HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jul 26, 2023, 12:50 PM
inter777 inter777 is offline
 
Join Date: Feb 2021
Posts: 278
Quote:
Originally Posted by Innsertnamehere View Post
Where are you hearing that? CPKC just paid $300+ million for the existing tunnel in 2020. Do they need an extra track for capacity or something?
I heard it from Rhys Trenhaile in a podcast or video, can't remember. From what I understood the existing rail tunnel will be converted to passenger service with Amtrak bringing back their Chicago-Detroit-Toronto route. A new much larger rail tunnel will be built to handle taller freight trains.

I found this transportation project in pre design stage that is valued at $15bn. Wonder if this is our new rail tunnel.

https://canada.constructconnect.com/dcn/...ada/5ECE9A0B-E4FF-40AB-A1F3-39207E99D5FC
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 9:35 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.