Quote:
Originally Posted by Catenary View Post
This isn't conclusive evidence, but all the Trillium Line rail I've seen was stamped 2001, and I was always under the impression that it was replaced in full (tunnels and bridges excepted) shortly after opening. When the line opened, it was jointed rail and service was every 20 minutes. Upgrading to CWR got them to the 15 minute service that lasted until the changes in 2013-2015.
According to Colin Churcher's Railway Pages, the track was replaced with CWR in 2004. I am not sure how much this cost, but it certainly wasn't included in the initial $21 million.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:23 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.