HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #1701  
Old Posted Nov 17, 2023, 5:20 PM
bridgeoftea's Avatar
bridgeoftea bridgeoftea is online now
Registered User
 
Join Date: Nov 2021
Posts: 697
Quote:
Originally Posted by sailor734 View Post
Heard on the radio today that the glass has been delayed. Didn't catch if there was any updated delivery date. I drove by there today.....still looks far from finished. I'm guessing next year.

You really have to feel sooty for the boardwalk businesses being at the mercy of a project like this creeping along at "government" speed.
As long as it's completed by May I don't think it will be that much more of an inconvenience. I do think if it impacts the summer months again, business along the boardwalk will be in uproar.
Reply With Quote
     
     
  #1702  
Old Posted Nov 17, 2023, 5:31 PM
homebody homebody is offline
Registered User
 
Join Date: Sep 2007
Location: Saint John, N.B.
Posts: 320
Quote:
Originally Posted by sailor734 View Post
Heard on the radio today that the glass has been delayed. Didn't catch if there was any updated delivery date. I drove by there today.....still looks far from finished. I'm guessing next year.

You really have to feel sooty for the boardwalk businesses being at the mercy of a project like this creeping along at "government" speed.
Ya know its hard to keep believing the whole supply chain issues thing. It seems like every time there is a delay or a screw up on a project they use this excuse. I don't buy it, and neither should anyone else. This part of project has been planned for how long? a year maybe two? you mean to tell me that whoever does the planning didn't reach out to suppliers in a timely manner knowing what the world is like post pandemic? Sailor734 is right. It is going at a snails pace right now someone dropped the ball and it's the businesses that feel the pain. They say update by the end of the year! I say BS! They have stopped laying pavers now for weeks, and how close is the area going down to the water from being finished?
Reply With Quote
     
     
  #1703  
Old Posted Nov 17, 2023, 5:52 PM
darkharbour darkharbour is offline
Registered User
 
Join Date: Jan 2021
Posts: 805
Quote:
Originally Posted by homebody View Post
Ya know its hard to keep believing the whole supply chain issues thing. It seems like every time there is a delay or a screw up on a project they use this excuse. I don't buy it, and neither should anyone else. This part of project has been planned for how long? a year maybe two? you mean to tell me that whoever does the planning didn't reach out to suppliers in a timely manner knowing what the world is like post pandemic? Sailor734 is right. It is going at a snails pace right now someone dropped the ball and it's the businesses that feel the pain. They say update by the end of the year! I say BS! They have stopped laying pavers now for weeks, and how close is the area going down to the water from being finished?
That's not true, I go past every day of the week and have seen demonstrable progress of the pavers on both sides of the new stage. If anything I'd say the progress on the whole areas has really ramped up inthe past month. I know they are separate contracts, but Harbour Passage continues to see major progress on the lighting install, interpretive stops, small ampithetre area, etc., meanwhile the landscaping and planting of trees throughout has also taken place while work on the stage, patios, and tidal steps have all progressed visibly. That's not even including the movement toward building 1 of Fundy Quay, which is also picking up speed lately.

Supply chain issues are very much real, I've experienced them both in my professional work in multiple industries and even on a project at my home.
Reply With Quote
     
     
  #1704  
Old Posted Nov 17, 2023, 11:31 PM
homebody homebody is offline
Registered User
 
Join Date: Sep 2007
Location: Saint John, N.B.
Posts: 320
Quote:
Originally Posted by darkharbour View Post
That's not true, I go past every day of the week and have seen demonstrable progress of the pavers on both sides of the new stage. If anything I'd say the progress on the whole areas has really ramped up inthe past month. I know they are separate contracts, but Harbour Passage continues to see major progress on the lighting install, interpretive stops, small ampithetre area, etc., meanwhile the landscaping and planting of trees throughout has also taken place while work on the stage, patios, and tidal steps have all progressed visibly. That's not even including the movement toward building 1 of Fundy Quay, which is also picking up speed lately.

