HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 1, 2024, 8:21 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by YOWetal View Post
If the corridor is gone, and even if it'st here it would need a lot of grade seperation, why not avoid the turn south to Smith Falls and cut a new path further north through Missippi Mills and then through the forest to Peterbourgh with maybe something like the plan above giving options to even bypass that. The country may need a lot of grading work but avoiding expensive land aquisition might be a good trade off?
That's what I'm thinking they'll do. The original ROW, aside from being built over in the villages, is also way too curvy for 300km/h service - they'd have to do much straightening of it that it's basically building a new corridor anyway.

There's a hydro corridor that goes from Ottawa to the Darlington nuclear plant. You could basically build the train underneath it. It's almost a perfectly straight line in the rural bits:



You're not serving Fallowfield with that route, but you could have a station in Kanata. That's probably a more attractive suburban station location anyway.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.