HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 13, 2024, 3:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by OTownandDown View Post
lol, don't forget about 10km/hr once you've reached St Laurent and then all the way thru to Lees, then again at Rideau. Buddy was riding his bike faster than the train... When will THOSE speeds be increased again? While I'm on it, what was the originally specified end-to-end travel time for the full length?
End to end of Stage 1 Confed was 22 or 23 minutes when it opened. More like 30 minutes today. If they cut the freakin' dwell times to something reasonable, it would make a huge difference.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.