Quote:
Originally Posted by jollyburger
But it's 510 in total with all the options? Excluding the pilot orders.
106 40-foot
Option 1)
Additional 201 40-foot
Option 2)
Additional 203 60-foot
|
It depends what they mean when they say option 1 and option 2. It could mean that they're looking at getting 106 40-foot trolleys, and then either 201 more (option 1) or 203 60-foot buses (option 2). But if they're going to 510 in total, then that would suggest they're considering what they said last year, and putting trolleys on the rapid bus routes.
As they're electrifying the rest of the fleet, they could presumably run battery local buses and trolley rapid and express, on the same street. I can't get my head around running rapid trolley buses and local trolley buses on the same street - they would seem to be incompatible, although maybe I'm missing some obvious way of having them both work efficiently.