Old Posted Jul 13, 2023, 6:07 PM
vtecyo vtecyo is offline
Registered User
 
Join Date: Feb 2015
Posts: 328
Quote:
Originally Posted by skyscraperaccount View Post
Sure doesn't seem like 7 stories under grade per the Sept 2022 devapp.
Perhaps they just have to switch to a different excavation method?

Or if they have eliminated a few levels of parking - is it because there are much lower parking minimums for rentals vs condos?
Reply With Quote
     
     
  #322  
Old Posted Jul 13, 2023, 10:57 PM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 302
Quote:
Originally Posted by vtecyo View Post
Perhaps they just have to switch to a different excavation method?

Or if they have eliminated a few levels of parking - is it because there are much lower parking minimums for rentals vs condos?
Nothing stands out to me here Part 4 - Parking, Queuing and Loading Provisions (Sections 100 to 114) but, i'm a banker and not an expert in this stuff so >shrug<
Reply With Quote
     
     
  #323  
Old Posted Jul 17, 2023, 3:38 PM
hintonburgneighbour hintonburgneighbour is offline
Registered User
 
Join Date: Jul 2022
Posts: 10
parking

I recall reading somewhere that when it switched to rentals, it was switching to only 2 levels of underground parking-- which seems in line with what is there right now. Not sure if this was from the HCA, or an info piece.
Reply With Quote
     
     
  #324  
Old Posted Jul 17, 2023, 8:39 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
I checked out the site Friday while out cycling. From what I saw they are adding more horizontal steel beams with tie backs and diagonal support beams in the corners. An excavator was still in the hole and a tie back drilling machine. I would suspect that once the steel work and tie backs are completed excavation will continue.
Reply With Quote
     
     
  #325  
Old Posted Aug 2, 2023, 8:50 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
It's getting deeper.



Photo by me
Aug 1, 2023
Reply With Quote
     
     
  #326  
Old Posted Aug 3, 2023, 8:51 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Happy to see this one go up.
Reply With Quote
     
     
  #327  
Old Posted Aug 28, 2023, 5:27 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
The Site Plan just got switched from 'File Pending' to 'Active' on Devapps last week, but no new docs. I wonder if the Ottawafication is underway.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #328  
Old Posted Sep 10, 2023, 9:22 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,966
Taken Sept 10, 2023

Its very deep now!

Reply With Quote
     
     
  #329  
Old Posted Sep 11, 2023, 12:19 PM
Har13 Har13 is offline
Registered User
 
Join Date: Nov 2020
Posts: 183
Cant even find this one on dev apps anymore…
Reply With Quote
     
     
  #330  
Old Posted Sep 11, 2023, 1:13 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Quote:
Originally Posted by Har13 View Post
Cant even find this one on dev apps anymore…
That's normal. At some point after project approval they all get removed.
Reply With Quote
     
     
  #331  
Old Posted Sep 11, 2023, 1:40 PM
concrete06 concrete06 is offline
Registered User
 
Join Date: Aug 2006
Posts: 81
Quote:
Originally Posted by rocketphish View Post
That's normal. At some point after project approval they all get removed.
Isn't this it? https://devapps.ottawa.ca/en/applications/D07-12-13-0124/details
Reply With Quote
     
     
  #332  
Old Posted Sep 12, 2023, 1:16 AM
Har13 Har13 is offline
Registered User
 
Join Date: Nov 2020
Posts: 183
Yes nvm. Couldn’t find it for some reason…
Reply With Quote
     
     
  #333  
Old Posted Sep 18, 2023, 5:41 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
This one seems to be going very fast, must be close to bottoming out.

__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #334  
Old Posted Sep 18, 2023, 8:40 PM
McKellarDweller's Avatar
McKellarDweller McKellarDweller is offline
inner city
 
Join Date: Feb 2012
Location: Calgary/Ottawa
Posts: 490
^ Thanks as always for the pic update, Harley! Fingers crossed this site gets the quality build it deserves.
Reply With Quote
     
     
  #335  
Old Posted Sep 18, 2023, 9:29 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
Quote:
Originally Posted by McKellarDweller View Post
^ Thanks as always for the pic update, Harley! Fingers crossed this site gets the quality build it deserves.
Much obliged! This building will be a very prominent part of the view from Bill's penthouse at Icon, so I suspect it will be one of the decent Claridge projects.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #336  
Old Posted Sep 19, 2023, 3:11 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
Quote:
Originally Posted by Harley613 View Post
Much obliged! This building will be a very prominent part of the view from Bill's penthouse at Icon, so I suspect it will be one of the decent Claridge projects.
Bill didn't care what the building he lives in looked like, but the buildings he'll be starring at...
Reply With Quote
     
     
  #337  
Old Posted Sep 23, 2023, 2:15 PM
hintonburgneighbour hintonburgneighbour is offline
Registered User
 
Join Date: Jul 2022
Posts: 10
Crane

The big crane is up!!
Reply With Quote
     
     
  #338  
Old Posted Sep 24, 2023, 2:48 PM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 167
Just having the crane up shows how prominent this building is going to look here. I just hope this will be one of the nicer projects by Claridge
Reply With Quote
     
     
  #339  
Old Posted Sep 26, 2023, 12:03 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,634
Like Harley mentioned, this will be prominently featured in Bill's view so it better be good! I expect, once it tops out, that they will erect some kind of energy conduit on top of each tower to channel Claridge's evil power across the city. I envision something like this:

Reply With Quote
     
     
  #340  
Old Posted Jan 7, 2024, 5:51 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,966
Slowly but surely its coming along! Probably going to be above ground within a month

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 2:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.