Supply chain issues are very much real, I've experienced them both in my professional work in multiple industries and even on a project at my home.
I stand corrected. I did walk by there today and seen some paver’s being installed. Really it’s a snails pace though. Yea the trees are planted and the gardens are in. The issue was the glass structure. I think with proper planning in advance this should not have been an issue. I believe the the whole thing was supposed to be done by the end of the year. Correct me if I’m wrong😊. I can’t see it though.
Reply With Quote
     
     
  #1705  
Old Posted Nov 18, 2023, 2:12 PM
DyAm00394 DyAm00394 is online now
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,025
So Slate Office REIT recently announced plans to sell assets, (calling it "Portfolio Alignment Plan"), which represent about 40 per cent of its gross leasable area, suspend distributions and amend its declaration of trust to raise the ceiling on its allowable debt.

Quote:
"This plan will see the REIT divest non-core assets in certain Canadian markets that are not strategic for the REIT in the long term. Proceeds from the sales of these assets will go towards repayment of the debt and general liquidity of the REIT’s business operations. We refinanced or amended over $577 million of debt, which is nearly half of the REIT’s current debt stack.

“Looking ahead we want to own high quality assets with strong occupancy, tenants and cash flow in markets with economic tailwinds and stable office demand. We believe the Portfolio Alignment Plan that we are introducing will not only improve the REIT’s balance sheet and liquidity, but also enhance the portfolio composition resulting in a more focused and resilient REIT."
Source: https://renx.ca/slate-office-reit-unveils-major-portfolio-alignment-plan

I can see Brunswick Square being sold soon then. Hopefully a new owner will have solid commitment to a redevelopment plan.
Reply With Quote
     
     
  #1706  
Old Posted Nov 18, 2023, 3:09 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,020


Good riddance to bad rubbish. I don't think Slate ever had any real interest in maximizing the potential of Brunswick Square.

Whoever purchases the property now will have to contemplate a complete reinvigoration from the ground up (a fork-lift upgrade). The current state of Brunswick Square is just sad, sad, sad...........
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1707  
Old Posted Nov 18, 2023, 6:04 PM
sailor734 sailor734 is offline
Registered User
 
Join Date: Apr 2023
Posts: 2,653
Quote:
Originally Posted by MonctonRad View Post


Good riddance to bad rubbish. I don't think Slate ever had any real interest in maximizing the potential of Brunswick Square.

Whoever purchases the property now will have to contemplate a complete reinvigoration from the ground up (a fork-lift upgrade). The current state of Brunswick Square is just sad, sad, sad...........

Agreed. It was straight downhill for Brunswick Square since the day Slate took over.

Suspending distributions, raising debt ceiling and selling off assets.....sounds like they are on shaky ground at best.

I'm not sure what a reinvigoration of Brunswick Square would look like. Is the upscale urban mall model still viable in 2023 or would it need to be repurposed?
Reply With Quote
     
     
  #1708  
Old Posted Nov 18, 2023, 6:44 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,352
Quote:
Originally Posted by sailor734 View Post
Agreed. It was straight downhill for Brunswick Square since the day Slate took over.

Suspending distributions, raising debt ceiling and selling off assets.....sounds like they are on shaky ground at best.

I'm not sure what a reinvigoration of Brunswick Square would look like. Is the upscale urban mall model still viable in 2023 or would it need to be repurposed?
Outlet shopping like Freeport, ME. Build it and maybe the customers will come. Take a % of sales instead of rent to minimize risk for retailers to open up.
Reply With Quote
     
     
  #1709  
Old Posted Nov 18, 2023, 7:50 PM
sailor734 sailor734 is offline
Registered User
 
Join Date: Apr 2023
Posts: 2,653
Quote:
Originally Posted by cdnguys View Post
Outlet shopping like Freeport, ME. Build it and maybe the customers will come. Take a % of sales instead of rent to minimize risk for retailers to open up.

