  #1801  
Old Posted Mar 3, 2024, 11:04 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
Quote:
Originally Posted by Kelnoz View Post
It looks like they're doing work on the old road along the shoreline to convert it into a pathway. Isn't that a pile driver next to it closer to the river?
Maybe. Not sure why a crane would be needed though.
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1802  
Old Posted Mar 4, 2024, 12:16 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 393
Quote:
Originally Posted by zzptichka View Post
Maybe. Not sure why a crane would be needed though.
Crane is needed to handle the materials to hoist over to the pile rig.
Reply With Quote
     
     
  #1803  
Old Posted Mar 14, 2024, 5:33 PM
Afurtado Afurtado is offline
Registered User
 
Join Date: Oct 2023
Posts: 22
*
Site Image From March 5, 2024

Image showing raised bike paths inside the bridge and new pedestrian path outside of the bridge.

[
Reply With Quote
     
     
  #1804  
Old Posted Apr 17, 2024, 12:10 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Reply With Quote
     
     
  #1805  
Old Posted Apr 17, 2024, 12:56 AM
Har13 Har13 is offline
Registered User
 
Join Date: Nov 2020
Posts: 184
Wonder which building they will start next.
Reply With Quote
     
     
  #1806  
Old Posted Apr 17, 2024, 2:10 AM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,976
the red metal cladding on the office building is taking forever to complete. They must've ran out or something!
Reply With Quote
     
     
  #1807  
Old Posted Apr 17, 2024, 2:20 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by SL123 View Post
the red metal cladding on the office building is taking forever to complete. They must've ran out or something!
Maybe the same supplier as 412 Sparks and The Clemow Those are both having incredible delays in cladding.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1808  
Old Posted Apr 17, 2024, 2:29 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Heck, even East Flats and Adisoke have been painfully slow. Feels like Parkdale Collective and Releve are the only projects that haven't had any issues with cladding.
Reply With Quote
     
     
  #1809  
Old Posted Apr 17, 2024, 3:27 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896


Zibi is slow, but I can see the vision coming together.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1810  
Old Posted Apr 17, 2024, 10:39 AM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,976
Quote:
Originally Posted by Harley613 View Post
Zibi is slow, but I can see the vision coming together.
I can see a vision on the Ontario side not so much on the Quebec side.
Reply With Quote
     
     
  #1811  
Old Posted Apr 17, 2024, 2:11 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,636
When does the next Ontario tower start? One would think excavation would be well underway by now.
Reply With Quote
     
     
  #1812  
Old Posted Apr 17, 2024, 2:22 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
Quote:
Originally Posted by OTownandDown View Post
When does the next Ontario tower start? One would think excavation would be well underway by now.
Went by the Zibi house a week or so ago and the woman working there told me they'll be breaking ground on block 204 this spring. So maybe May?

__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1813  
Old Posted Apr 19, 2024, 11:09 AM
skisail_ott skisail_ott is offline
Registered User
 
Join Date: Sep 2019
Location: Ottawa
Posts: 49
Block 204 is next, but I don’t think it can start until 207 and 206 are finished and Ledcor clears out. Remember that Zibi announced a new contractor for 204 - Westview Projects.
Reply With Quote
     
     
  #1814  
Old Posted May 6, 2024, 6:37 PM
Afurtado Afurtado is offline
Registered User
 
Join Date: Oct 2023
Posts: 22
*
Site Images from May 4th, 2024

Newly opened North Shore Park



















Reply With Quote
     
     
  #1815  
Old Posted May 6, 2024, 10:35 PM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Thanks for the pics. Finished product looks very good honestly. Can't wait to head over there.
Reply With Quote
     
     
  #1816  
Old Posted May 7, 2024, 1:23 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,645
Park looks awesome. We don't have enough interaction with developments and the waterfront in Ottawa. Reminds me of some of the waterfront parks in Toronto like Sugar Wharf and Humber Shores. Or my oft-mentioned favourite hood in Canada, Griffintown in MTL.
Reply With Quote
     
     
  #1817  
Old Posted May 7, 2024, 4:24 AM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Quote:
Originally Posted by AuxTown View Post
Park looks awesome. We don't have enough interaction with developments and the waterfront in Ottawa. Reminds me of some of the waterfront parks in Toronto like Sugar Wharf and Humber Shores. Or my oft-mentioned favourite hood in Canada, Griffintown in MTL.
I think part of the reason is the NCC's very rigid views on leaving shorelines naturalized and even re-naturalizing land on many of their projects. I understand there needs to be a balance between public enjoyment and environmental stewardship, but we could easily have hundreds of metres of riverfront park-space just like this if we'd just manicure more of the land between the water and NCC MUPs. However, the NCC only seems keen on doing that in a select number of places where they can also build a parking lot adjacent to it. Doesn't have to be much, even a little brush clearing would go a long way, it's crazy how much the view of the Ottawa River is obscured when you're only mere metres away from it on the MUP.
Reply With Quote
     
     
  #1818  
Old Posted May 9, 2024, 7:08 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
Looks like somebody screwed up. They are stripping it down.


dji_fly_20240509_135018_478_1715277140765_photo_optimized by Yaro Shkvo, on Flickr
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1819  
Old Posted May 9, 2024, 9:16 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,250
That side was not previously clad, afaik. They are still insulating.
Reply With Quote
     
     
  #1820  
Old Posted May 9, 2024, 9:45 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by kwoldtimer View Post
That side was not previously clad, afaik. They are still insulating.
It was fully clad. They are stripping it right down to the Densglass.

Must be something wrong with the rockwool or the windows, probably a failed inspection because something is not to code.

__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 3:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.