Quote:
Originally Posted by Acajack
As a regionally-minded Gatineau resident both the Vanier Parkway upgrades and tunnel extension under the Rideau River AND the Kettle Island bridge seem like acceptable options to me.
They both have their advantages and disadvantages.
The truth is we need a new crossing and to get trucks off King Edward.
|
I’m going to agree with you (agreeing with me). BOTH, an east-end bridge AND a road link between Vanier and the M-C bridge are needed.
I just find it so silly when people say things like; “Since ALL of the trucks are not going to be moved from King Edward to an eastern bridge, a new bridge there is not needed.”
The goal of an eastern bridge is to make a new connection across an existing barrier. It offers so many benefits – far beyond the limited number of trucks that will switch from the M-C bridge to the new bridge. I can only imagine that people who can not conceive of the myriad benefits of a new bridge would also think that increasing the speed of digital communications beyond a 64kbaud MoDem was completely unnecessary, and ruined their ‘Bulletin-Board Neighbourhood’. Also, the speed increases encouraged the Internet to grow massively, and now it uses so much power that it is threatening the world.
Turning to the old cliché: You can’t make an omelet without breaking some eggs – Yes, adding a new east-end bridge will change some neighbourhoods. When the 416 was built, it changed neighbourhoods, too. But I don’t think that there are too many people who would say that it should not have been built, or should now be removed. It has become an indispensable part of the road network, and moves thousands of vehicles each day. Cities are dynamic things. They are ever changing, and thus require adaptations. If a neighbourhood densifies, the sanitary sewer pipes might need to be supplemented with more /larger pipes. Simply allowing ‘congestion’ within the old pipes is not an option. And it shouldn’t be for vehicle movement either. A healthy city needs to ensure smooth flow for all of its core services.
As for the missing link to the M-C bridge; that bridge is not going anywhere soon. It opened in 1965, and the way things are going, even when it eventually gets replaced, there will be a large bridge connecting Quebec’s highways to Ottawa’s residential streets. The south end of it should have been connected to appropriate roads when the bridge was first built. Local public pressure caused one of the biggest mistakes of Ottawa’s road network. That disastrous decision has proven to be fatal. This mistake needs to be corrected. NOW!
And, Yes, the Vanier Parkway is much more suitable as a connector between the 417 and the M-C bridge. It was built with that purpose in mind – except, the last link was abandoned.