Percy needs to pay up for better renders for his project, they all have buildings in the wrong place or street infrastructure inaccuracies. This one has a whole new residential building in the middle of King's Square

Last edited by darkharbour; Nov 26, 2024 at 8:14 PM.
Reply With Quote
     
     
  #342  
Old Posted Nov 26, 2024, 2:27 PM
bridgeoftea's Avatar
bridgeoftea bridgeoftea is offline
Registered User
 
Join Date: Nov 2021
Posts: 700
Quote:
Originally Posted by DyAm00394 View Post
The mayor shared on social media this closer up rendering on a summary post of tonight’s council meeting.

Also a Committee of the Whole item was approved at the meeting tonight as well relating to this development.

“The City of Saint John entered into an agreement for a Tier 2 Urban Development Incentive Grant Application with 99 King St. G.P. Inc”.


I really like the large long windows. It should look pretty cool in person on street view.
Reply With Quote
     
     
  #343  
Old Posted Nov 26, 2024, 3:42 PM
sailor734 sailor734 is online now
Registered User
 
Join Date: Apr 2023
Posts: 2,665
It's in no way awful but I don't think it's an architectural homerun either. To each their own but I find it kind of uninspired.

I get they are trying to blend with the other buildings around them but I'm not sure we need to do that every time a new building goes up. A city streetscape should evolve and change over time.

In any event, not objectionable and a big improvement over the old Woolworth's (and a huge improvement over the hole! )
Reply With Quote
     
     
  #344  
Old Posted Nov 26, 2024, 8:13 PM
Pugsley Pugsley is offline
Registered User
 
Join Date: Feb 2009
Posts: 599
Sooo many conflicting architectural styles and eras jammed into one building. My head hurts.
Reply With Quote
     
     
  #345  
Old Posted Nov 27, 2024, 1:21 PM
EnvisionSaintJohn's Avatar
EnvisionSaintJohn EnvisionSaintJohn is online now
New Brunswick, Canada ⛵️
 
Join Date: Apr 2023
Location: Canada's first City 🍁🌊
Posts: 4,010
Quote:
Originally Posted by Pugsley View Post
Sooo many conflicting architectural styles and eras jammed into one building. My head hurts.
That front entrance arch or whatever you'd call it reminds me of the gaudy style embraced by the many nouveau riche decorating their homes in China.

Very tacky.
Reply With Quote
     
     
  #346  
Old Posted Nov 28, 2024, 2:30 PM
KnoxfordGuy's Avatar
KnoxfordGuy KnoxfordGuy is offline
New Brunswick booster!
 
Join Date: Jan 2011
Location: Fredericton, New Brunswick
Posts: 2,228
Came across a drone shot of the site on Instagram.

__________________
Fredericton. Noble Daughter Of The Forest.
Reply With Quote
     
     
  #347  
Old Posted Nov 28, 2024, 3:18 PM
Nashe's Avatar
Nashe Nashe is offline
Registered User
 
Join Date: Feb 2009
Location: Moncton, NB
Posts: 3,074
Quote:
Originally Posted by Pugsley View Post
Sooo many conflicting architectural styles and eras jammed into one building. My head hurts.
"Hmmm... What architectural style did you say this was, again?"

"Yes!"
Reply With Quote
     
     
  #348  
Old Posted Nov 30, 2024, 4:19 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,389
Current status

Reply With Quote
     
     
  #349  
Old Posted Dec 10, 2024, 7:11 PM
homebody homebody is offline
Registered User
 
Join Date: Sep 2007
Location: Saint John, N.B.
Posts: 321
Any updated pictures out there? They must be done the foundation work now. Sure wish the City would move the Kings's Square webcam a bit so we could see progress! Probably should update the title to under construction from site prep.
Reply With Quote
     
     
  #350  
Old Posted Dec 10, 2024, 8:39 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,043
Posted online today by the city:

"Traffic Advisory: King Street
The City of Saint John would like to advise the public of the following traffic interruption that will begin December 11 on King Street. This work is necessary for infrastructure installation and upgrades required for a new development.

