HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #2621  
Old Posted Oct 18, 2024, 5:02 PM
LRTeverywhere LRTeverywhere is offline
Registered User
 
Join Date: Oct 2018
Posts: 326
Quote:
Originally Posted by Kitchissippi View Post
I wish they'd put baggage cars. I'm pissed off that they've reneged on carrying full-sized bikes on the corridor trains, they now only take folding bikes.
Have they reneged on this? I'm pretty sure they are just waiting until the full corridor fleet is running since they can't guarentee that all trains have the ability yet.
Reply With Quote
     
     
  #2622  
Old Posted Oct 18, 2024, 8:43 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,687
Quote:
Originally Posted by dougvdh View Post
I think that's interim since they can't seem to tell you what train type you'll be on at the time of booking. Once all the new rolling stock (Charger/Venture) is in service and the old trains are retired (LRC on the Quebec City - Windsor Corridor), then (hopefully) they'll transport bikes again.
The new trains are devoid of bike hooks that they advertised when they announced them. I remember seeing them in the promo videos and did not see them or found the space for them on the train.

I rode my bike to Quebec City a couple of months ago thinking that I'd take the train back. Nope, no can do. Orleans Express buses? No problem at all, at a way cheaper price.

The fact that VIA Rail is now weighing luggage and being picky about the amount of carry-on to the same degree as airlines gives me little faith that they'll allow full sized bikes even on the new fleet.
Reply With Quote
     
     
  #2623  
Old Posted Oct 18, 2024, 8:53 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,687
Quote:
Originally Posted by MarkR View Post
Yeah that was pretty crappy of them. I'd already been thinking of getting a good folder (Brompton now makes a 20"-wheel bike) for local use, and it would come in very handy travelling by Via.
I love my Brommie, I've taken it on the train to Montreal and Toronto with no issues. It's great on the LRT as well. The new 20" model is pricey, but if I ever get to Singapore, I'll search out a full titanium knock-off for about the same price
Reply With Quote
     
     
  #2624  
Old Posted Oct 25, 2024, 3:36 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by ponyboycurtis View Post
I don't know if I was just deaf, dumb, blind and stupid and fatigued from being in transit for a couple days but I swear there were no power outlets. Whether it was a USB or conventional plug I didn't see anything. I had a battery pack if I needed it so it wasn't much more than a cursory glance. SURELY I am mistaken on this?
I'm pretty sure I remember seeing them when I rode on the new fleet. I can't find a picture, but Rail Fans Canada says: power outlets (economy seats each get 1 USB, 1 120V outlet, while business seats get 2 of each)
__________________
Pronouns: He/Him/His
Reply With Quote
     
     
  #2625  
Old Posted Oct 28, 2024, 9:12 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,645
Please vote for us, please, please, pretty please...

Quote:
Federal government going ahead with high-speed rail between Quebec City and Toronto
Trains to reach speeds of up to 300 kilometres per hour

Louis Blouin · CBC News
Posted: Oct 28, 2024 4:34 PM EDT | Last Updated: 9 minutes ago


The Trudeau government will announce plans for a high-speed train linking Quebec City and Toronto in the coming weeks, Radio-Canada has learned.

Proponents of the project hope the train will take passengers from Montreal to Toronto in three hours. By car, it takes about five-and-a-half hours to travel between the two cities.

Sources told Radio-Canada the train will travel 300 kilometres per hour — double the speed of Via Rail's current trains.

Ottawa announced plans back in 2021 to build what it called a "high-frequency" (HFR) rail corridor with stops in Toronto, Peterborough, Ottawa, Montreal, Trois-Rivières, Laval and Quebec City. Sources told Radio-Canada the federal government has now decided the Toronto-Quebec City link will be high-speed.

The train would use a newly built, separate electrified track and run frequently. In addition to Quebec City, Montreal and Toronto, it would serve Trois-Rivières, Laval, Ottawa and Peterborough.

Sources told Radio-Canada the federal government has chosen a winning bidder out of three competing consortia and is expected to announce the news in the next few weeks.

A spokesperson for Transport Minister Anita Anand wouldn't confirm the news because the contract has not been awarded.


<more>


https://www.cbc.ca/news/politics/high-speed-rail-canada-1.7365835
Reply With Quote
     
     
  #2626  
Old Posted Oct 29, 2024, 12:09 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,300
Worked for Wynne. Oh wait...
Reply With Quote
     
     
  #2627  
Old Posted Oct 29, 2024, 12:30 AM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,732
Quote:
Originally Posted by Djeffery View Post
Worked for Wynne. Oh wait...
Didn't she win basically every riding where there would have been a stop between London and Union Station? (not saying that it was a big, or even little, factor). Along with cancelling the gas plants and still winning the next election it is an example of a fundamentally imature electorate.
Reply With Quote
     
