Quote:
Originally Posted by Truenorth00
The biggest mistake Ottawa made was forcing a technology. Virtually every problem with the Confederation Line flows from this decision. Likewise, a lot of the passenger comforts we lack flow from this decision. LRT is basically why we didn't build shorter fully enclosed stations like the REM.
Otherwise, the Confederation Line is fine. Stop spacing is okay for a metro. REM is a bit wider (2.6 km spacing vs. 1.5 Km for Stage 2 Confederation Line) but it's replacing a suburban rail service. The stations are decently designed. Fare systems are okay with Presto.
|
Agreed.
Quote:
Originally Posted by lrt's friend
REM station spacing is affected by crossing a very wide river and in Phase 2, crossing beneath a mountain.
Unfortunately, we judge Confed Line against REM when REM choices were made after ours. None of us knew REM choices regarding technology and station design were realistic when our choices were made around 6 years earlier. Our choices were made based on the previous failed project. With this comparison, the Confed Line was a considerable upgrade. We probably made some bad choices but we couldn't have expected REM in Ottawa, REM is such an unexpected step forward in urban rail design.
Montreal also had a major advantage with a required fast replacement of the Champlain Bridge needed.
|
Vancouver had a fully automated metro in 1986. Linear induction and their track obstruction detection would not work here, but solutions existed for us in 2012. In fact, our trains are automated, but we still have drivers (and 4 cabs per train). There's no excuse.
Quote:
Originally Posted by YOWetal
Yes you're right it's mostly unfair. But Panama to Du Cartier has a bunch of potential stations if the goal was 70% of people within 2 km or some other ridiculous metric. We chose Prom D'Orleans and Jean D'arc stations. Besides the waster $30 million. Every trip from Trim and points beyond will take an extra minute. The tunnelling and diversion to avoid inconveniencing anyone in Westboro is another example.
|
The Transitway worked as express buses could skip station. Can't do that with rail. We built something that acts as commuter rail AND urban transit, which doesn't compute. Inside the Greenbelt and in Orleans, Confederation Line is fine, but Kanata and Barrhaven would be better served by commuter rail.
I have nothing against Jeanne d'Arc, but Orléans Boulevard should not have been built (Jasmine should have). But the east is not the issue, it's the west, which is far more expansive.
I have nothing against the Byron tunnel. The linear park is well appreciated and an important greenspace. I think the moderately priced and very disruptive cut-and-cover was a good compromise. Look at Toronto's Vaughn extension, where they bored a huge tunnel under a TTC rail depot, vacant land and industrial areas. To boot, stations are ridiculously huge, Cathedrals of transit, where they have Pimisi/Lees/Grennboro level ridership. Now that was a waste, but of course, they get blank cheques and can do what they want, unlike us who have to nickel and dime.
Quote:
Originally Posted by zzptichka
I heard they built REM at $100M/km.
How much is Phase 3 into Barrhaven that runs mostly through empty fields? $500M per km?
|
Can't compare. Transit inflation has been crazy all over North America. Stage 1, with heavy tunneling and large stations was only slightly more expensive than REM. Stage 2, a far simpler project, was moderately cheaper than REM. Anything pandemic/post-pandemic is through the roof.
Quote:
Originally Posted by lrt's friend
We also bit off more than this city could handle with Phase 1 designed to end all commuter service in one step.
This was never about improving transit in Ottawa, which is shocking. It was more about getting rid of as many buses as possible. Trains designed to run slower than the buses that they replaced should have been a big red flag, but the politicians never understood this when they suggested a 15 minute time saving that was never in the cards. The politicians who approved the Confed Line never understood the capabilities or the lack of same when they approved the design including the trains chosen.
I expect that Phase 2 of the Trillium Line will be a shambles as well.
|
For sure, I think we went to far with the service rebuild once the train opened. Even before it opened in anticipation for dates that came and went. Re-routing the entire network to depend on the train was a mistake. I think we should have maybe at least kept the west and south express buses so that people didn't have to transfer for a short ride from Tunney's to Downtown.
Although I don't have a lot of faith in TNext, I think Line 2 reopening should go relatively well. We're talking big, heavy diesel trains. I do worry about Dow's Lake station's capacity, and the overall capacity, however.
Quote:
Originally Posted by phil235
I'm sure that is the hope, but the massive elevated guideway and elevated stations won't attract that same kind of urban development that the O-Train will, as our stations are much more integrated/integratable into the urban fabric. You can conceivably get an island of towers around the station in the corner of the Fairview Pointe Claire parking lot (likely sitting on 6 stories of above ground parking so no one has to live under the tracks), but everyone else will be driving or taking the bus to the station.
|
I'd say Lees to Algonquin are well intergraded. Arguably to Pinecrest. But Bayshore might be worse than elevated, and certainly Moodie (though that's a location thing).
In the east, the problem with Hurdman is the offset bus loop that takes up a lot of space, towers that are far from the station. No sure how they'll ever develop TOD that's well integrated.
Tremplay's issue is the road/highway network. Same with Cyrville. Blair is Bayshore level terrible for anyone who lives north of the station. Montreal has nothing around it. The Orleans stations I don't think will be terrible (though quite an incline over the bridge to access), but they are not well intergraded by any stretch.
Quote:
Originally Posted by phil235
Point taken. I'm not advocating for subways everywhere, but in true urban neighbourhoods, they are much more conducive to real urban growth. And in my opinion, something like the O-Train trench along Scott is preferable to an elevated line. Plus you can cover it at some point in the future when it makes sense.
|
I disagree. Scott would have been better as elevated (in a scenario where the trench was never built) as it would allow permeability under the guideway. Agreed though, that the trench is ultimately better if it's capped however, I don't see that happening. Even with a lack of greenspace in the Ward, no one is talking about it.
Quote:
Originally Posted by lrt's friend
R1 Express is so fast, it completes the trip from Blair to downtown faster than the train when it runs. Hmmmm. Just as I said, we built a train that runs slower than the buses that it replaced.
|
Quote:
Originally Posted by 1overcosc
Because there's no traffic. You can take any rapid transit line anywhere in the world and if there's no traffic you can beat it in a car.
|
Yup, cause summer. In September, the R1xpress could be quite different.
Quote:
Originally Posted by OCCheetos
"Why is my train slower than the bus that skips 6 whole stations and drives straight down the highway?"
HMMM I WONDER WHY
Let me know how everyone at St-Laurent, Hurdman, Lees, and uOttawa are enjoying this express service.
|
Had the same thought. Lees and uOttawa probably not too bad with school being out, but St. Laurent and Hurdman serve dense urban populations (via bus transfers). I'd love to see a map with frequencies per station.
Quote:
Originally Posted by Tesladom
We can all agree that the previous Transitway system (Express + "9x" bus) was much quicker. I know it doesn't scale, but I would be curious to see how well it would work if they had a transitway tunnel as opposed to Slater/Albert
|
Had we built the bus tunnel in the 90s as planned, I don't think we would have needed to convert the Transitway. At that point, the N/S line would have made sense.