,519
^ That is one rather — bright strands of LEDs!
Reply With Quote
     
     
  #3023  
Old Posted Feb 18, 2025, 4:21 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
So much brighter than the old lighting they used for previous tunnels

https://x-glo.ca/tunneling/
Reply With Quote
     
     
  #3024  
Old Posted Feb 19, 2025, 2:35 AM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,833
Quote:
Originally Posted by jollyburger View Post
So much brighter than the old lighting they used for previous tunnels

https://x-glo.ca/tunneling/
They are temporary - just for construction:
Quote:
When tunneling projects are completed, the lights are easily removed and stored for the next project.
https://x-glo.ca/tunneling/
Reply With Quote
     
     
  #3025  
Old Posted Feb 19, 2025, 2:47 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
They were using some old school lights in the Emily Carr tunnel section



https://x.com/broadwaysubway_/status/1882126366553813147/photo/1
Reply With Quote
     
     
  #3026  
Old Posted Mar 3, 2025, 1:12 PM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,833
More from the project twitter:


Did you know that Broadway-City Hall will have 4 levels instead of 3? That's because of this Canada Line platform level.
On this level, passengers can reach the Canada Line northbound platform, go up to the station entrance (left) or down to the Millennium Line (right).

https://x.com/broadwaysubway_/status/1895168328441774375


Here, geotechnical engineers survey the end of the tunnels at Arbutus Station.
Using a tape extensometer, they measure the precise distance between fixed points in the tunnel, which can detect changes in tunnel alignment. This ensures that the tunnels are constructed safely.

https://x.com/broadwaysubway_/status/1894447664395129047
Reply With Quote
     
     
  #3027  
Old Posted Mar 3, 2025, 6:06 PM
Lexus's Avatar
Lexus Lexus is offline
 
Join Date: Jul 2018
Posts: 2,874
2025, March 2

GNW

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #3028  
Old Posted Mar 6, 2025, 1:17 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Another big concrete pour 126 trucks for Mt Pleasant on March 8th

https://www.broadwaysubway.ca/construction/current-work/

There were 90 on February 27th.

Video of the Feb 27 pour

• Video Link


Seems like they are still a few months from closing in the station.
Reply With Quote
     
     
  #3029  
Old Posted Mar 7, 2025, 4:34 AM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
From the January Monthly Report.

GNW


Near Mount Pleasant Station

Images from Province of BC https://www.broadwaysubway.ca/app/upload...P_Monthly_Status_Report_January_2025.pdf

Last edited by madog222; Mar 7, 2025 at 5:03 AM.
Reply With Quote
     
     
  #3030  
Old Posted Mar 18, 2025, 6:42 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Who knew they have a mini concrete truck for the tunnel



https://x.com/broadwaysubway_/status/1900222906912715001/photo/1
Reply With Quote
     
     
  #3031  
Old Posted Mar 18, 2025, 8:21 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
 
Join Date: Sep 2014
Posts: 2,185
Quote:
Originally Posted by jollyburger View Post
Who knew they have a mini concrete truck for the tunnel...
Where do they get those wonderful toys?
Reply With Quote
     
     
  #3032  
Old Posted Mar 18, 2025, 9:07 PM
chowhou's Avatar
chowhou chowhou is offline
 
Join Date: Sep 2019
Posts: 3,924
Quote:
Originally Posted by Tvisforme View Post
Where do they get those wonderful toys?
And importantly does the lead engineer go "Vroom! Vroom! Beep! Beep!" when they move it around the site?
Reply With Quote
     
     
  #3033  
Old Posted Mar 19, 2025, 1:12 AM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,833

Here’s a look at the platform level of Mount Pleasant Station. Up above, we can see that the concourse-level floor at this station has been completed.
Do you see the gaps in the concourse-level floor? Stairs, escalators and elevators will be installed in these gaps.

https://x.com/broadwaysubway_/status/1899145397941215326

This must be to the newer office building at Oak and Broadway:


This tunnel is for the emergency exit at Oak-VGH Station, and connects to stairs in a neighbouring building.
Before the building was built, the @CityofVancouver worked to reserve space for the exit. This early coordination helped integrate the new SkyTrain Station efficiently.

https://x.com/broadwaysubway_/status/1897709198105878566
Reply With Quote
     
     
  #3034  
Old Posted Apr 1, 2025, 10:56 AM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
March 2025 Project Update:

https://app.webtrackz.com/?q=email/view/14U6K4yY9lOgsO0T9RrdVKbi23MJiYAK_hMs1g8b7JiGYLSbgiqv17sg

Quote:
Planned construction activities for the next three months include:

Installing tracks on the elevated guideway and within the tunnels;
Installing the crew walkway, lighting and communications systems in the tunnels;
Constructing walls and columns at all six new underground stations;
Constructing the concourse floor at Oak-VGH, South Granville and Arbutus stations;
Constructing the underground station roof at all six stations;
Constructing the concrete base slab at Broadway-City Hall Station on the Canada Line platform level;
Extending the Canada Line platform to 50 metres at Broadway-City Hall Station; and
Constructing the underground passenger connections between the Millennium Line extension and the Canada Line at Broadway-City Hall Station.

Image from Province of BC
Reply With Quote
     
     
  #3035  
Old Posted Apr 7, 2025, 3:26 PM
twoNeurons twoNeurons is offline
 
Join Date: Aug 2002
Posts: 6,130
Quote:
Originally Posted by Tvisforme View Post
Where do they get those wonderful toys?
I get that reference.
Actuallly I saw a concrete truck about this size in Japan. Looked like it was built on a Kei platform. It drove by faster than I could take a photo (and it looked different than this) but it was the cutest thing.
Reply With Quote
     
     
  #3036  
Old Posted Apr 9, 2025, 8:08 PM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
From the February Monthly Status Report

https://www.broadwaysubway.ca/app/upload..._Monthly_Status_Report_February_2025.pdf

Mount Pleasant Station Propulsion Power Substation room


Granville Station platform level
Reply With Quote
     
     
  #3038  
Old Posted Apr 12, 2025, 3:48 AM
Stainer Stainer is offline
 
Join Date: Jan 2024
Posts: 59
Absolutely amazing watching it all come together. Wonder if they'll do an open house like they did back when the M line was being built?
Reply With Quote
     
     
  #3039  
Old Posted Apr 28, 2025, 9:07 PM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,833
From the twitter feed:

Posted April 17th:


Work at Arbutus Station has now reached street level!
https://x.com/broadwaysubway_/status/1912929259569479967

Posted April 23rd:


Here’s a look at the Mount Pleasant Station site from above!
https://x.com/broadwaysubway_/status/1915088497368519063
Reply With Quote
     
     
  #3040  
Old Posted May 2, 2025, 2:07 PM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
From the March 2025 monthly report.

https://www.broadwaysubway.ca/app/upload...BSP_Monthly-Status-Report_March-2025.pdf




Images from Province of BC
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:00 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.