  #4081  
Old Posted Mar 18, 2024, 3:55 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 956
Looks great! Much nicer than all four of the other Richmond stations.
Reply With Quote
     
     
  #4082  
Old Posted Mar 18, 2024, 7:57 PM
teriyaki teriyaki is offline
Registered User
 
Join Date: Nov 2008
Posts: 606
Quote:
Originally Posted by idunno View Post
Looks great! Much nicer than all four of the other Richmond stations.
Indeed. Easily the classiest looking station out of all the above-ground stations. That dark-black contrasting with the wood paneling excellent. Also love the little protruding "T" Translink sign design detail there.

Do we know if there was any design for dedicated drop-off/pick-up spots or roadway re-design in or around the station?

Edit: Found this, but its not very detailed in that aspect:
Reply With Quote
     
     
  #4083  
Old Posted Mar 18, 2024, 9:07 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,817
Quote:
Originally Posted by teriyaki View Post
Indeed. Easily the classiest looking station out of all the above-ground stations. That dark-black contrasting with the wood paneling excellent. Also love the little protruding "T" Translink sign design detail there.

Do we know if there was any design for dedicated drop-off/pick-up spots or roadway re-design in or around the station?

Edit: Found this, but its not very detailed in that aspect:
There's a kiss and ride in the corner but not sure how the access will work to it.
Reply With Quote
     
     
  #4084  
Old Posted Mar 18, 2024, 11:16 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Maybe a right turn from No. 3 Rd.

The black paneling will show bird poop - so hopefully it'll be cleaned.
Reply With Quote
     
     
  #4085  
Old Posted Mar 19, 2024, 1:27 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by officedweller View Post
The black paneling will show bird poop - so hopefully it'll be cleaned.
You think they clean the outside of stations so they look nice
Reply With Quote
     
     
  #4086  
Old Posted Apr 19, 2024, 2:59 AM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,908
Quote:
Originally Posted by chowhou View Post
(snip)
Update on the Brentwood Town Centre Station renovations: Absolutely no update since January. Makes me wonder if Translink got the occupancy permit and decided, "Good enough!"







The stupid tiny home walkway is still thriving.



Reply With Quote
     
     
  #4087  
Old Posted Apr 19, 2024, 5:43 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i mean, it works i guess... wont last long term though.
Reply With Quote
     
     
  #4088  
Old Posted Apr 19, 2024, 6:11 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Different contractors? Perhaps the work had to be split up pre and post elevator install for the sake of scheduling and delay tolerance.
Reply With Quote
     
     
  #4089  
Old Posted Apr 19, 2024, 7:12 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 770
Now that the elevator on the south side of the station is complete, they've been doing work on the stairs and elevator on the north side of the station. They're also still in the process of adding new escalators, so I suspect the project as a whole is nowhere near completion.

It wouldn't surprise me if the hoarding around the south elevator entrance is because of electrical cables running overhead to support the escalator installation work.
Reply With Quote
     
     
  #4090  
Old Posted May 8, 2024, 4:32 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,817
Someone said the side entrance on the Chinatown station near Beatty has been closed for a while because of some problem with the metal awning over the entrance not being secure.

https://www.reddit.com/r/vancouver/comments/1cl9xqm/has_this_chinatown_skytrain_entrance_ever_been/
Reply With Quote
     
     
  #4091  
Old Posted May 8, 2024, 5:03 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,342
Quote:
Originally Posted by jollyburger View Post
Someone said the side entrance on the Chinatown station near Beatty has been closed for a while because of some problem with the metal awning over the entrance not being secure.

https://www.reddit.com/r/vancouver/comments/1cl9xqm/has_this_chinatown_skytrain_entrance_ever_been/
The horizontal beam detached from the wall about 6 months ago. The station had most of the roof glazing replaced over the past 2 years, but this side of the building hasn't had any work done yet. It's part way down the big staircase from Beatty down to the globe circle outside T&T. I'm not sure if they'll have to remove the entire roof, or whether that can install something more substantial to support the beam on either side. It probably depends on how corroded the beam is - the fixtures into the concrete have obviously rusted out.
Reply With Quote
     
     
  #4092  
Old Posted May 8, 2024, 7:31 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 770
Can't find any news post about this work at Edmonds beyond the station access alert on TransLink's website, but it's being highlighted on the platform-level displays in stations.

Quote:
Edmonds Station footbridge connecting westbound and eastbound platforms is undergoing maintenance starting May 13 for approx. 4 weeks.