Maybe but have you been to Freeport lately? I was there last summer (first time since Covid) and was shocked at the change. Plenty of empty storefronts and sparse crowds on a sunny August day.....very different from the hay days of the 80's/90's/early 2000's.

I'm not sure if it's just Covid or if the whole Outlet Mall thing has had it's day. We used to go to Kittery and Freeport for Christmas shopping every November years ago and they were booming. Recent years (even pre Covid) and not so much.

If the Uptown population continues to grow what about services? Things like a compact urban sized grocery store, pharmacy, cleaners/laundry, seamstress/tailor, hair salon, medical offices, spa etc etc.
Reply With Quote
     
     
  #1710  
Old Posted Nov 18, 2023, 7:58 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,352
Quote:
Originally Posted by sailor734 View Post
Maybe but have you been to Freeport lately? I was there last summer (first time since Covid) and was shocked at the change. Plenty of empty storefronts and sparse crowds on a sunny August day.....very different from the hay days of the 80's/90's/early 2000's.

I'm not sure if it's just Covid or if the whole Outlet Mall thing has had it's day. We used to go to Kittery and Freeport for Christmas shopping every November years ago and they were booming. Recent years (even pre Covid) and not so much.

If the Uptown population continues to grow what about services? Things like a compact urban sized grocery store, pharmacy, cleaners/laundry, seamstress/tailor, hair salon, medical offices, spa etc etc.
Haven’t been to Freeport in years but with online shopping your prob right - dying retail idea. Another idea would be like an IKEA type store where it’s a showcase / fulfilment centre / marketing office so they don’t rely just on walk in retail sales. Or some sort of Amazon living lab kinda place. Or a University of Phoenix campus
Reply With Quote
     
     
  #1711  
Old Posted Nov 18, 2023, 9:34 PM
JakeNB JakeNB is offline
Registered User
 
Join Date: Sep 2018
Location: Saint John
Posts: 196
Quote:
Originally Posted by sailor734 View Post
If the Uptown population continues to grow what about services? Things like a compact urban sized grocery store, pharmacy, cleaners/laundry, seamstress/tailor, hair salon, medical offices, spa etc etc.
I agree with this. My idea is a medical mall. They have a start with a drug store and a dental office. Expand this to include doctor’s offices, optical outlets, chiropractors, physiotherapists, massage therapists, etc. Would be a major draw and coukd service the growing uptown population.
Reply With Quote
     
     
  #1712  
Old Posted Nov 19, 2023, 6:12 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,352
Excavation for Barrack Green Residences

[IMG] thank you jpg images[/IMG]
Reply With Quote
     
     
  #1713  
Old Posted Nov 20, 2023, 12:23 AM
DyAm00394 DyAm00394 is online now
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,025
This was posted on Facebook today:

Quote:
“Steepleview Apartments construction has begun. Iron Maple Construction has moved on site to bring this six story mixed housing development to occupancy in 18 months if not sooner.

56 apartments, a Day Care, Wellness Gardens, Green space, Council 937 Knights of Columbus offices, underground parking, 2 commercial areas and a large community room.

Apartments are now renting with individual apartment designs to follow shortly.

Our Architect, Robert Boyce will be providing additional landscape views of this $23,000,000.00 development.

Please view our new site regularly for updates and information”.
https://www.facebook.com/share/smFRAxT1RrgNqhBy/?mibextid=K35XfP
Reply With Quote
     
     
  #1714  
Old Posted Nov 20, 2023, 4:49 AM
adamuptownsj adamuptownsj is online now
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,016
Nothing all spring and summer and we get pile driving at Fundy Quay, excavation at Barrack Green, and a start on Steepleview within ten days. Cool, but strange. Good to see one in each neighbourhood.

77 + 39 + 56 units between the three for a total of 172, if I'm not mistaken.

