HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


    Claridge Icon in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • Ottawa Skyscraper Diagram

• Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 2, 2021, 1:52 AM
OttawaCondo OttawaCondo is offline
Registered User
 
Join Date: Jul 2020
Posts: 6
Quote:
Originally Posted by OTSkyline View Post
Insides look bare as well.. wonder how the interior construction is coming along.

I thought the new occupancy date was something like Sept-Oct of this year. Doesn't looks like it. Anybody have any info on when that will be?
Occupancy starting in November, 1 floor per week. Not a guaranteed move in date though. For something like the 40th floor, occupancy would be like 48 weeks away , so they have time to complete the interiors for sure
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 7:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.