Originally Posted by Stacmon
I haven't been out for walks as often as a few months ago, but those have been great for getting a sense of the progress of stations, especially Jeanne D'Arc and Place D'Orleans given that I am in Northwest Orleans. My future local station (12 minute walk) is Convent Glen and there had been no work directly done on it for a long time (just a lot of infrastructure work on the sides of the highway). December I think will be the month when that work finally gets off the ground and since it is the last station on the Eastern Stage 2 expansion to be worked on and the closest to me, I am very excited to see that progress!
Before we know it, those stations will take shape and we will feel very close to the launch of Stage 2 (even if another year and a half may be left as they continue interior work, preparing the track infrastructure, a hopefully thorough period of testing, etc.)
|
Can't wait to see tracks being laid and steel structures going up and stations. Impressive progress in the east and west so far, compared to what should have been the far simpler south.
|