HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #1741  
Old Posted Dec 10, 2023, 5:43 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by billbillbillbill View Post
They haven't done a photo or construction update on the airport site since Phase 2 completed. The monthly board meeting agenda will be released this coming week and should have some updates.

From my flight this week, they are still cladding the north central node and doing stone pillars for the last extension of the north concourse.
Thanks for letting us know about this. So please keep us updated!
Reply With Quote
     
     
  #1742  
Old Posted Dec 11, 2023, 6:25 PM
atx-adam atx-adam is offline
Registered User
 
Join Date: Mar 2015
Posts: 49
Quote:
Originally Posted by wrendog View Post
As far as the tram, you won't see it until a 3rd concourse is built, which will be a long time.
I wonder if it's feasible to extend the tunnel to where the 3rd concourse will be and build/operate the tram, even without starting on the rest of the 3rd concourse? That would be a nice amenity to have in place before the 2034 Olympics.

(Related: I'm so glad SLC was built with a tunnel/walkway-first approach, as opposed to Denver which turns into a disaster whenever the trains break...)

Any other 2034 goals for the airport? If Concourse B is finished building out as planned in Oct 2026, that leaves 7 years before the Olympics come to town.
Reply With Quote
     
     
  #1743  
Old Posted Dec 11, 2023, 7:04 PM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 825
Quote:
Originally Posted by atx-adam View Post
I wonder if it's feasible to extend the tunnel to where the 3rd concourse will be and build/operate the tram, even without starting on the rest of the 3rd concourse? That would be a nice amenity to have in place before the 2034 Olympics.

(Related: I'm so glad SLC was built with a tunnel/walkway-first approach, as opposed to Denver which turns into a disaster whenever the trains break...)

Any other 2034 goals for the airport? If Concourse B is finished building out as planned in Oct 2026, that leaves 7 years before the Olympics come to town.
They'll work into 2027 to extend the tunnel past the apron for future Concourse C.

After that they'll slowly work on prerequisite projects like moving the fuel depot and hangars. Expect things to move much slower once Concourse B is done, they'll be paying these bonds for some time. Assuming the generous growth estimations they should start on Concourse C sometime in the early 2050s.
Reply With Quote
     
     
  #1744  
Old Posted Dec 12, 2023, 1:04 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by Paniolo Man View Post
They'll work into 2027 to extend the tunnel past the apron for future Concourse C.

After that they'll slowly work on prerequisite projects like moving the fuel depot and hangars. Expect things to move much slower once Concourse B is done, they'll be paying these bonds for some time. Assuming the generous growth estimations they should start on Concourse C sometime in the early 2050s.
Well said! Keep us posted on your progress and see how it goes in SLC for the next future.
Reply With Quote
     
     
  #1745  
Old Posted Dec 16, 2023, 8:46 PM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by Paniolo Man View Post
They'll work into 2027 to extend the tunnel past the apron for future Concourse C.

After that they'll slowly work on prerequisite projects like moving the fuel depot and hangars. Expect things to move much slower once Concourse B is done, they'll be paying these bonds for some time. Assuming the generous growth estimations they should start on Concourse C sometime in the early 2050s.
I think it will happen in the 2030’s, early 40s at the latest. From what I’ve heard Delta intends on making SLC its #2 Hub. They will need more gates way before the 2050. The Delta expansion will also make SLC more desirable to other airlines… I predict a major time escalation on any 2050 time line prediction. I think we will be given some sort of timeline before the end of construction concourse B in 2027…. Although I expect everything on B to be done a bit ahead of schedule.
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
Reply With Quote
     
     
  #1746  
Old Posted Dec 17, 2023, 12:43 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by ajiuO View Post
I think it will happen in the 2030’s, early 40s at the latest. From what I’ve heard Delta intends on making SLC its #2 Hub. They will need more gates way before the 2050. The Delta expansion will also make SLC more desirable to other airlines… I predict a major time escalation on any 2050 time line prediction. I think we will be given some sort of timeline before the end of construction concourse B in 2027…. Although I expect everything on B to be done a bit ahead of schedule.
Very well said! I’ll believe it when I see it! Hope they start construction new concourse C in the future. We shall see what happens.
Reply With Quote
     
     
  #1747  
Old Posted Dec 17, 2023, 12:55 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,574
I can't help but think that once the 2034 Olympics are locked down the timelines will be sped up considerably.
Reply With Quote
     
     
  #1748  
Old Posted Dec 17, 2023, 2:34 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by delts145 View Post
I can't help but think that once the 2034 Olympics are locked down the timelines will be sped up considerably.
I know! I'm aware! There will be no flights during opening and closing ceremony. Due to the restrictions.
Reply With Quote
     
     
  #1749  
Old Posted Dec 17, 2023, 5:28 PM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
The Delta inside rumor:
Phase 1. New SLC
Phase 2. Build a strong presence in salt lake (The Delta Center was part of that)
Phase 3. Corporate office expansion into salt lake and the establishment of SLC as #2 hub… (been a rumor for years.. but a lot of it has happened, so I don’t know?).


SLC Update:
A couple of random construction updates. They are adding some new seating on the west end of the Gateway Center (Rental car lobby). They have also removed the small Delta check-in desk and security check from level 1. Kind of a shame. It was handy.



