The mall loading bays are in the Howe St. Tunnel, but they may be a bit farther south, as the ramp down from Howe is pretty close to the hotel.
I know if you go down the ramp, there's a right turn veer at the bottom you can make to get to the loading bays and Howe St. Tunnel.
***
Just interior demolition I presume?
I would read it as "Interior alterations to demo floors 1, 2 & 3 of this [existing] Retail tenant at this commercial building on this site."
(i.e. reflecting the currently demised layout).
From July 3, 2014:
Quote:
Originally Posted by SpongeG
so the stone, the nordstrom signature stone, if nordstrom fails and pulls out of canada would they keep the stone or change it? any speculation?
|