  #7881  
Old Posted Dec 5, 2023, 6:41 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
... or they could be planning that future extension through Abbotsford and Chilliwack all the way to Hope!
     
     
  #7882  
Old Posted Dec 5, 2023, 2:38 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
The switch configuration at Langley City Centre (203rd) is the same as the configuration at Lafarge Lake - Douglas, which allows trains to arrive and depart from both of the platforms fairly easily without needing to turn around in a tail track behind the station.
     
     
  #7883  
Old Posted Dec 5, 2023, 3:12 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by Hotwax View Post
Yawn what a let down, big news is choosing names. For all the hype it sounded like it might be something more substantial like the award of one or more of the three build contracts that would actually get this project moving.

As late as last April gov was saying "contract award is anticipated in late 2023".

Source: BC Gov News Release - Firms shortlisted for Surrey Langley SkyTrain systems, track work contract April 25, 2023

Technically a few more weeks left for that, I suppose.
     
     
  #7884  
Old Posted Dec 5, 2023, 5:20 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
Quote:
Originally Posted by Jimbo604 View Post
Yawn what a let down, big news is choosing names. For all the hype it sounded like it might be something more substantial like the award of one or more of the three build contracts that would actually get this project moving.

As late as last April gov was saying "contract award is anticipated in late 2023".

Source: BC Gov News Release - Firms shortlisted for Surrey Langley SkyTrain systems, track work contract April 25, 2023

Technically a few more weeks left for that, I suppose.
This is exactly the sort of tendering process that will be announced on Dec 31.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7885  
Old Posted Dec 23, 2023, 5:12 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 512
Guideway contract was awarded today, not sure when it will be publicly announced.
__________________
Vancouver born and raised | My Flickr
     
     
  #7886  
Old Posted Dec 24, 2023, 2:10 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Thanks for the scoop!
__________________
Build transit and stuff around it.
     
     
  #7887  
Old Posted Jan 2, 2024, 3:05 AM
Hotwax's Avatar
Hotwax Hotwax is offline
Registered User
 
Join Date: Mar 2011
Location: Metro Vancouver
Posts: 183
     
     
  #7888  
Old Posted Jan 3, 2024, 7:38 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
anyone know if they need to raise or underground their transmission lines that cross fraser highway?
     
     
  #7889  
Old Posted Jan 3, 2024, 7:40 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Quote:
Originally Posted by VancouverOfTheFuture View Post
anyone know if they need to raise or underground their transmission lines that cross fraser highway?
I think that was already done last year.
     
     
  #7890  
Old Posted Mar 2, 2024, 1:28 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888





Src: https://dailyhive.com/vancouver/surrey-langley-skytrain-before-after-future

Daily Hive has a new article with more "current vs. artistic impressions of future" comparisons than you can shake a stick at.

Three construction contracts still not awarded.. sometime soon, hopefully, if construction is to actually start this year.
     
     
  #7891  
Old Posted Mar 2, 2024, 1:56 AM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,195
Quote:
Originally Posted by Jimbo604 View Post
Three construction contracts still not awarded.. sometime soon, hopefully, if construction is to actually start this year.
Quote:
Originally Posted by Vantage View Post
Guideway contract was awarded today, not sure when it will be publicly announced.
Seems like Vantage knew about at least one being awarded in December but not publicly announced. Perhaps they're still negotiating at least one of the remaining two?

The Guideway contract is described in the business case as: "[the Guideway contract] is high in value (approximately $1B) and more complex in terms of scope and risk transfer."

So if Vantage is correct, then at least the most high value and complex contract is out of the way. Wouldn't imagine the Stations & Propulsion Power Substations and Trackwork & Systems contracts need to start right away anyways, so a delay signing them by a few months shouldn't have an effect on project delivery (hopefully).
     
     
  #7892  
Old Posted Mar 2, 2024, 2:46 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,179
Officially we still have just over two weeks left of winter for them to sign/announce the stations contract.
     