     
  #2628  
Old Posted Oct 29, 2024, 2:02 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,300
Quote:
Originally Posted by YOWetal View Post
Didn't she win basically every riding where there would have been a stop between London and Union Station? (not saying that it was a big, or even little, factor). Along with cancelling the gas plants and still winning the next election it is an example of a fundamentally imature electorate.
Maybe I'm misremembering, since there were seemingly many announcements about rail, but I thought she made the boldest announcement in 2018 before getting decimated.
Reply With Quote
     
     
  #2629  
Old Posted Oct 29, 2024, 2:59 AM
rdaner rdaner is offline
Registered User
 
Join Date: May 2009
Posts: 307
Just a question about how this would be dealt with in Ottawa, theoretically. I have been to the VIA station and it would need an upgrade but where? Also if this went through it would Lead to a lot of development around the station.
Reply With Quote
     
     
  #2630  
Old Posted Oct 29, 2024, 3:22 AM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
How does it even work? They put out RFP for high-frequency rail and ended up with high-speed rail submissions? That doesn't make any sense.
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #2631  
Old Posted Oct 29, 2024, 3:33 AM
harls's Avatar
harls harls is online now
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Reply With Quote
     
     
  #2632  
Old Posted Oct 29, 2024, 11:10 AM
DarthVader_1961 DarthVader_1961 is offline
Registered User
 
Join Date: Jun 2009
Posts: 474
Believing it when I’m riding it
Reply With Quote
     
     
  #2633  
Old Posted Oct 29, 2024, 1:24 PM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 175
Quote:
Originally Posted by zzptichka View Post
How does it even work? They put out RFP for high-frequency rail and ended up with high-speed rail submissions? That doesn't make any sense.
Because of industry feedback during the RFEOI they modified the RFP to allow for the submission of both a conventional rail and a high-speed rail option from each consortium.
Reply With Quote
     
     
  #2634  
Old Posted Oct 29, 2024, 1:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
This all sounds great, but yes, it seems like a tactic to win votes, presenting this a year, maybe months, before the next election. Why didn't they work towards this years ago? Seems like a slam dunk for the environmental file, not to mention mobility and the economy. It's rainbows and unicorns like electoral reform; probably never going to happen. I hope it does though.
Reply With Quote
     
     
  #2635  
Old Posted Oct 29, 2024, 3:11 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Kelnoz View Post
Because of industry feedback during the RFEOI they modified the RFP to allow for the submission of both a conventional rail and a high-speed rail option from each consortium.
Not just allow, but insist that each consortium give them both.
__________________
Pronouns: He/Him/His
Reply With Quote
     
     
  #2636  
Old Posted Oct 29, 2024, 3:30 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by rdaner View Post
Just a question about how this would be dealt with in Ottawa, theoretically. I have been to the VIA station and it would need an upgrade but where?
What type of upgrade are you thinking that Ottawa station would need? There is a plan to raise the remaining platforms which would likely be implemented, but that doesn't require any additional land. As far as capacity, the current station's 4 through tracks and 4 terminal tracks (2 in each direction) should be more than enough. Don't forget that few trains will originate/terminate in Ottawa as most will continue on to Montreal or Toronto.

Quote:
Originally Posted by rdaner View Post
Also if this went through it would Lead to a lot of development around the station.
It probably won't have much effect as intercity rail isn't something people tend to take on a daily bases. There will be need for more passenger services, but most of that would be contained within the station.
__________________
Pronouns: He/Him/His
Reply With Quote
     
     
  #2637  
Old Posted Oct 29, 2024, 6:24 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Other than upgrading the infra to accommodate high speed trains, I doubt the station will need much work. They could add platforms where platforms once existed directly south of the existing platforms, but that's about it. I do hope the parking lots get redeveloped with hotels, residential and offices. Make it a mini Downtown, where travelers can stay as soon as they arrive. Strange no hotels have ever been built directly connected to the station.
Reply With Quote
     
     
  #2638  
Old Posted Oct 29, 2024, 10:41 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,797
Parking is a draw for those living at a distance without decent transit access. I have parked there a number of times. Without parking, I am less likely to choose VIA. I am poorly connected to Line 1.
Reply With Quote
     
     
  #2639  
Old Posted Oct 29, 2024, 10:55 PM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 11,314
Quote:
Originally Posted by lrt's friend View Post
Parking is a draw for those living at a distance without decent transit access. I have parked there a number of times. Without parking, I am less likely to choose VIA. I am poorly connected to Line 1.
That's a valid concern, but the better solution is to improve local and regional transit connectivity rather than to retain poor land use around intercity stations.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.
Reply With Quote
     
     
  #2640  
Old Posted Oct 30, 2024, 2:53 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,867
Quote:
Originally Posted by Nouvellecosse View Post
That's a valid concern, but the better solution is to improve local and regional transit connectivity rather than to retain poor land use around intercity stations.
Swiss Rail facilitates parking. It seems like a normal thing in train stations.

https://www.sbb.ch/en/tickets-offers/private-transport/car-parking.html
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.