Moving the fantasy discussions here so the BIRT thread can remain free for discussions of actual news related to past and future studies.
Quote:
Originally Posted by officedweller
There's also precedent for avoiding an expensive underground transfer station when the Dunsmuir Station was deleted from the Canada Line, leaving the only transfer between Canada Line and Expo Line at Waterfront Station.
|
This may be good precedent, but it certainly isn't a shining example of cutting corners not having negative consequences decades after the fact. Transfers between the Expo and Canada Line are quite bad at Granville.
For someone travelling from Metrotown to YVR, they're looking at 44 minutes of train time and 5-10 minutes of transferring between the two. That's makes the trip 10%-20% longer! And for a traveler who is unfamiliar with the stations and carrying luggage, it may take even longer! And that's ignoring the fact that a direct transfer at Dunsmuir would have eliminated an extra three minutes of travel between Granville and Waterfront for Expo passengers.
These small details may seem trivial, but multiply them by thousands of passengers over decades, and suddenly the impact of doing the easy thing is quite large. The Canada Line would be substantially more useful with the City Centre station bumped northward directly overtop of Granville, and an additional station near, say, Granville and Nelson.
Quote:
Originally Posted by BaddieB
Even then, how would a station on the corner there work if it's curving there? Perhaps if they cut and cover along Albert instead of Hastings.
|
Perhaps the land isn't for a Purple Line station, and is instead meant to be the space needed to turn the elevated guideway 90 degrees. Or perhaps that land isn't meant to be used for the Purple Line at all, despite the city's explanation, and is reserved for a future Hastings Line (elevated or underground) stop.