  #3401  
Old Posted Jan 25, 2024, 8:30 PM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Quote:
Originally Posted by Uhuniau View Post
A *network*? Woah, don't get too big for your britches! We can't even get very basic, small, and relatively cheap shelter amenities right and here you are wanting a whole-ass network?



I mean, I already know the reason why Carleton station sucks and will continue to suck, but has anyone in officialdom said that reason out loud, I wonder?
Lol, I meant more so that if the combined funds allocated to marginally beneficial roads project were continually invested into transit instead (where those same funds would go a lot further) we could've had a much more comfortable transit network (e.g. more protective bus shelters and more of them in general, and enclosed, climate-controlled O-Train stations. Maybe more escalators too. Oh and maybe regular cleaning of transit vehicles and stations... ok now I'm really asking for too much
Reply With Quote
     
     
  #3402  
Old Posted Jan 31, 2024, 9:50 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
I saw the impossible this morning. Four trains between South Keys and the Brookfield siding. A Flirt train southbound at South Keys, southbound at Greenboro and a double Lint southbound at Brookfield. This is not possible in regular service. There was also a single Lint arriving north bound at South Keys, no doubt a test train for the airport spur. We are getting a little closer. But no further work at the south branch stations probably until spring at least outdoor work. There may be work going on inside the stations, but you can't get close enough to tell.
Reply With Quote
     
     
  #3403  
Old Posted Feb 2, 2024, 11:48 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
I saw the impossible this morning. Four trains between South Keys and the Brookfield siding. A Flirt train southbound at South Keys, southbound at Greenboro and a double Lint southbound at Brookfield. This is not possible in regular service. There was also a single Lint arriving north bound at South Keys, no doubt a test train for the airport spur. We are getting a little closer. But no further work at the south branch stations probably until spring at least outdoor work. There may be work going on inside the stations, but you can't get close enough to tell.
There's nothing really to be done in the stations. It's just landscaping work that's remaining, which can't be done until the spring
Reply With Quote
     
     
  #3404  
Old Posted Feb 2, 2024, 11:52 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Uhuniau View Post
I would have sacrificed every cent spent on that plaza and planters and devoted it to an actual, sensible, shelter structure at this duct-taped jerry-rigged excuse of a station.

The simple shelters on line 2 are fully enclosed and heated, unlike the elaborate ones on line 1. Careful what you wish for
Reply With Quote
     
     
  #3405  
Old Posted Feb 2, 2024, 4:04 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
Quote:
Originally Posted by kmcamp View Post
The simple shelters on line 2 are fully enclosed and heated, unlike the elaborate ones on line 1. Careful what you wish for
Are the bus station shelters going to be heated? This is where it is needed the most when people have long waits for buses.
Reply With Quote
     
     
  #3406  
Old Posted Feb 4, 2024, 2:48 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
Are the bus station shelters going to be heated? This is where it is needed the most when people have long waits for buses.
Sadly and predictably the bus shelters they've installed so far are not. So you'll be warm waiting the 12 minutes for the train but not the 30 minutes for the bus I'm guessing
Reply With Quote
     
     
  #3407  
Old Posted Feb 4, 2024, 2:25 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
Quote:
Originally Posted by kmcamp View Post
Sadly and predictably the bus shelters they've installed so far are not. So you'll be warm waiting the 12 minutes for the train but not the 30 minutes for the bus I'm guessing
Exactly.
Reply With Quote
     
     
  #3408  
Old Posted Feb 4, 2024, 7:53 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
All train and bus loop platforms will have heating in the transecure shelters (one on each platform), while the remaining standard shelters on the platforms will have electrical rough-ins to easily add heating in the future. The only shelters that won't have heating are the on-street shelters, such as those at Gladstone and Walkley.
Reply With Quote
     
     
  #3409  
Old Posted Feb 8, 2024, 4:26 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,612
Are they giving testing updates anywhere? Is April still possible or are we looking at Summer/Fall?

Can't believe how long this was closed for such a small project

If only we had the billions of $ and cheap labour that Qatar had before the WC. 76km of pristine segregated rail built in less than 5 years!
Reply With Quote
     
     
  #3410  
Old Posted Feb 8, 2024, 4:36 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
Quote:
Originally Posted by AuxTown View Post
Are they giving testing updates anywhere? Is April still possible or are we looking at Summer/Fall?

Can't believe how long this was closed for such a small project

If only we had the billions of $ and cheap labour that Qatar had before the WC. 76km of pristine segregated rail built in less than 5 years!
I live pretty close by. Depending on the day, you will see multiple trains on the tracks or you see none. The last time I was out at Riverside South, there were just pickups on the tracks. I have not seen any real life testing, although I hear that the most testing takes place at night.

There is still work to be done for public access to the stations especially in the south. This will happen when spring arrives. It is hard to say how close to completion that work is.