__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
Reply With Quote
     
     
  #1750  
Old Posted Dec 22, 2023, 4:43 AM
mattreedah mattreedah is online now
Registered User
 
Join Date: Nov 2011
Posts: 252
Quote:
Originally Posted by N830MH View Post
Thanks for letting us know about this. So please keep us updated!
There usually isn’t a December board meeting
Reply With Quote
     
     
  #1751  
Old Posted Dec 22, 2023, 7:05 PM
ucsbgaucho ucsbgaucho is offline
Registered User
 
Join Date: Dec 2006
Posts: 366
Was this the international security area? So there's now only the single security area on the main level up above?

Quote:
Originally Posted by ajiuO View Post
They have also removed the small Delta check-in desk and security check from level 1. Kind of a shame. It was handy.

Reply With Quote
     
     
  #1752  
Old Posted Dec 28, 2023, 1:22 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Reply With Quote
     
     
  #1753  
Old Posted Dec 31, 2023, 10:30 AM
downtownslcresident downtownslcresident is offline
Registered User
 
Join Date: Nov 2011
Posts: 114
Quote:
Originally Posted by ucsbgaucho View Post
Was this the international security area? So there's now only the single security area on the main level up above?
The security area is on the other side of the wall, it’s used exclusively for I international to domestic connections (and crew access) and can’t be accessed by origination traffic.

The delta check in counters that used to be right at that spot have been expanded and moved down the hall a little further. I’m not sure what will go in this space to replace it.
Reply With Quote
     
     
  #1754  
Old Posted Jan 2, 2024, 9:53 PM
ucsbgaucho ucsbgaucho is offline
Registered User
 
Join Date: Dec 2006
Posts: 366
Quote:
Originally Posted by downtownslcresident View Post
The security area is on the other side of the wall, it’s used exclusively for I international to domestic connections (and crew access) and can’t be accessed by origination traffic.

The delta check in counters that used to be right at that spot have been expanded and moved down the hall a little further. I’m not sure what will go in this space to replace it.
Ahh ok, taking my first int'l flight from SLC in June and thought this was the less-crowded security entrance I could use. Guess not! haha
Reply With Quote
     
     
  #1755  
Old Posted Jan 15, 2024, 11:42 PM
arkhitektor arkhitektor is offline
Registered User
 
Join Date: Feb 2005
Location: Clearfield, UT
Posts: 1,784
I flew out of the new east side of Concourse A last week and noticed something on the walk to my gate. There does not appear to be any place on the north side of the east concourse for an entrance to a tunnel to Concourse B. Was it just my imagination that there was supposed to be another small pedestrian-only tunnel on the east side mirroring the one on the west?

Reply With Quote
     
     
  #1756  
Old Posted Jan 15, 2024, 11:46 PM
wrendog's Avatar
wrendog wrendog is online now
Registered User
 
Join Date: May 2003
Location: San Antonio TX
Posts: 4,279
Quote:
Originally Posted by arkhitektor View Post
I flew out of the new east side of Concourse A last week and noticed something on the walk to my gate. There does not appear to be any place on the north side of the east concourse for an entrance to a tunnel to Concourse B. Was it just my imagination that there was supposed to be another small pedestrian-only tunnel on the east side mirroring the one on the west?

Nope. Just central tunnel. In fact, I believe the temp tunnel on the west side is supposed to be shuttered. I think
Reply With Quote
     
     
  #1757  
Old Posted Jan 16, 2024, 12:57 AM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 825
Quote:
Originally Posted by wrendog View Post
Nope. Just central tunnel. In fact, I believe the temp tunnel on the west side is supposed to be shuttered. I think
1. The east tunnel was initially planned but removed early in planning.

2. SLCDA has made the decision to keep the west tunnel permanently open.
Reply With Quote
     
     
  #1758  
Old Posted Jan 16, 2024, 1:10 AM
arkhitektor arkhitektor is offline
Registered User
 
Join Date: Feb 2005
Location: Clearfield, UT
Posts: 1,784
Quote:
Originally Posted by Paniolo Man View Post
1. The east tunnel was initially planned but removed early in planning.

2. SLCDA has made the decision to keep the west tunnel permanently open.
Thanks for the quick answer. The asymmetry will always bother me, but I imagine most everyone will just use the central tunnel once it is complete.
Reply With Quote
     
     
  #1759  
Old Posted Jan 16, 2024, 1:15 AM
wrendog's Avatar
wrendog wrendog is online now
Registered User
 
Join Date: May 2003
Location: San Antonio TX
Posts: 4,279
Quote:
Originally Posted by Paniolo Man View Post
1. The east tunnel was initially planned but removed early in planning.

2. SLCDA has made the decision to keep the west tunnel permanently open.
Good to hear that the west tunnel will stay. I thought I had heard it would be shuttered
Reply With Quote
     
     
  #1760  
Old Posted Jan 16, 2024, 1:26 AM
Paniolo Man's Avatar
Paniolo Man Paniolo Man is offline
Lahaina Strong
 
Join Date: Oct 2021
Location: Murray, Utah.
Posts: 825
Decent picture of construction progress from the meeting materials for the month:

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 6:19 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7