Quote:
Originally Posted by SL123
I know the very long Hydro Ottawa strike had an impact on this but I dont know to what extent.
|
The strike was what, two months? Project is two years behind. Double the timeline.
The gap between East and South is closing fast. South was supposed to open after two years, now we're at four, and east was supposed to be five, and they are only six weeks behind.
That's what we get from giving the contract to a company that failed the technical score, and failed it again when we tried to give them a break. The same company that pulled the same thing last time with Confederation Line (May 2018, August 2018, no December 2018, for sure March 2019, no really, June 2019, ok, September 2019, but lower the testing standards).