I think an April opening is off the table, the last I heard.
Reply With Quote
     
     
  #3411  
Old Posted Feb 8, 2024, 4:39 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,817
One would hope that once the system has passed the tests, that the line could open.

If a station bathroom or some landscaping around Leitrim station isn't complete, hopefully they don't delay the opening of the entire line for that!

I bought a condo unit in 2018 next to the Trilium line excited about the future. 5-6 years later, I've moved out and the line isn't even open yet.
Reply With Quote
     
     
  #3412  
Old Posted Feb 8, 2024, 5:15 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
Quote:
Originally Posted by OTSkyline View Post
One would hope that once the system has passed the tests, that the line could open.

If a station bathroom or some landscaping around Leitrim station isn't complete, hopefully they don't delay the opening of the entire line for that!

I bought a condo unit in 2018 next to the Trilium line excited about the future. 5-6 years later, I've moved out and the line isn't even open yet.
If we ever get to double tracking, there will be another major closure. I have already lived through 18 years of disappointment relating to this line. Jim Watson liked the Chevrolet analogy, but this Chev is almost 23 years old and has already been patched up a number of times.
Reply With Quote
     
     
  #3413  
Old Posted Feb 27, 2024, 9:51 PM
Horus's Avatar
Horus Horus is offline
I ask because I Gatineau
 
Join Date: Jul 2013
Location: Aylmer (by way of GTA)
Posts: 1,213
Uh oh...
https://ottawa.ctvnews.ca/trillium-line-...pushed-back-through-the-summer-1.6786026


Quote:
Trillium Line hits another delay, opening pushed back through the summer
William Eltherington
CTV News Ottawa Digital Multi-Skilled Journalist

Published Feb. 27, 2024 4:41 p.m. EST


OC Transpo officials say the north-south Trillium Line could hit yet another delay, with the timeline for opening being potentially extended into the summer.

Councillors have been told in a slide presentation on Stage 2 construction on late Tuesday afternoon that OC Transpo is giving themselves a wider timeline than had been previously announced with an opening day potentially being in September.

A slide says the transit authority's period for handover could be between April and June, with passenger service happening sometime between May and September, but a firm date had not been given. Officials had previously said the window for passenger service would be between March and June.

Transit services general manager Renée Amilcar had said the anticipated opening date would be in "spring of 2024" in recent months.

Construction for the Trillium Line was originally scheduled to be completed in August 2022, but was delayed until September 2023. On Sept. 29, Amilcar said that based on the progress to date, a fall launch was no longer possible and would be delayed again.

This could mean the Trillium Line would open a full two years behind schedule. This would be the third major delay.

....
Reply With Quote
     
     
  #3414  
Old Posted Feb 27, 2024, 11:21 PM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
The headline doesn't seem accurate based on what's described in the article. Possible it's just some more clickbait trash being flung around by those "journalists" at CTV Ottawa. Cherry on top is the typo in his colleague's name at the bottom, "Josh Pringe" lol.
Reply With Quote
     
     
  #3415  
Old Posted Feb 28, 2024, 12:22 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,759
I saw no trains on the line as we approached Ottawa airport yesterday. Not a good sign if service is to begin anytime soon.
Reply With Quote
     
     
  #3416  
Old Posted Feb 28, 2024, 12:27 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,107
Quote:
Originally Posted by lrt's friend View Post
I saw no trains on the line as we approached Ottawa airport yesterday. Not a good sign if service is to begin anytime soon.
Trial running isn't even expected to begin for another month, so you might be reading a little too much into that at this point.
Reply With Quote
     
     
  #3417  
Old Posted Feb 28, 2024, 1:17 AM
qprcanada qprcanada is offline
Registered User
 
Join Date: Apr 2018
Posts: 144
Quote:
Originally Posted by OCCheetos View Post
Trial running isn't even expected to begin for another month, so you might be reading a little too much into that at this point.
I've seen lots of trains stopped at the Carling station before going both north and south over the past couple of weeks.
Reply With Quote
     
     
  #3418  
Old Posted Feb 28, 2024, 1:56 AM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 391
I saw them running trains this evening when I passed along Gladstone.
Reply With Quote
     
     
  #3419  
Old Posted Feb 28, 2024, 6:20 PM
stolenottawa stolenottawa is offline
Registered User
 
Join Date: May 2019
Posts: 131
Quote:
Originally Posted by lrt's friend View Post
I saw no trains on the line as we approached Ottawa airport yesterday. Not a good sign if service is to begin anytime soon.
I saw some two days ago.
Reply With Quote
     
     
  #3420  
Old Posted Feb 29, 2024, 2:20 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
FWIW I've seen lots of trains running at Limebank station. Probably most days in the past week there's been trains coming in and out periodically. It really seems to me like the stations are mostly ready and the trains are certainly running.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:27 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.