Quote:
Originally Posted by Uhuniau
A sampling:
Feasibility study of a sidewalk along Buena Vista Rd from Springfield Rd to Lisgar Rd.
Feasibility study of a crossing of Banner Rd at Nancy Ave.
Feasibility study of pedestrian crossings of Colonnade Rd near Nepean Pond Park and 38 Colonnade Rd.
Sidewalk along Merivale Rd between Pineglen Cres and MacFarlane Rd and feasibility study of a pedestrian crossing of Merivale Rd at Brookdale Ave.
Feasibility review of a pedestrian crossing of Tapiola Cres east of White Clover Priv.
Feasibility study of pedestrian crossings of Walkley Rd at Heron Rd and Canterbury High School.
Feasibility study of pedestrian facilities along Provost Dr from McCarthy Rd to Thorndale Dr.
Feasibility study of pedestrian facilities along Echo Dr from Bank St to Colonel By Dr and a crossing of Colonel By Dr.
Feasibility study of pedestrian facilities along the south side of Heron Rd from Walkley Rd to the existing sidewalk.
Pathway from Russell Rd to Sheffield Glen Park path. Feasibility review of a crossing of Southvale Cres at Sheffield Glen Park.
Feasibility study of sidewalk along Constance Bay Rd between Allbirch Rd and Bayview Dr.
Feasibility study of pedestrian facilities along Meadow Dr from Greely Community Centre to Parkway Rd. Yes, all of these are feasible.
That will be, I dunno, $900,000 in very expert sidewalk feasibility study moneys, please.
|
You are probably right that they most/all are feasible, but I'm also sure there is some reason staff think they are more challenging than the other projects. I wish City staff were bolder and more assertive, but I think that hope went out the window when the City elected the current Mayor.