Quote:
Originally Posted by chowhou View Post
The off street mobility lane is the westbound lane, but I believe it already exists. It's not great IMO but honestly I never cycle up 3rd anyway, I prefer taking the Spirit Trail.
Westbound for cyclists is a combination of an on-street lane until the Spirit Trail pedestrian and then a shared pathway until Queensbury.

I am not concerned about the entire section being mixed use because most cyclists will hardly be going faster than a pedestrian up the hill (except e-bikes). But the pathway does need to be wide enough for comfortable passing, which a large portion of the current shared pathway is not.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
  #162  
Old Posted Sep 15, 2023, 4:55 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Reply With Quote
     
     
  #163  
Old Posted Sep 22, 2023, 4:17 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
We're conducting night work along Cotton Rd, Gladstone Ave and Low Level Rd tonight, Sept. 21 for pavement milling + Sept. 22 for asphalt paving, both beginning at 7pm.


https://twitter.com/CityOfNorthVan/status/1704967915273925057/photo/1
Reply With Quote
     
     
  #164  
Old Posted Sep 24, 2023, 12:01 AM
ahdede ahdede is offline
Registered User
 
Join Date: Dec 2020
Posts: 7
Quote:
Originally Posted by chowhou View Post

Here's a semi-fantasy map I quickly drew up that I think makes sense. Yellow squares being stations to be built immediately, black yellow outline squares being future stations, red being above ground alignment, green being below ground alignment, red loop being the OMC. The crossing of the Millennium Line in the Still Creek Area also has space for the opportunity to have the viaducts connect if that is more convenient for maintenance or sharing rolling stock
Been lurking on the forums for years, somehow missed this thread. Glad to see this alignment brought up as I have also pondered on it in my own crayonings. I grew up and still live in Burnaby so I know the geography (and politics) of the city quite well.

Given that implementing BRT is the first phase of the line, I could see a dedicated bi-level transit bridge being built from Phibbs to N Boundary Rd and have BRT continue down to Hastings and Willingdon. Another route would be Boundary -> Lougheed -> Willingdon.

The second phase would see the rail portion built on the lower deck of the bridge, then tunnel down Boundary before emerging near Douglas/Boundary, The line would then go diagonally towards Gilmore station, continue diagonally through Still Creek towards Willingdon interchange, then along Willingdon to Metrotown and beyond. This alignment would also have it closer to potential OMC at the bus depot as you suggested.



7 stations: Phibbs, Boundary, Gilmore, BCIT, Grange, Metrotown, Central Park with expansion infill stations contingent on redevelopment at 1st Ave/Boundary, Still Creek (Brentwood South), and Moscrop/Deer Lake Pkwy
Reply With Quote
     
     
  #165  
Old Posted Sep 27, 2023, 8:09 PM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 382
The power lines around Horne Payne substation and all the way down Boundary I can imagine might be one of the challenges associated with such a routing.
Reply With Quote
     
     
  #166  
Old Posted Sep 27, 2023, 9:18 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Welcome aboard!

You're going to need another station at Burnaby Heights - it's a commercial village and major transit corridor, plus there's the PNE a few blocks due west.
Reply With Quote
     
     
  #167  
Old Posted Sep 27, 2023, 9:21 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
I think there's almost zero chance the Skytrain routing swings to Boundary Road because the re-development opportunity versus that stretch of Willingdon/E Hastings is more limited.

I think the idea of going up Boundary from Hastings might work but I guess it depends on what the long term plans for the bridge is going to be.
Reply With Quote
     
     
  #168  
Old Posted Sep 27, 2023, 9:28 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,725
I've mentioned a similar routing before.
I would tunnel under Boundary then Douglas and down Gilmore, to stay away from as much boggy lands as possible.
When crossing eastwards from Gilmore Station, you would want to minimize proximity to Still Creek, due to boggy soils and riparian habitat setbacks and environmental concerns, so I have previously favoured continuing south along Gilmore and crossing TCH near the Gilmore overpass, then working over to Willingdon - either along Canada Way or cutting through the lands north or south of Canada Way.
Reply With Quote
     
     
  #169  
Old Posted Sep 27, 2023, 10:04 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,797
The purple line is going down willingdon to hastings.

Also, the city is already talking about new developments at hastings to accommodate stations





https://dailyhive.com/vancouver/north-shore-skytrain-burnaby-metrotown
__________________
i have no idea what's going on
Reply With Quote
     
     
  #170  
Old Posted Sep 27, 2023, 10:45 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,801
Quote:
Originally Posted by ahdede View Post
Been lurking on the forums for years, somehow missed this thread. Glad to see this alignment brought up as I have also pondered on it in my own crayonings. I grew up and still live in Burnaby so I know the geography (and politics) of the city quite well.