     
  #7893  
Old Posted Mar 2, 2024, 5:01 AM
kja384 kja384 is offline
Registered User
 
Join Date: Jul 2023
Posts: 231
Looks amazing, I'm so exited, such a deserved project. Hope they extend it down KGB soon as well. Surrey council approved a once in a lifetime development a few months ago, tons of potential of affordable homes in this area.

https://www.northdeltareporter.com/local...ment-buildings-project-in-newton-7118602
     
     
  #7894  
Old Posted Mar 3, 2024, 10:53 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 512
Quote:
Originally Posted by mcj View Post
So if Vantage is correct, then at least the most high value and complex contract is out of the way. Wouldn't imagine the Stations & Propulsion Power Substations and Trackwork & Systems contracts need to start right away anyways, so a delay signing them by a few months shouldn't have an effect on project delivery (hopefully).
I hope I was correct when I said that. I have high trust in my source.
__________________
Vancouver born and raised | My Flickr
     
     
  #7895  
Old Posted Mar 8, 2024, 1:48 AM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,782
Quote:
Originally Posted by Vantage View Post
Guideway contract was awarded today, not sure when it will be publicly announced.
Guideway contract was finally (I think?) announced today:

https://globalnews.ca/news/10343223/surrey-langley-skytrain-proponent/

Quote:
Early work to start on Surrey-Langley SkyTrain line guideway build team named

The Surrey-Langley SkyTrain project is inching closer to construction.

On Thursday, the province revealed it had selected SkyLink Guideway Partners as its preferred proponent to design, build and finance the project’s elevated guideway and associated roadworks and utilities.

The consortium includes Dragados Canada, Ledcor Investments, Ledcor Mining and SYSTRA International Bridge Technologies.

The province remains in final contract negotiations with the group, but the Ministry of Transportation said the consortium is already set to begin early work preparing for major construction.

That work includes geotechnical investigations, identifying utilities and clearing vegetation.

The project will be built under three separate contracts.

The province remains in talks over bids to build eight new stations along the line and to install electrical systems and trackwork.

When complete, the 16-kilometre extension to the SkyTrain Expo Line will link King Goerge Station to Langley City Centre.

The $4.01-billion extension is slated to open in 2028.
King "Goerge" station by the way, I heard he was German!
     
     
  #7896  
Old Posted Mar 8, 2024, 5:42 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i thought it was interesting that the longest single-seat ride on the NYC Subway is about 52km, A train. going from downtown Langley - Waterfront would be about 42km.

i know some people say this is commuter rail territory, but i think it works with SkyTrain since the frequencies are so good since they dont need all those drivers.
     
     
  #7897  
Old Posted Mar 8, 2024, 8:27 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,144
Quote:
Originally Posted by VancouverOfTheFuture View Post
i thought it was interesting that the longest single-seat ride on the NYC Subway is about 52km, A train. going from downtown Langley - Waterfront would be about 42km.

i know some people say this is commuter rail territory, but i think it works with SkyTrain since the frequencies are so good since they dont need all those drivers.
The inevitable counterpoint is that Manhattan, et al are much bigger cities than Vancouver.

The inevitable counter-counterpoint is that in this case, it's better to build big and grow into it - we already learned with the Canada Line that the demand is there.
     
     
  #7898  
Old Posted Mar 8, 2024, 10:55 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by VancouverOfTheFuture View Post
i thought it was interesting that the longest single-seat ride on the NYC Subway is about 52km, A train. going from downtown Langley - Waterfront would be about 42km.

i know some people say this is commuter rail territory, but i think it works with SkyTrain since the frequencies are so good since they dont need all those drivers.
Ultimately the length of a network end-to-end does not promise that a rider will ever want to do the full length. It's just that way because short turning imposes more wear on the switches, and in a non-automated system, there's the possibility for human error.

Realistically, The Skytrain could run all the way out to hope and Whistler if there was a financial incentive to do so. There just isn't.
     
     
  #7899  
Old Posted Mar 8, 2024, 1:17 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,978
Langley is about the eastern extent Skytrain should ever go. Further out would better be served by commuter rail, and one day if the population / density warrants it Abbotsford can have its own internal urban rail system.

Squamish for sure is commuter rail territory, not Skytrain. Horseshoe Bay is perhaps the furthest in that direction Skytrain could ever realistically go (and even there I feel commuter rail would be better)

Tswwassen and even White Rock are areas that are also far better suited for commuter rail than Skytrain.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7900  
Old Posted Mar 8, 2024, 4:41 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,624
Is 2028 realistic? That will be only 2 years after the Arbutus extension. Great if it works out.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.