The footbridge will remain open but at a reduced width. Customers crossing the bridge may have to form single file to cross the bridge in either direction.

From May 13 to May 24 the elevators will be inaccessible due to this maintenance.
Posted 7-May-2024 7:26 am on https://www.translink.ca/alerts

I realize all these projects need to be done, but it seems like less-than-ideal timing to be doing this at the same time that King George Station is closed and they're single-tracking through the OMC4 construction.
Reply With Quote
     
     
  #4093  
Old Posted May 8, 2024, 7:52 PM
Stainer Stainer is offline
Registered User
 
Join Date: Jan 2024
Posts: 58
Quote:
Originally Posted by dpogue View Post
Can't find any news post about this work at Edmonds beyond the station access alert on TransLink's website, but it's being highlighted on the platform-level displays in stations.


Posted 7-May-2024 7:26 am on https://www.translink.ca/alerts

I realize all these projects need to be done, but it seems like less-than-ideal timing to be doing this at the same time that King George Station is closed and they're single-tracking through the OMC4 construction.
That's probably to do with the gap/lip that has opened up in the floor there. There's been a caution sign there for at least the last 6 months.
Reply With Quote
     
     
  #4094  
Old Posted May 8, 2024, 8:00 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
This sounds like a minor inconvenience at the worst, there shouldn’t be any need to coordinate with the other projects.
Reply With Quote
     
     
  #4095  
Old Posted May 8, 2024, 8:51 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Quote:
Originally Posted by madog222 View Post
This sounds like a minor inconvenience at the worst, there shouldn’t be any need to coordinate with the other projects.
A minor inconvenience to "Able bodied people" but a major inconvenience to the disabled who have to back track either Royal Oak or go past Edmonds get off at 22nd St and then take the eleavator down then go to the other elevator and then go back up and finally get on a train. That is a major inconvenience to the disabled community.

The Foot bridge has made the east bound flatform completely closed off to there disabled community.
Reply With Quote
     
     
  #4096  
Old Posted May 9, 2024, 12:43 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,680
Quote:
Originally Posted by Mac Write View Post
A minor inconvenience to "Able bodied people" but a major inconvenience to the disabled who have to back track either Royal Oak or go past Edmonds get off at 22nd St and then take the eleavator down then go to the other elevator and then go back up and finally get on a train. That is a major inconvenience to the disabled community.

The Foot bridge has made the east bound flatform completely closed off to there disabled community.
Would a handidart shuttle work better?
Reply With Quote
     
     
  #4097  
Old Posted May 9, 2024, 5:29 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by Mac Write View Post
A minor inconvenience to "Able bodied people" but a major inconvenience to the disabled who have to back track either Royal Oak or go past Edmonds get off at 22nd St and then take the eleavator down then go to the other elevator and then go back up and finally get on a train. That is a major inconvenience to the disabled community.

The Foot bridge has made the east bound flatform completely closed off to there disabled community.
I meant for closing half of the walkway, though obviously if it was already in such a state that it wasn't usable that is irrelevant.
Reply With Quote
     
     
  #4098  
Old Posted May 9, 2024, 7:22 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Quote:
Originally Posted by cganuelas1995 View Post
Would a handidart shuttle work better?
No as it would be one bus at 15 minute intervals and they have to load you secure you, then drive to the next station. it would add 30 minutes to the trip. May as well take a slower bus to another station again 30+ minutes at best.
Reply With Quote
     
     
  #4099  
Old Posted Jun 2, 2024, 11:13 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,858
2024, May 31

Brentwood, north side

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #4100  
Old Posted Aug 6, 2024, 11:39 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
More early closures of Canada Line for Capstan Station construction

Quote:
...
Similar to the previous prolonged periods of early closures over the past two years, the segment of the Canada Line between Bridgeport Station and Richmond-Brighouse Station will close early on weekdays from Tuesday, August 6 to Friday, August 30, 2024.

Train services on this segment of the Canada Line will end about four hours early at 9:30 pm. As usual, TransLink will deploy extra bus service linking the impacted stations of Bridgeport, Aberdeen, Lansdowne, and Richmond-Brighouse, with these buses running about every 10 minutes.
...
A TransLink bulletin states August 2024’s round of early closures will enable crews to conduct electrical integration and connection works of Capstan Station to the existing Canada Line system.
https://dailyhive.com/vancouver/canada-line-capstan-station-construction-early-closure-august-2024
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:14 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.