FYI we are still on track for a March start for Waterloo Lofts, which is pretty locked in at 54 units.
Reply With Quote
     
     
  #1715  
Old Posted Nov 20, 2023, 8:48 PM
DyAm00394 DyAm00394 is online now
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,025
Telegraph Journal is reporting that actually a Fredericton-based developer, (Erik De Jong), is who bought both the former St. Vincent School and St. Patrick's schools.

Quote:
“Both will be turned into multi-unit residential buildings with an affordable housing element, said DeJong, who said he already has experience building apartment buildings and commercial properties.

De Jong said he expects his project to turn the former St. Vincent’s high school into 60 to 70 apartment units will take about two years to realize, with preliminary cost estimates at $14-16 million”.
https://tj.news/saint-john-south/single-residential-developer-takes-on-two-former-schools
Reply With Quote
     
     
  #1716  
Old Posted Nov 20, 2023, 9:15 PM
adamuptownsj adamuptownsj is online now
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,016
I guess I was wrong, maybe the Moncton connection came from being Thrive's director of development? A Paul Jenkins from Charlottetown is his business partner.

Either way I am less confident than I was... two massive reno projects purchased, plus the Rainsford Gardens Apartments (250 Rainsford) in Fredericton. That's a ton to take on at once, for a new company. He says 18 month timeline for St. Pat's and 2 years for St. Vincent's. Nothing about a start date though.
Reply With Quote
     
     
  #1717  
Old Posted Nov 20, 2023, 9:58 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,352
Quote:
Originally Posted by adamuptownsj View Post
I guess I was wrong, maybe the Moncton connection came from being Thrive's director of development? A Paul Jenkins from Charlottetown is his business partner.

Either way I am less confident than I was... two massive reno projects purchased, plus the Rainsford Gardens Apartments (250 Rainsford) in Fredericton. That's a ton to take on at once, for a new company. He says 18 month timeline for St. Pat's and 2 years for St. Vincent's. Nothing about a start date though.
No not wrong. Erik DeJong is the one developing apartment buildings to the right of the XTR property on Loch Lomand Rd (not to be confused with project currently before PAC across the way). He has well known Moncton/Riverview projects.
Reply With Quote
     
     
  #1718  
Old Posted Nov 20, 2023, 10:20 PM
adamuptownsj adamuptownsj is online now
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,016
Quote:
Originally Posted by cdnguys View Post
No not wrong. Erik DeJong is the one developing apartment buildings to the right of the XTR property on Loch Lomond Rd (not to be confused with project currently before PAC across the way). He has well known Moncton/Riverview projects.
My bad- I was thinking of the frequently-revised 1429 Loch Lomond project. And 250 Rainsford is wrong-- AllNB failed me. He bought the Sarah's Lane land here, right? https://paol-efel.snb.ca/paol.html?v=1.0.37&lang=en&pan=06291219
Reply With Quote
     
     
  #1719  
Old Posted Nov 20, 2023, 10:47 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,352
Quote:
Originally Posted by adamuptownsj View Post
My bad- I was thinking of the frequently-revised 1429 Loch Lomond project. And 250 Rainsford is wrong-- AllNB failed me. He bought the Sarah's Lane land here, right? https://paol-efel.snb.ca/paol.html?v=1.0.37&lang=en&pan=06291219
Not sure about Fredericton. Looks like Erik incorporated “City Line Holdings” - I assume based on street St Pats is on. That’s 3 major projects by this one developer so lots of confidence in future demand.
Reply With Quote
     
     
  #1720  
Old Posted Nov 21, 2023, 6:14 AM
adamuptownsj adamuptownsj is online now
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,016
AllNB says SableARC is the architect, both projects are going ahead concurrently, and they seem to be starting design. Feeling more confident. Spring starts?

I'm kind of interested in 115 Hazen now (the old Medical Arts building). Once St Vincent's goes through first and second rezoning reading, I might sniff around...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 3:27 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.