Given that implementing BRT is the first phase of the line, I could see a dedicated bi-level transit bridge being built from Phibbs to N Boundary Rd and have BRT continue down to Hastings and Willingdon. Another route would be Boundary -> Lougheed -> Willingdon.

The second phase would see the rail portion built on the lower deck of the bridge, then tunnel down Boundary before emerging near Douglas/Boundary, The line would then go diagonally towards Gilmore station, continue diagonally through Still Creek towards Willingdon interchange, then along Willingdon to Metrotown and beyond. This alignment would also have it closer to potential OMC at the bus depot as you suggested.



7 stations: Phibbs, Boundary, Gilmore, BCIT, Grange, Metrotown, Central Park with expansion infill stations contingent on redevelopment at 1st Ave/Boundary, Still Creek (Brentwood South), and Moscrop/Deer Lake Pkwy
I thought about Boundary too but I think there's at least four serious issues with that alignment.

1. The harbour crossing
It looks to me like a Boundary Road aligned crossing of Burrard Inlet would be fouled by the power lines, particularly on the north side of the harbour. This could be remedied by having the crossing further to the east, but at that point why swing back to Boundary? This is part of why I chose the Gilmore alignment and Ingleton crossing location. It's the narrowest part of the Second Narrows,and isn't fouled by anything else (besides the water mains but they shouldn't be an issue I think).

2. The tunnel
For crossing Burnaby/Vancouver Heights it's inevitable that there will be tunneling since the elevation gain between the North Shore and the Heights is just too much for above grade construction all the way. It's not abundantly clear to me if the power line foundations make this idea less viable or not. Tunneling down Gilmore shouldn't too concerning, nothing with serious foundations along the route.

3. OMC access
Boundary is actually several metres below the Burnaby Transit Centre which puts a bit of a kibosh on this idea if the route is tunneled at this point. However, if somehow the route is above ground here this does become viable. Gilmore on the other hand is several metres above the Burnaby Transit Centre, and in fact a tunnel portal could be built beneath Ingleton and it would be almost a perfect alignment.

4. Future growth
The biggest gap in the Expo Line is between Commercial-Broadway and Main Street-Science World. There just aren't really any destinations or origins for transit in the industrial area along Terminal. Boundary is kind of the same, it's not very likely that there will be many transit trips to the car and motorcycle dealerships or auto shops. Gilmore just has more people and potential future people.

If it wasn't for these concerns, Boundary does actually look a bit more appealing than Gilmore, since the Burnaby Heights tunnel could actually have its south portal at Boundary and Francis for an even cheaper and faster project.

Quote:
Originally Posted by djmk View Post
The purple line is going down willingdon to hastings.
The Purple Line is a high level concept, not necessarily an exact route. It would be a little silly for a Skytrain line which is intended to move passengers between the North Shore and the rest of the Lower Mainland to needlessly meander through Burnaby Heights just because of the existing road system. Especially since the line pretty much has to be tunneled through The Heights due to the local topography (it's called The Heights for a reason), there's no reason to be constrained to the existing roads and bus routes. On top of that, given that the Hastings corridor is considered a candidate for future rapid transit, it's also a waste to have redundant service along Hastings in the future.

(Not to mention the purple line alignment seems to completely skip Lonsdale Quay and has the inlet crossing to the west of the Second Narrows which makes very little sense to me.)

Quote:
Also, the city is already talking about new developments at hastings to accommodate stations
Source for this? Are you sure they aren't thinking longer term about the future Hastings rapid transit?
Reply With Quote
     
     
  #171  
Old Posted Sep 27, 2023, 10:52 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Not sure of the depth but I guess the Thornton Tunnel would be a consideration as well.



https://www.geocaching.com/geocache/GC1R307
Reply With Quote
     
     
  #172  
Old Posted Sep 27, 2023, 10:58 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,801
Quote:
Originally Posted by jollyburger View Post
Not sure of the depth but I guess the Thornton Tunnel would be a consideration as well.



https://www.geocaching.com/geocache/GC1R307
I think there's approximately a roughly zero percent chance (give or take) that CN gives up the Thornton tunnel. Considering the recent rail yard expansions on the north end, and the recent triple tracking of the south end, I'm sure CN wishes it had three or four of the single tracked Thornton Tunnel nowadays. The Second Narrows rail bridge also rises to allow shipping traffic through the Second Narrows. Not super viable for a high frequency rail network.
Reply With Quote
     
     
  #173  
Old Posted Sep 27, 2023, 11:01 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by chowhou View Post
I thought about Boundary too but I think there's at least four serious issues with that alignment.

Source for this? Are you sure they aren't thinking longer term about the future Hastings rapid transit?
They only really talked about the Willingdon section.