Street: King Street
Date: December 11, 2024
Duration: One (1) day
Time: 8:00 a.m. to 1:00 p.m.
Direction: Westbound
Action: Traffic reduced to one lane
Specific area: Between Charlotte Street and Germain Street

Description of work: Infrastructure installation and upgrades. Road signage and sidewalk directional signage will be in place. Motorists are asked to drive with caution and be aware of pedestrians and workers. Delays should be expected".
Reply With Quote
     
     
  #351  
Old Posted Dec 10, 2024, 10:02 PM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 590
Quote:
Originally Posted by DyAm00394 View Post
Posted online today by the city:

"Traffic Advisory: King Street
The City of Saint John would like to advise the public of the following traffic interruption that will begin December 11 on King Street. This work is necessary for infrastructure installation and upgrades required for a new development.

Street: King Street
Date: December 11, 2024
Duration: One (1) day
Time: 8:00 a.m. to 1:00 p.m.
Direction: Westbound
Action: Traffic reduced to one lane
Specific area: Between Charlotte Street and Germain Street

Description of work: Infrastructure installation and upgrades. Road signage and sidewalk directional signage will be in place. Motorists are asked to drive with caution and be aware of pedestrians and workers. Delays should be expected".
Maybe for a tower crane?
Reply With Quote
     
     
  #352  
Old Posted Dec 11, 2024, 6:25 PM
JakeNB JakeNB is offline
Registered User
 
Join Date: Sep 2018
Location: Saint John
Posts: 196
Quote:
Originally Posted by Leroy321 View Post
Maybe for a tower crane?
More likely they will be digging up some of the newly laid asphalt to do some underground work that should have been done before they finished the streetwork.
Reply With Quote
     
     
  #353  
Old Posted Dec 11, 2024, 9:04 PM
Sabien Sabien is online now
Registered User
 
Join Date: Jun 2008
Location: Saint John, NB
Posts: 169
Quote:
Originally Posted by homebody View Post
Any updated pictures out there? They must be done the foundation work now. Sure wish the City would move the Kings's Square webcam a bit so we could see progress! Probably should update the title to under construction from site prep.
Still pumping concrete - and they opened up the fencing and took down a tree... perhaps a good location for a large crane.

Reply With Quote
     
     
  #354  
Old Posted Dec 11, 2024, 11:27 PM
homebody homebody is offline
Registered User
 
Join Date: Sep 2007
Location: Saint John, N.B.
Posts: 321
Quote:
Originally Posted by Sabien View Post
Still pumping concrete - and they opened up the fencing and took down a tree... perhaps a good location for a large crane.

Thanks for the pics!
Reply With Quote
     
     
  #355  
Old Posted Dec 13, 2024, 7:10 PM
sailor734 sailor734 is online now
Registered User
 
Join Date: Apr 2023
Posts: 2,665
Talking to someone well connected to things uptown today......they were saying the city is getting pretty fed up with this project closing part or all of King St without any prior notice or communication with City Hall or the police.
Reply With Quote
     
     
  #356  
Old Posted Dec 14, 2024, 10:58 PM
bingun bingun is offline
Registered User
 
Join Date: Dec 2024
Posts: 1,229
Progress as of this morning.

Reply With Quote
     
     
  #357  
Old Posted Jan 19, 2025, 10:23 PM
sailor734 sailor734 is online now
Registered User
 
Join Date: Apr 2023
Posts: 2,665
I have been told that pouring concrete in the winter adds considerable costs. Maybe they are on hold until spring?
Reply With Quote
     
     
  #358  
Old Posted Jan 20, 2025, 1:31 AM
darkharbour darkharbour is offline
Registered User
 
Join Date: Jan 2021
Posts: 831
It's slow going, and I know it can be easy to show pessimism in the project, but I am certain there is more foundation present now than in those photos from a month ago.
Reply With Quote
     
     
  #359  
Old Posted Jan 20, 2025, 11:15 AM
sailor734 sailor734 is online now
Registered User
 
Join Date: Apr 2023
Posts: 2,665
I understand that foundation work is time consuming and doesn't show readily apparent progress the way structures actually going up do.

It does appear to me though that in general, projects in SJ often seem to advance at a slower pace than other cities. (I have no evidence to base this on but it certainly seems to be the case from casual observations)

Last edited by sailor734; Jan 20, 2025 at 12:43 PM.
Reply With Quote
     
     
  #360  
Old Posted Jan 20, 2025, 1:16 PM
nwalbert nwalbert is offline
Registered User
 
Join Date: Mar 2008
Posts: 805
Quote:
Originally Posted by darkharbour View Post
It's slow going, and I know it can be easy to show pessimism in the project, but I am certain there is more foundation present now than in those photos from a month ago.
Agreed, I went by yesterday and there is definitely progress. It is a BIG foundation.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 8:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.