HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Reply

 
Thread Tools Display Modes
     
     
  #3601  
Old Posted Aug 30, 2023, 2:17 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Reply With Quote
     
     
  #3602  
Old Posted Sep 1, 2023, 1:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Algonquin Station, Ottawa. Future underground terminus of Line 1, transfers to Barrhaven.

At the 20 second mark, the drone approaches the entrance of the tunnel. The two side tunnels will be storage tracks. Station will be in the middle with a centre platform.

The station will have to head houses. One behind the Algonquin College trades building, and a two storey one for the bus loop (fare paid) with skywalk connecting to the Algonquin Campus.

• Video Link
Reply With Quote
     
     
  #3603  
Old Posted Sep 7, 2023, 5:51 AM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3604  
Old Posted Sep 7, 2023, 2:50 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ What is going on with that former BMO site in that picture?
Reply With Quote
     
     
  #3605  
Old Posted Sep 7, 2023, 3:56 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
Derelict wasteland for sale and neglected by the developer...
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3606  
Old Posted Sep 7, 2023, 6:52 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
'Now opening fall 2023'
---
Valley Line Southeast LRT – Update – Performance Demonstration Testing and Service Commencement

TransEd, the company responsible for the design, build, operations and maintenance of the Edmonton Valley Line Southeast LRT, is pleased to provide an update on the project.

As previously announced, testing identified cables that needed to be replaced to improve long-term system reliability. Today, we are pleased to announce cable replacement is complete, and line-wide train testing has resumed. “Replacement of the cables over the past nine weeks ensures the system will operate safely and reliably over the next 30 years,” says Dallas Lindskoog, TransEd spokesperson.

Concurrent with this upgrade, TransEd has continued to finalize and submit the required documentation for review by the independent certifiers who need to sign off on the system before the line can open for passenger service. In the next few weeks, trains will operate along the entire 13km, mimicking regular passenger service to demonstrate to the certifiers and the City that the Valley Line Southeast LRT is ready to open. We continue to work closely with the City, and more information about the opening date this fall will be provided as final testing and independent certification nears completion.

https://transedlrt.ca/updates/september-7-2023-news-release/
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3607  
Old Posted Sep 7, 2023, 8:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
2021 report on the Gatineau Tramway came out yesterday. Surprise surprise, still recommending tramway for the west end of Gatineau. We've been turning in circle on this one and I can't understand why it took 2 years to release this report.

Feds should be announcing funding for next steps any day now (been hearing the same for years).

Anyway, website and YouTube channel.

https://tramwaygatineauottawa.ca/en/

https://www.youtube.com/@tramwaygatineauottawa
Reply With Quote
     
     
  #3608  
Old Posted Sep 15, 2023, 2:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Reply With Quote
     
     
  #3609  
Old Posted Sep 15, 2023, 6:07 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,978
There is some great O-Train expansions underway. Shame there won't be any trains on it.
Reply With Quote
     
     
  #3610  
Old Posted Sep 16, 2023, 2:23 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by ssiguy View Post
There is some great O-Train expansions underway. Shame there won't be any trains on it.
Line 2 will likely open within the next 6 months. Issues on Line 1 trains are estimated to be fixed within 2 years, around the time Stage 2 East opens.
Reply With Quote
     
     
  #3611  
Old Posted Sep 28, 2023, 1:21 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Video of Lincoln Fields, on Ottawa's Stage 2 West. Lincoln Fields will be a major bus-train hub for the urban west end. The two platform, three track station will serve as a transfer between outbound Lines 1 and 3, and include washrooms and retail.

Quote:
Originally Posted by sseguin View Post
In this video, we invite you to join us on an immersive, up-close tour of Lincoln Fields Station. Experience the station's design and ambiance firsthand as we explore its features, alongside Mary-Ellen Gleeson, the Program Manager - Rail Construction Program at the City of Ottawa, who shares her expertise and insights.

• Video Link
Reply With Quote
     
     
  #3612  
Old Posted Oct 1, 2023, 12:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Two year project that involves minor upgrades to a diesel main rail line (linger platforms, some double tracking, two infill stations, one new grade separation) and a couple extension, one elevated, one surface/berm. Two years late, at least.

Meanwhile, the four year east extension that is far more complicated, is only six weeks behind.

Quote:
Trillium Line launch delayed until spring 2024
https://ottawa.ctvnews.ca/trillium-line-launch-delayed-until-spring-2024-1.6582971
Reply With Quote
     
     
  #3613  
Old Posted Oct 2, 2023, 12:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Video updates from OC Transpo on each O-Train extension.

• Video Link


• Video Link


• Video Link
Reply With Quote
     
     
  #3614  
Old Posted Oct 18, 2023, 5:52 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
Will the SELRT in Edmonton open before or after the THIRD (3rd) anniversary of its original opening date of 'December 2020'?

Odds?
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3615  
Old Posted Oct 18, 2023, 9:58 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,393
Can Hamilton officially join the club? haha

The City has started the B-Line LRT project, and literally, at the start, the City uncovers the former street car rails from the 1800s! It's funny how, almost 200 years later, the City is building a transit line on top of the former line.

Quote:
Originally Posted by craftbeerdad View Post
Here you go, via the Hamilton LRT IG





Reply With Quote
     
     
  #3616  
Old Posted Oct 18, 2023, 11:08 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
Everything old is new again?
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3617  
Old Posted Oct 19, 2023, 1:06 PM
jamincan jamincan is offline
Registered User
 
Join Date: Jul 2020
Location: KW
Posts: 1,931
When they were building the LRT in Uptown Waterloo, they uncovered the old corduroy road from when the city was originally settled. It ended up delaying things as they had to bring in archeologists to excavate the road.
Reply With Quote
     
     
  #3618  
Old Posted Oct 19, 2023, 2:22 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
During the Valley Line LRT they uncovered old streetcar rails in multiple areas.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #3619  
Old Posted Oct 19, 2023, 2:56 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,724
Quote:
Originally Posted by SteelTown View Post
Can Hamilton officially join the club? haha

The City has started the B-Line LRT project, and literally, at the start, the City uncovers the former street car rails from the 1800s! It's funny how, almost 200 years later, the City is building a transit line on top of the former line.
So you're saying that track is already laid for the Hamilton LRT? This thing will be rolling in no time!

In all seriousness, this discovery underscores the premise of splitting the high-dollar LRT design-engineering-construction-rolling stock contract that will go out for international tender and the right of way sanitization contract that will just daylight the corridor, relocate utilities, and provide a clean fully-documented corridor for construction. I cannot recall hearing word that this latter contract had been tendered and awarded, so perhaps the unearthing of old HSR rails occurred during pre-construction work?
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #3620  
Old Posted Oct 24, 2023, 1:09 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,393
It's the beginning of Hamilton's LRT construction.

Quote:
Originally Posted by TheHonestMaple View Post
I think it's safe to say this one is 'Under Construction', even though it's just early works. Can't wait until that view west down King has an LRT guideway!

















Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.