HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 3, 2024, 8:36 PM
mcj mcj is offline
 
Join Date: Dec 2021
Posts: 1,286
Will be interesting to see how this affects Mission City Station. The access to the Mission Train bridge would require quite a bit of manoeuvring for a train to serve both Mission City in its current location and then head over to Chilliwack. It might make sense for the station to be relocated westward a bit and orient the platform to be on the south side of the tracks so the train wouldn't need to double back and go over 3 switches to get on the bridge.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:49 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.