Quote:
"The purple alignment supports Burnaby's land use framework by connecting directly to Brentwood Town Centre, BCIT and the Metrotown Town Centre along the Willingdon corridor.

"The purple alignment is highly supportive of Connecting Burnaby. Connecting Burnaby identifies the Willingdon Corridor as an area for "Transit Priority Measures / study corridor for Rapid Bus or better" (Burnaby Public Transit Network Priority map). Improved public transit along this corridor would not only bring transit ridership benefits, but would also reinforce and support active transport investment and mode share goals along the route."
https://www.burnabynow.com/local-news/bu...-through-brentwood-and-metrotown-5024779

https://pub-burnaby.escribemeetings.com/...%20now%3A%20outbound&utm_medium=referral
Reply With Quote
     
     
  #174  
Old Posted Sep 27, 2023, 11:02 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by chowhou View Post
I think there's approximately a roughly zero percent chance (give or take) that CN gives up the Thornton tunnel. Considering the recent rail yard expansions on the north end, and the recent triple tracking of the south end, I'm sure CN wishes it had three or four of the single tracked Thornton Tunnel nowadays. The Second Narrows rail bridge also rises to allow shipping traffic through the Second Narrows. Not super viable for a high frequency rail network.
I didn't mean for usage by rapid transit I just meant they would have to work around it for any tunnels/crossing.
Reply With Quote
     
     
  #175  
Old Posted Sep 27, 2023, 11:10 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,801
Quote:
Originally Posted by jollyburger View Post
They only really talked about the Willingdon section.
Guess it's on djmk to explain what they mean by accommodating stations on Hastings then.

Quote:
Originally Posted by jollyburger View Post
I didn't mean for usage by rapid transit I just meant they would have to work around it for any tunnels/crossing.
My mistake, I think the Thornton Tunnel is extremely deep relative to Burnaby Heights and even where it crosses Gilmore. I don't think it's an issue.

Last edited by chowhou; Sep 28, 2023 at 12:10 AM.
Reply With Quote
     
     
  #176  
Old Posted Sep 27, 2023, 11:17 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Quote:
Originally Posted by djmk View Post
The purple line is going down willingdon to hastings. Also, the city is already talking about new developments at hastings to accommodate stations.
Yeah, the route is already a done deal and connecting with Millennium Line only makes sense at Brentwood station, not Gilmore. I also really hope stations in Burnaby Heights will not result in another boring tower cluster going up and the area can retaint its current character.
Reply With Quote
     
     
  #177  
Old Posted Sep 28, 2023, 12:01 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,053
Quote:
Originally Posted by Migrant_Coconut View Post
Welcome aboard!

You're going to need another station at Burnaby Heights - it's a commercial village and major transit corridor, plus there's the PNE a few blocks due west.

Looking at the tunnel map below, even if only on a temporarily schematic basis, it seems that where it crosses Hastings, it would be very close to Kootenay Loop. Could it complement or supplant it?


Quote:
Originally Posted by jollyburger View Post
Not sure of the depth but I guess the Thornton Tunnel would be a consideration as well.



https://www.geocaching.com/geocache/GC1R307
If the Thornton Tunnel is not viable due to the needs of CN rail, is it feasible to drill another tunnel such as the one on Evergreen under Burnaby Mountain? A tunnel under Gilmore was mentioned.
Reply With Quote
     
     
  #178  
Old Posted Sep 28, 2023, 12:01 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,801
Quote:
Originally Posted by Klazu View Post
Yeah, the route is already a done deal and connecting with Millennium Line only makes sense at Brentwood station, not Gilmore. I also really hope stations in Burnaby Heights will not result in another boring tower cluster going up and the area can retaint its current character.
I am of the opinion that it's close to a done deal that the North Shore Skytrain will take the Second Narrows crossing and run south from there towards Metrotown, but I don't agree that anything else is a done deal at this stage.
Reply With Quote
     
     
  #179  
Old Posted Sep 28, 2023, 12:08 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Quote:
Originally Posted by jollyburger View Post
Not sure of the depth but I guess the Thornton Tunnel would be a consideration as well.
I like the out-of-box thinking, but there is no chance of this happening due to how much usage the rail line sees. Another challenge would also be the eventual spur line towards Downtown, as the tunnel ends right at bridge across Second Narrows. A brand new bridge would also need to be built (that seems to be a given in all scenarios), as it is currently one-lane just like the tunnel.

The main problem is just that it is not the best alignment for such such an important transit line. I am really happy that Purple Line is seeing real support, as it would be a game-changer for connecting our region. It could also actually get some people out of their cars.
Reply With Quote
     
     
  #180  
Old Posted Sep 28, 2023, 12:14 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
It also skips all of Hastings and the M-Line (unless TransLink is willing to make a very costly retrofit to allow a station in the tunnel).
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.